Plan Review Stops For Permit 22090157 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2022-10-12 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-10-12 |
Time |
09:56 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-10-12 |
Time |
09:56 |
Sent To |
|
|
Notes |
2022-10-12 09:56:57 | ADDRESS CHANGED FROM 3301 TO 3302 GREENWOOD AVE BECAUSE | | 3301 IS AN ODD NUMBER AND THE PARCEL IS ON THE EVEN | | SIDE OF THE STREET. UPDATED PERMIT. |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2022-09-07 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-09-07 |
Time |
09:20 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-09-07 |
Time |
09:20 |
Sent To |
|
|
Notes |
2022-09-07 09:25:37 | A NEW ADDRESS NEEDS TO BE ASSIGNED, THIS PARCELS | | ADDRESS IS CURRENTLY AN ODD ADDRESS ON THE EVEN SIDE OF | | THE STREET. PLEASE HAVE THE OWNER CONTACT | | [email protected] OR CALL 561-805-6659 TO DISCUSS | | ADDRESSING OPTIONS |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-12-03 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-12-03 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-12-02 |
Time |
15:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-10-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-10-19 |
Time |
12:23 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-10-19 |
Time |
10:03 |
Sent To |
|
|
Notes |
2022-10-19 12:30:41 | 1ST BUILDING REVIEW | | RESULTS: CORRECTIONS NEEDED | | | | CHRISTOPHER S. THROOP, CBO, BN, PX, CFM | | PLANS EXAMINER II | | CITY OF WEST PALM BEACH | | (561) 805-6726 | | [email protected] | | | | CODES IN EFFECT: | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | CHAPTER 1 ADMINISTRATION | | NFPA 70 2017 EDITION NEC 2017 | | | | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: | | | | NOTICE: VALUE HAS BEEN ADJUSTED TO $243,775.00 PER THE | | ICC BUILDING VALUATION DATA. | | | | 1.PROVIDE A COPY OF THE MOST RECENT BOUNDARY LINE | | SURVEY. | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | 107.2.5. | | | | 2. PROVIDE CURRENT PRODUCT APPROVALS OR NOA FOR | | PROPOSED WINDOWS AND DOORS. | | PRODUCT APPROVALS INCLUDE THE COVER SHEET, EVALUATION | | REPORT AND INSTALLATION INSTRUCTIONS. | | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | 3. PLAN PAGE A-3 STATES ROOF IS UNVENTED WITH R-30 | | SPRAY FOAM INSULATION. ENERGY SUBMITTAL USES R-20 IN | | IT'S CALCULATION. | | PLEASE REVIEW AND CORRECT. | | 107.2 CONSTRUCTION DOCUMENTS SHALL BE IN ACCORDANCE | | WITH SECTIONS107.2.1 THROUGH 107.2.5. | | | | 4. PROVIDE STRUCTURAL DETAIS FOR RETAINING WALL. | | 107.2 CONSTRUCTION DOCUMENTS SHALL BE IN ACCORDANCE | | WITH SECTIONS107.2.1 THROUGH 107.2.5. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-11-22 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-11-22 |
Time |
20:51 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-11-22 |
Time |
20:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-09-29 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-09-29 |
Time |
21:17 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-09-28 |
Time |
19:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2022-12-05 |
|
|
Cont ID |
|
Sent By |
amhamilt |
Date |
2022-12-05 |
Time |
16:37 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-12-05 |
Time |
16:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
F |
Date |
2022-10-06 |
|
|
Cont ID |
|
Sent By |
amhamilt |
Date |
2022-10-06 |
Time |
15:13 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-10-06 |
Time |
15:13 |
Sent To |
|
|
Notes |
2022-10-06 15:15:16 | THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S) | | | | PER HPB DECISION: | | | | 1. ALL WINDOWS SHALL HAVE EXTERNAL, DIMENSIONAL MUNTINS | | WITH EITHER A PYRAMID OR OGEE PROFILE. ALL STREET OR | | SIDEWALK FACING GLASS SHALL BE CLEAR. ALL NON-STREET | | FACING GLASS SHALL BE CLEAR OR CLEAR WITH LOW E | | COATING. | | 2. ALL SHUTTERS SHALL BE PROPORTIONATELY SIZED AND | | SHALL MEASURE THE FULL HEIGHT AND ONE-HALF THE WIDTH OF | | THE WINDOW FRAME | | | | PLEASE INDICATE THIS SOMEWHERE ON PLANS. ADDITIONALLY, | | SHUTTERS APPEAR TO NOT BE PROPORTIONALLY SIZED ON | | ELEVATIONS, PLEASE ADDRESS. | | | | ANNE HAMILTON | | HISTORIC PRESERVATION PLANNER | | [email protected] | | 561.822.1428 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-12-07 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-12-07 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-11-03 |
Time |
08:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-10-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-10-19 |
Time |
12:30 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-09-07 |
Time |
06:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2022-12-12 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-12-12 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-12-07 |
Time |
10:30 |
Sent To |
|
|
Notes |
2022-12-12 10:53:22 | NO IMPACT FEES DUE. LEM | 2022-12-07 10:30:33 | EMAILED IMPACT FOR REVIEW-AO |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2022-10-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-10-19 |
Time |
10:51 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-10-19 |
Time |
10:03 |
Sent To |
|
|
Notes |
2022-10-19 10:51:49 | IMPACT FEES | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | APPROVAL AND FEE PAYMENT (IF ANY), PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2022-11-14 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-11-14 |
Time |
17:19 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-11-14 |
Time |
17:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2022-09-13 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-09-13 |
Time |
17:19 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-09-13 |
Time |
17:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-11-04 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-11-04 |
Time |
08:58 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-09-15 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-09-15 |
Time |
08:52 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-09-15 |
Time |
08:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
N |
Date |
2022-10-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-10-19 |
Time |
11:27 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-10-19 |
Time |
10:03 |
Sent To |
|
|
Notes |
2022-10-19 11:28:38 | PROVISO ON PLAN PAGE A-3: A SEPERATE ROOFING PERMIT IS | | REQUIRED. CT |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-11-17 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-11-17 |
Time |
09:06 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-11-14 17:22:03 | MECHANICAL DIGITAL SIGNATURE APPROVED ME |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-10-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-10-19 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-10-19 |
Time |
10:03 |
Sent To |
|
|
Notes |
2022-10-19 11:14:07 | ALL PLAN PAGES DATED 9/6/22. CT |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-12-05 |
|
|
Cont ID |
|
Sent By |
amhamilt |
Date |
2022-12-05 |
Time |
16:39 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-12-05 |
Time |
16:39 |
Sent To |
|
|
Notes |
2022-12-05 16:39:46 | ALL DRIVEWAYS, MECHANICAL, PAVEMENT, FENCES, WALLS TO | | BE PERMITTED SEPARATELY. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-10-06 |
|
|
Cont ID |
|
Sent By |
ahamilto |
Date |
2022-10-06 |
Time |
15:16 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-10-06 |
Time |
15:16 |
Sent To |
|
|
Notes |
2022-10-06 15:44:36 | THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S) | | | | - NEW CONSTRUCTION REQUIRES SUBMITTAL OF A SEPARATE | | LANDSCAPE PERMIT PRIOR TO ZONING APPROVAL MOVING | | FORWARD. PLEASE APPLY FOR A LANDSCAPE PERMIT | | - PROPOSED DRIVEWAY SIDE SETBACK IS ONLY 2'2", REQUIRED | | TO BE 3' WITHIN FRONT 25' SETBACK. PLEASE REVISE. | | - ALL DRIVEWAYS, MECHANICAL, PAVEMENT, FENCES, WALLS TO | | BE PERMITTED SEPARATELY. | | | | ANNE HAMILTON | | HISTORIC PRESERVATION PLANNER | | [email protected] | | 561.822.1428 | | |
|
|