2022-07-29 08:54:48 | 1ST REVIEW FBC-2020 PLUMBING |
| PERMIT- 22071242 |
| 7/29/2022 |
| |
| CODES IN EFFECT: |
| FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) SHEET 1: PROVIDE THE RAIN FALL RATE USED FOR DESIGN |
| OF THE ROOF DRAINAGE SYSTEM AND SHOW GPM FLOW |
| CALCULATIONS BASED ON THE AREA OF THE ROOF- SECS. |
| 1105.2 & 1106.1 FBC P. PLEASE SEE TABLES 1106.2 & |
| 1106.3 FOR HORIZONTAL AND VERTICAL DRAIN PIPE SIZING. |
| 2) SHEET 1: PROVIDE DRAINAGE DIRECTION FLOW ARROWS ON |
| THE PLAN TO VERIFY DRAIN PLACEMENT COMPLIANCE- SEC. |
| 1105.2. |
| 3) SHEET 1: VERIFY THE DESIGN OF THE ROOF DOES NOT |
| INCLUDE A PARAPET ALONG THE PERIMETER OR PROVIDE |
| EMERGENCY ROOF DRAINAGE OR OVERFLOW SCUPPER DRAINAGE |
| DESIGN, CALCULATIONS AND DETAILS- SEC. 1108.1. |
| 4) SHEET 1: PROVIDE A ROOF DRAIN INSTALLATION DETAIL |
| AND SUBMIT MANUFACTURER?S SPECIFICATIONS- SEC. 1105.1. |
| 5) SHEET 1: THE PROPOSED DRAINAGE OUTFALL INTO THE |
| DRIVEWAY DOES NOT APPEAR TO BE AN APPROVED PLACE OF |
| DISPOSAL BASED ON SEC. 1101.2. PLEASE SHOW VERTICAL |
| LEADER TO STORM DRAIN CONNECTION LOCATION AND A |
| CONNECTION DETAIL- 1101.6. IF IT IS DETERMINED THE |
| DRAINAGE WILL FLOW INTO THE DRIVEWAY SHOW DIRECTION OF |
| FLOW ARROWS AND APPROVED VERTICAL LEADER TERMINATION |
| CAPS- SEC. 107.2.1 WPB. |
| 6) SHEET: THE ENGINEER OF RECORD FROM A.T. DESIGNS INC. |
| SHALL PROVIDE HIS DIGITAL SIGNATURE AND SEAL ON THE |
| ROOF DRAINAGE PLAN- FL. STATUTE 471.025 AND SECTION |
| 61G15-23.005 FLORIDA ADMINISTRATIVE CODE. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL/PLUMBING PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |