Plan Review Details - Permit 22071181
Plan Review Stops For Permit 22071181 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2022-08-02 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-08-02 |
Time |
|
Rev Time |
|
Received By |
rrossano |
Date |
2022-08-02 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
N |
Date |
2022-08-17 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2022-08-17 |
Time |
10:46 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2022-08-17 |
Time |
10:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-01-09 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-01-09 |
Time |
16:41 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-01-09 |
Time |
16:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
F |
Date |
2022-10-04 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-10-04 |
Time |
13:58 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-09-27 |
Time |
10:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-08-17 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-08-17 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-07-29 |
Time |
08:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2023-02-01 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-02-01 |
Time |
12:12 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-02-01 |
Time |
12:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-01-09 |
|
|
Cont ID |
|
Sent By |
ASangele |
Date |
2023-01-09 |
Time |
16:35 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-01-09 |
Time |
16:35 |
Sent To |
|
|
Notes |
2023-01-09 16:41:36 | FAILED | | 1/9/2023 | | | | PLEASE LABEL THE SETBACKS OF OF DRIVEWAY AND PATIO | | | | SINGLE DRIVEWAYS WIDTH CANNOT EXCEED 20FT | | | | THE FIRST 25FT OF THE FRONT SETBACK THERE IS A 3FT | | BUFFER FROM THE PROPERTY LINE WHERE DRIVEWAY/PAVEMENT | | CAN BE LOCATED. PAST THE FIRST 25FT THERE IS A 2FT | | BUFFER FROM THE PROPERTY LINE WHERE DRIVEWAY/PAVEMENT | | CAN BE LOCATED. | | | | THERE IS A FRONT LANDSCAPE REQUIREMENT | | THE LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE | | FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING PLANT | | MATERIAL (SUCH AS GRASS, GROUND COVER, SHRUBS, HEDGES, | | VINES OR TREES). | | | | | | ALEXIS SANGELEER | | PLANNER | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-10-04 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-10-04 |
Time |
13:18 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-10-04 |
Time |
13:18 |
Sent To |
|
|
Notes |
2022-10-04 13:57:48 | 0/04/22 FAILED | | | | PREVIOUS COMMENT NOT ADDRESSED FULLY, SEE BELOW | | | | ALL PARKING AREAS NEED TO BE SETBACK AT LEAST 5 FT FROM | | THE FRONT PROPERTY LINE. THIS ISNT SHOWN ON SOUTH | | PROPERTY LINE | | | | ADDITIONALLY, CITY CODE STATES THAT THE LESSER OF 75% | | OR 1000 SQ FEET OF THE FRONT YARD MUST BE LANDSCAPED | | WITH LIVING PLANT MATERIAL. HOWEVER, IF YOU ARE | | INTENDING TO USE A PERMEABLE PAVER SYSTEM, 60 PERCENT | | OF THE FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING | | PLANT MATERIAL. THE FRONT YARD IS MEASURED FROM THE | | FRONT OF THE BUILDING TO THE PROPERTY LINE, AND THE | | SURVEY SHOWS NEARLY THE ENTIRE FRONT YARD IS GOING TO | | BE PAVED.I HAVE ILLUSTRATED ON THE SITE PLAN WHERE YOUR | | FRONT YARD IS. ACCORDING TO COE, IT IT MEASURED FROM | | THE VERY FRONTMOST POINT OF THE BUILDING. THEREFORE, | | YOU ARE STILL PROPOSING TO PAVE NEARLY THE ENTIRE FRONT | | YARD | | ALEXANDER FOWLKES | | [email protected] | | 5618221431 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-08-08 |
Time |
09:31 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-08-04 |
Time |
16:15 |
Sent To |
|
|
Notes |
2022-08-05 10:48:55 | 08/05/22 FAILED | | | | ALL PARKING AREAS NEED TO BE SETBACK AT LEAST 3 FT FROM | | THE SIDE PROPERTY LINE AND 5 FT FROM THE FRONT PROPERTY | | LINE. THIS ISNT SHOWN ON THE EAST OR SOUTH PROPERTY | | LINES | | | | ADDITIONALLY, CITY CODE STATES THAT THE LESSER OF 75% | | OR 1000 SQ FEET OF THE FRONT YARD MUST BE LANDSCAPED | | WITH LIVING PLANT MATERIAL. HOWEVER, IF YOU ARE | | INTENDING TO USE A PERMEABLE PAVER SYSTEM, 60 PERCENT | | OF THE FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING | | PLANT MATERIAL. THE FRONT YARD IS MEASURED FROM THE | | FRONT OF THE BUILDING TO THE PROPERTY LINE, AND THE | | SURVEY SHOWS NEARLY THE ENTIRE FRONT YARD IS GOING TO | | BE PAVED. UPON RESUBMITAL, SHOW THE TOTAL SQ FOOTAGE OF | | THE PROPOSED DRIVEWAY SO I CAN MAKE THIS CALCULATION. | | | | ALEXANDER FOWLKES | | [email protected] | | 5618221431 |
|
|
|