Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-05-09 Cont ID  
Sent By lquinone Date 2023-05-09 Time 13:46 Rev Time 0.00
Received By lquinone Date 2023-05-09 Time 13:46 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2023-02-13 Cont ID  
Sent By rrossano Date 2023-02-13 Time   Rev Time 0.00
Received By rrossano Date 2023-02-13 Time   Sent To  
Notes
2023-02-13 12:51:01REVISE DRAWING TO SHOW A MIN. 5 FT. LATERAL DISTANCE
 BETWEEN PROPOSED DRIVEWAY/FLARE, AND EXISTING FIRE
 HYDRANT. COULD BE OBTAINED BY NARROWING WIDTH OF
 PROPOSED DRIVEWAY.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-08-23 Cont ID  
Sent By rrossano Date 2022-08-23 Time   Rev Time  
Received By rrossano Date 2022-08-23 Time   Sent To  
Notes
2022-08-23 10:53:47INDICATE AREAS OF PROPOSED DRIVEWAY CONSTRUCTION ON A
 COPY OF THE PROPERTY SURVEY. DIMENSION DRIVEWAYS,
 LOCATED HORIZONTALLY AND VERTICALLY. CALL OUT MIN. 3
 FT. SETBACK FROM EDGE OF PROPOSED DRIVEWAY TO PROPERTY
 LINE. SHOW ANY WATER METERS, SANITARY CLEANOUTS, STORM
 INLETS ETC. IN VICINITY OF PROPOSED DRIVEWAY. DO NOT
 CONSTRUCT DRIVEWAY ON TOP OF WATER METERS, SANITARY
 CLEANOUTS, STORMWATER INLETS ETC.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT
 WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR
 DRIVEWAYS.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-05-10 Cont ID  
Sent By lmarchan Date 2023-05-10 Time 10:56 Rev Time 0.00
Received By lmarchan Date 2023-05-04 Time 09:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-14 Cont ID  
Sent By aoliver Date 2023-02-14 Time 09:49 Rev Time 0.00
Received By aoliver Date 2023-02-06 Time 11:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-29 Cont ID  
Sent By vbroglia Date 2022-08-29 Time 15:09 Rev Time 0.00
Received By vbroglia Date 2022-08-18 Time 07:26 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status N Date 2023-05-10 Cont ID  
Sent By lmarchan Date 2023-05-10 Time 10:57 Rev Time 0.00
Received By lmarchan Date 2023-05-10 Time 10:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-05-08 Cont ID  
Sent By avolcy Date 2023-05-08 Time 15:26 Rev Time 0.00
Received By avolcy Date 2023-05-08 Time 15:26 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-02-13 Cont ID  
Sent By vbroglia Date 2023-02-13 Time 12:03 Rev Time 0.00
Received By vbroglia Date 2023-02-13 Time 12:03 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-08-29 Cont ID  
Sent By vbroglia Date 2022-08-29 Time 15:07 Rev Time 0.00
Received By vbroglia Date 2022-08-29 Time 15:07 Sent To  
Notes
2022-08-29 15:09:258/29/2022 FAILED
  
 PLEASE SHOW WHERE THE NEW PROPOSED DIRVEWAY IS LOCATED
 PLEASE SHOW THE FOLLOWING REQUIREMENT FOR LANDSCAPING
 IS MET:
  
 PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED
 OFF-STREET PARKING SPACES FOR LESS THAN THREE
 RESIDENTIAL DWELLING UNITS SHALL BE PROVIDED ON THE
 PROPERTY ON WHICH THE UNITS ARE LOCATED. REQUIRED
 PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE
 LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT
 YARD AREA SHALL BE LANDSCAPED WITH LIVING PLANT
 MATERIAL (SUCH AS GRASS, GROUND COVER, SHRUBS, HEDGES,
 VINES OR TREES). PARKING AREAS LOCATED IN THE FRONT
 YARD SHALL BE SURFACED WITH A SMOOTH, NONDUSTING
 SURFACE IN COMPLIANCE WITH SUBSECTION 33-485(E). IT
 SHALL BE A VIOLATION OF THIS CHAPTER TO PARK ON ANY
 UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE.
  
 VALENTINA BROGLIA
 ASSOCIATE PLANNER