Plan Review Details - Permit 22081116
Plan Review Stops For Permit 22081116
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-08-29 Cont ID  
Sent By rrossano Date 2022-08-29 Time   Rev Time  
Received By rrossano Date 2022-08-29 Time   Sent To  
Notes
2022-08-29 11:35:42PASSED WITH PROVISOS:
  
 SHOW ANY WATER METERS, SANITARY CLEANOUTS, STORM INLETS
 ETC. IN VICINITY OF PROPOSED DRIVEWAY. DO NOT CONSTRUCT
 DRIVEWAY ON TOP OF WATER METERS, SANITARY CLEANOUTS,
 STORMWATER INLETS ETC.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-06 Cont ID  
Sent By asangele Date 2022-09-06 Time 12:57 Rev Time 0.00
Received By asangele Date 2022-09-06 Time 12:57 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-09-06 Cont ID  
Sent By asangele Date 2022-09-06 Time 12:57 Rev Time 0.00
Received By asangele Date 2022-09-06 Time 12:57 Sent To  
Notes
***NONE***