Plan Review Details - Permit 22090680
Plan Review Stops For Permit 22090680
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-10-26 Cont ID  
Sent By cpuell Date 2022-10-26 Time 11:05 Rev Time 0.00
Received By cpuell Date 2022-10-26 Time 11:05 Sent To  
Notes
2022-10-26 11:10:03PROJECT HAS BEEN ASSIGNED THE ADDRESS OF 510 DATURA ST,
 SINCE NO DEMO PERMIT WAS APPLIED FOR 506 DATURA ST AND
 514 DATURA ST WILL BE RETIRED ONCE THE BUILDING PERMIT
 IS APPLIED FOR. ADDITIONAL ADDRESSES OF 520 DATURS ST
 (MANAGEMENT AND LEASING OFFICE) 229 QUADRILLE PLAZA DR
 (HOTEL) AND 249 QUADRILLE PLAZA DR HAVE BEEN EARMARKED
 FOR THE FROUND FLOOR BUT WILL NOT BE ACTIVATED UNTIL
 THE BUILDING PERMIT IS APPLIED FOR. REPLAT IS TO BE
 DONE FOR THE THREE PARCELS, PLEASE EMAIL PRELIMINARY
 LETTER FOR PCN FROM THE COUNTY TO [email protected]
 ONCE IT HAS BEEN RECIEVED.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-10-06 Cont ID  
Sent By cpuell Date 2022-10-06 Time 11:54 Rev Time 0.00
Received By cpuell Date 2022-10-06 Time 11:54 Sent To  
Notes
2022-10-06 11:57:53PER THE PPRC COMMENTS DEVELOPMENT SERVICES DEPARTMENT,
 BUILDING DIVISION, COMMENTS:
 11. BUILDING ADDRESS. EACH SEPARATE BUILDING, AND UNIT
 WITH AN INDEPENDENT ENTRANCE FROM THE STREET, SHALL
 HAVE A SEPARATE ADDRESS ASSIGNED BASED ON THE LOCATION
 OF THE BUILDING ENTRANCE. FOR STREET ADDRESSING,
 CONTACT CAROLINE PUELL, ADDRESSING COORDINATOR, AT
 (561) 805 6659, OR BY EMAIL: [email protected]
  
 PLEASE CONTACT [email protected] OR CALL 561-805-6659 SO
 THAT ADDRESS CAN BE ASSIGNED FOR THIS PROJECT. PLEASE
 EMAIL A SITE PLAN AND A GROUND FLOOR PLAN TO SEE WHAT
 ADDRESS WILL BE APPROPRIATE FOR THE PROJECT.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2023-02-06 Cont ID  
Sent By rmcphers Date 2023-02-06 Time 09:11 Rev Time 0.00
Received By rmcphers Date 2023-02-06 Time 09:11 Sent To  
Notes
2023-02-06 09:13:12FYI - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER
 SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS,
 THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT
 FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER
 PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION
 DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE
 HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE
 FOUNDATION OR OTHER PARTS OF A
 BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN
 RISK WITH THE BUILDING OPERATION AND
 WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2023-01-19 Cont ID  
Sent By rmcphers Date 2023-01-19 Time 12:35 Rev Time 0.00
Received By rmcphers Date 2023-01-19 Time 12:32 Sent To  
Notes
2023-01-19 12:35:37FOUNDATION FOR A NEW HOTEL/APARTMENT BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 2ND REVIEW NO CHANGES
  
 CORRECTIONS NEEDED -
 REVIEWED FOR FOUNDATION PERMIT ONLY
  
 1) GEOTECHNICAL REPORT NEEDS TO SHOW AS DIGITALLY
 SIGNED IN ADOBE READER - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).
  
  
  
 FYI - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER
 SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS,
 THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT
 FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER
 PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION
 DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE
 HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE
 FOUNDATION OR OTHER PARTS OF A
 BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN
 RISK WITH THE BUILDING OPERATION AND
 WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-12-21 Cont ID  
Sent By rmcphers Date 2022-12-21 Time 12:42 Rev Time 0.00
Received By rmcphers Date 2022-12-21 Time 12:42 Sent To  
Notes
2022-12-21 12:43:25FOUNDATION FOR A NEW HOTEL/APARTMENT BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 2ND REVIEW NO CHANGES
  
 CORRECTIONS NEEDED -
 REVIEWED FOR FOUNDATION PERMIT ONLY
  
 1) PLEASE READ AND FILL OUT THE REQUIRED DOCUMENTS AND
 PROVIDE THE REQUIRED COPIES OF LICENSES PER THE
 "GUIDELINES AND POLICIES FOR PROJECTS CONCERNING
 THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS".
 YOU CAN E MAIL ME AND ASK FOR A COPY.
  
 2) PLEASE PROVIDE A SOILS REPORT.
  
 3) A SEPARATE PERMIT IS REQUIRED FOR THE DEMO OF
 EXISTING BUILDINGS.
  
 FYI - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER
 SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS,
 THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT
 FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER
 PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION
 DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE
 HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE
 FOUNDATION OR OTHER PARTS OF A
 BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN
 RISK WITH THE BUILDING OPERATION AND
 WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-11-03 Cont ID  
Sent By rmcphers Date 2022-11-03 Time 09:43 Rev Time 0.00
Received By rmcphers Date 2022-11-02 Time 08:52 Sent To  
Notes
2022-11-03 09:43:30FOUNDATION FOR A NEW HOTEL/APARTMENT BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
 REVIEWED FOR FOUNDATION PERMIT ONLY
  
 1) PLEASE READ AND FILL OUT THE REQUIRED DOCUMENTS AND
 PROVIDE THE REQUIRED COPIES OF LICENSES PER THE
 "GUIDELINES AND POLICIES FOR PROJECTS CONCERNING
 THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS".
 YOU CAN E MAIL ME AND ASK FOR A COPY.
  
 2) PLEASE PROVIDE A SOILS REPORT.
  
 3) A SEPARATE PERMIT IS REQUIRED FOR THE DEMO OF
 EXISTING BUILDINGS.
  
 FYI - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER
 SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS,
 THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT
 FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER
 PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION
 DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE
 HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE
 FOUNDATION OR OTHER PARTS OF A
 BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN
 RISK WITH THE BUILDING OPERATION AND
 WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2023-01-25 Cont ID  
Sent By mpeterso Date 2023-01-25 Time 13:38 Rev Time 0.00
Received By mpeterso Date 2023-01-25 Time 13:33 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2023-01-05 Cont ID  
Sent By mpeterso Date 2023-01-05 Time 12:45 Rev Time 0.00
Received By mpeterso Date 2023-01-05 Time 12:45 Sent To  
Notes
2023-01-05 12:46:47ELECTRIC REVIEW FAILED
 1) PREVIOUS COMMENTS NOT ADDRESSED, SEE PREVIOUS
 COMMENTS
  
 PLEASE DETAIL SIZING CALCULATIONS FOR HANDHOLE.
  
 PLEASE INDICATE HOW THE EMERGENCY SYSTEM WILL BE KEPT
 COMPLETELY INDEPENDENT OF ALL OTHER WIRING AS PER NEC
 700.10 (B)
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-10-24 Cont ID  
Sent By mpeterso Date 2022-10-24 Time 09:30 Rev Time 0.00
Received By mpeterso Date 2022-10-24 Time 09:14 Sent To  
Notes
2022-10-24 10:33:01ELECTRIC REVIEW FAILED
 1) PLEASE PROVIDE DETAILS AS TO THE MANHOLE IS SIZED IN
 COMPLIANCE WITH NEC 110.74 (A) NEC 314.28
 2) PLEASE PROVIDE DETAILS ON HOW MANHOLE IS IN
 COMPLIANCE WITH NEC 700.10(B)
  
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop ENG ENGINEERING CSD
Rev No 4 Status F Date 2023-02-06 Cont ID  
Sent By rrossano Date 2023-02-06 Time   Rev Time 0.00
Received By rrossano Date 2023-02-06 Time   Sent To  
Notes
2023-02-06 12:12:58UNDER FORMAL ENGINEERING SUBMITTAL REVIEW.

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2023-01-23 Cont ID  
Sent By rrossano Date 2023-01-23 Time   Rev Time 0.00
Received By rrossano Date 2023-01-23 Time   Sent To  
Notes
2023-01-23 18:08:43UNDER FORMAL ENGINEERING SUBMITTAL.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-12-27 Cont ID  
Sent By rrossano Date 2022-12-27 Time   Rev Time 0.00
Received By rrossano Date 2022-12-27 Time   Sent To  
Notes
2022-12-27 08:20:26UNDER FORMAL ENGINEERING SUBMITTAL REVIEW.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-10-13 Cont ID  
Sent By rrossano Date 2022-10-13 Time   Rev Time  
Received By rrossano Date 2022-10-13 Time   Sent To  
Notes
2022-10-13 12:13:08UNDER FORMAL ENGINEERING SUBMITTAL REVIEW.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-10-07 Cont ID  
Sent By pleduc Date 2022-10-07 Time   Rev Time 0.00
Received By pleduc Date 2022-10-05 Time 14:13 Sent To  
Notes
2022-10-07 16:28:59FOUNDATION ONLY AS PER THE APPLICATION
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-02-07 Cont ID  
Sent By aoliver Date 2023-02-07 Time 08:59 Rev Time 0.00
Received By aoliver Date 2023-02-03 Time 12:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-25 Cont ID  
Sent By mpeterso Date 2023-01-25 Time 13:38 Rev Time 0.00
Received By mpeterso Date 2023-01-18 Time 11:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-01-05 Cont ID  
Sent By mpeterso Date 2023-01-05 Time 13:06 Rev Time 0.00
Received By mpeterso Date 2022-12-20 Time 09:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-08 Cont ID  
Sent By aoliver Date 2022-12-08 Time 08:04 Rev Time 0.00
Received By aoliver Date 2022-10-04 Time 09:51 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-11-03 Cont ID  
Sent By rmcphers Date 2022-11-03 Time 09:44 Rev Time 0.00
Received By rmcphers Date 2022-11-03 Time 09:43 Sent To  
Notes
2022-11-03 09:45:14PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-12-22 Cont ID  
Sent By ccole Date 2022-12-22 Time 14:28 Rev Time 0.00
Received By ccole Date 2022-12-22 Time 13:44 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-10-17 Cont ID  
Sent By ccole Date 2022-10-17 Time 12:01 Rev Time 0.00
Received By ccole Date 2022-10-17 Time 10:56 Sent To  
Notes
2022-10-17 12:01:351ST REVIEW FBC-2020 PLUMBING
 PERMIT- 22090680
 10/17/22
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET PF1.00: THE PLAN SHOWS A GREASE INTERCEPTOR
 WHICH WILL REQUIRE A SEPARATE PERMIT AND PLAN
 SUBMITTAL- SEC. 107.2.1 WPB. THE SUBMITTED PLUMBING
 PLANS FOR THE BUILDING WILL NOT BE APPROVED UNTIL A
 PERMIT APPLICATION FOR THE INTERCEPTOR HAS BEEN
 SUBMITTED.. YOU CAN SUBMIT AN APPLICATION TBD (TO BE
 DETERMINED) IF YOU DO NOT HAVE A CONTRACTOR SELECTED BY
 EMAILING A COMPLETED PERMIT APPLICATION TO
 [email protected]. YOU WILL RECEIVE INSTRUCTIONS
 TO PAY FEES AND UPLOAD PLANS. YOU MAY UPLOAD PLANS AND
 PAY FEES AT A FUTURE DATE, BUT THE APPLICATION IS
 REQUIRED AT THIS TIME. WE RECOMMEND THAT YOU PAY FEES
 AND UPLOAD PLANS AT THE SAME TIME. AFTER YOU HAVE THE
 PERMIT GENERATED, NOTIFY ME VIA EMAIL AND I WILL CHANGE
 THE REVIEW STATUS TO PASS.
  
 2) PF1.00- AS NOTED ABOVE THE INTERECEPTOR SHALL BE
 INSTALLED UNDER A SEPARATE PERMT. A COMPLETE PLAN
 SUBMITTAL WILL BE REQUIRED AT THAT TIME WHICH SHALL
 INCLUDE THE FOLLOWING ITEMS:
 A) MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
 GUIDELINES WITH APPROVAL STAMP BY THE ENGINEER OF
 RECORD- SECS.1003.3.5 OR 1003.3.7 FBC P.
 B) EQUIPMENT SCHEDULE INDICATING THE MAKE AND MODEL AND
 CAPACITY OF THE UNIT.
 C) SIZING CALCULATIONS IN ACCORDANCE WITH ASME
 A112.14.3, ASME A112.14.4, ASME A112.14.6, CSA B481.3,
 OR PDI G101 FOR HYDROMECHANICAL TYPES; OR SEC. 1003.3.7
 FOR GRAVITY TYPES.
 D) DIMENSIONED TANK BURIAL, ANCHORING, AND BACKFILLING
 DETAILS
 E) ENLARGED PIPING DIAGRAM INCLUDING LOCATIONS AND
 SIZES OF INLETS, OUTLETS, CLEANOUTS, FLOW CONTROL
 VENTS, AND SAMPLING PORTS
 F) ACCESS LID DETAILS INDICATING THE LIDS WILL BE HEAVY
 DUTY TRAFFIC RATED AND WILL BE EQUIPPED WITH ACCESS
 RESTRICTORS. HEAVY DUTY LIDS ARE ALSO REQUIRED FOR
 CLEANOUTS, AND SAMPLING PORTS (IF INSTALLED).
  
 3) PF1.00: PROVIDE EQUIPMENT SCHEDULES FOR THE SUMP
 PUMPS AND ENLARGED, TYPICAL PIT AND PLUMBING PIPING
 DETAILS- SEC. 712 FBC P. PLEASE NOTE THE DRAINAGE FROM
 THE PITS SHALL BE DISCHARGED INTO AN OIL INTERCEPTOR
 UNLESS THE PUMPS ARE EQUIPPED WITH AN APPROVED ALARM
 SYSTEM. THE CURRENT PLAN SHALL BE REVISED TO SHOW THE
 LOCATIONS OF THE REQUIRED INDIRECT WASTE RECEPTORS THAT
 WILL RECEIVE THE DRAINAGE FROM THE SUMP PUIMPS.
  
 4) PF100: SUBMIT COMPLETE SANITARY DRAINAGE AND VENT
 RISER DRAWINGS THAT SHOW THE MAIN SOIL, WASTE, AND VENT
 STACKS- SEC. 107.3.5.1.3 WPB. PLEASE INCLUDE DFU
 CALCULATIONS WITH THE DRAWINGS- SEC.710.1 FBC P. PLEASE
 REVISE PF100 TO SHOW LOCATIONS OF VENT STACK
 CONNECTIONS WHERE REQUIRED- SEE SEC. 904.4 FBC P.
  
 5) PF100: SUBMIT STORM DRAINAGE AND CONDENSATE DRAINAGE
 RISER DRAWINGS- SEC. 107.3.5.1.3 WPB. PLEASE INCLUDE
 THE GPM FLOW RATES AT AT THE ROOF DRAIN LOCATIONS, AND
 THE ACCUMULATIVE FLOW THROUGH THE BUILDING TO THE
 GROUND LEVEL MAIN HORIZONTAL STORM DRAIN PIPES- SEC.
 1106.1, TABLES 1106.2 & 1106.3 FBC P.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P-GREASE GREASE INTERCEPTOR/TRAP REVIEW
Rev No 1 Status N Date 2022-12-22 Cont ID  
Sent By ccole Date 2022-12-22 Time 14:29 Rev Time 0.00
Received By ccole Date 2022-12-22 Time 14:29 Sent To  
Notes
2022-12-22 14:30:08A SEPARATE PERMIT AND PLANS ARE REQUIRED FOR THE
 INTERCEPTOR. NO REVIEW UNDER THIS PERMIT.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2023-02-06 Cont ID  
Sent By rmcphers Date 2023-02-06 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2023-02-06 Time 09:13 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2023-01-19 Cont ID  
Sent By rmcphers Date 2023-01-19 Time 12:36 Rev Time 0.00
Received By rmcphers Date 2023-01-19 Time 12:36 Sent To  
Notes
2023-01-19 12:36:56SIGNATURE REVIEW
  
 1) GEOTECHNICAL REPORT NEEDS TO SHOW AS DIGITALLY
 SIGNED IN ADOBE READER - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-12-21 Cont ID  
Sent By rmcphers Date 2022-12-21 Time 12:43 Rev Time 0.00
Received By rmcphers Date 2022-12-21 Time 12:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-03 Cont ID  
Sent By rmcphers Date 2022-11-03 Time 09:59 Rev Time 0.00
Received By rmcphers Date 2022-11-03 Time 09:59 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2023-01-19 Cont ID  
Sent By rmcphers Date 2023-01-19 Time 12:37 Rev Time 0.00
Received By rmcphers Date 2023-01-19 Time 12:37 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-06 Cont ID  
Sent By ckimmerl Date 2022-12-06 Time 12:22 Rev Time 0.00
Received By ckimmerl Date 2022-12-06 Time 12:16 Sent To  
Notes
2022-11-16 14:06:26SETBACKS AND FOUNDATION OKAY.
  
  
 STAFF HAS NOTED CHANGES TO ARCHITECTURAL AND SITE
 SPECIFIC DRAWINGS, WHEN PROJECT COMES IN FOR VERTICAL
 OR STRUCTURAL PERMITS, WILL HAVE TO ADDRESS CHANGES
 WITHIN AS-BUILTS OR SUBMIT FOR MINOR SITE PLAN
 AMENDMENT.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved