Plan Review Stops For Permit 22071083 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2022-08-30 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-08-30 |
Time |
10:26 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-08-30 |
Time |
10:26 |
Sent To |
|
|
Notes |
2022-08-30 10:28:29 | APPLICANT EMAILED THE AREA WHERE THE WORK IS TO BE | | DONE. WHICH IS IN THE MEDIUM ON THE EAST ENTRANCE | | ACROSS FROM NORTHPOINT BLVD. THE ADDRESS FOR THAT | | PARCEL IS 4400 METROCENTRE BLVD N WITH THE PCN OF | | 74-43-43-06-12-000-0000 UPDATED PERMIT. |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2022-08-02 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-08-02 |
Time |
09:40 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-08-02 |
Time |
09:40 |
Sent To |
|
|
Notes |
2022-08-02 09:45:06 | PLEASE PROVIDE AN AERIAL PICTURE OR SITE PLAN SHOWING | | THE EXACT LOCATION OF THE SCOPE OF WORK. PLEASE EMAIL | | [email protected] OR CALL 561-805-6659. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-10-31 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-08-09 |
Time |
13:22 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-10-31 |
Time |
08:25 |
Sent To |
|
|
Notes |
2022-08-09 13:22:37 | BASED ON EMAILS RECIEVED THE ELCTRICAL WORK CONSISTS OF | | REPLACING EXISTING POLE LIGHTS. CHANGED RESULT TO PASS. | | MP |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
N |
Date |
2022-10-26 |
|
|
Cont ID |
|
Sent By |
rbrown |
Date |
2022-10-26 |
Time |
18:49 |
Rev Time |
0.00 |
Received By |
rbrown |
Date |
2022-10-26 |
Time |
18:49 |
Sent To |
|
|
Notes |
2022-10-26 18:52:06 | ENGINEERING REVIEW NOT REQUIRED BECAUSE THE LIGHT POLE | | IS TO REPLACE THE EXISTING ONE IN THE SAME LOCATION AS | | IT WAS STRUCK BY A CAR, AND THE LIGHT POLE IS NOT IN | | THE CITY RIGHT-OF-WAY. IT IS ON METROCENTRE CORP PARK | | PROPERTY. | | | | ROBERT BROWN | | E-MAIL: [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-10-06 |
|
|
Cont ID |
|
Sent By |
rbrown |
Date |
2022-10-06 |
Time |
21:18 |
Rev Time |
0.00 |
Received By |
rbrown |
Date |
2022-10-06 |
Time |
21:18 |
Sent To |
|
|
Notes |
2022-10-06 21:22:23 | NO SITE PLANS WAS SUBMITTED. ENGINEERING SERVICES | | DEPARTMENT HAS ADVISED US THAT THEY NEED TO KNOW | | WHETHER TE PROPOSED WORK IS IN THE RIGHT-OF-WAY BEFORE | | THEY WILL REVIEW. IF THE WORK IS IN THE RIGHT-OF-WAY, A | | ROGHT-OF-WAY PERMIT WILL BE REQUIRED AND YOU SHOULD | | CONTACT ROW PERMIT MAILBOX | | | | **QUOTE PERMIT# ON ALL CORRESPONDENCE** | | | | ROBERT BROWN, BUILDING OFFICIAL | | E-MAIL: [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-11-03 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-11-03 |
Time |
12:31 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-11-03 |
Time |
12:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-11-01 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-11-01 |
Time |
10:14 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-10-31 |
Time |
16:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-10-06 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-10-06 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-07-27 |
Time |
08:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2022-11-03 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-11-03 |
Time |
12:20 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-11-03 |
Time |
12:20 |
Sent To |
|
|
Notes |
2022-11-03 12:21:22 | 11/3/22 SIGNATURE REVIEW OF PAPER PLANS/DOCUMENTS | | PASSED AND ROUTED TO STORAGE.MP |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-11-01 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-11-01 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-11-01 |
Time |
10:13 |
Sent To |
|
|
Notes |
2022-11-01 10:14:53 | THE DOCUMENTS FROM THE DESIGN PROFESSIONAL ARE REQUIRED | | TO BE DIGITALLY SIGNED AND SEALED. ELECTRONICALLY | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT | | OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | ACCEPTABLE. FS 481 & FAC 61G1 OR FS 471 & FAC 61G15 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-08-09 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-08-09 |
Time |
13:21 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-08-09 |
Time |
13:21 |
Sent To |
|
|
Notes |
2022-08-09 13:22:04 | SIGNATURE REVIEW FAILED | | FS471/FS481 DOCUMENTS PREPARED BY ARCHITECT/ENGINEER OF | | RECORD AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | DIGITALLY SEALED AND SIGNED. | | | | PLEASE SUBMIT DIGITALLY SEALED AND SIGNED PLANS | | FOLLOWING PROJECTDOX INSTRUCTIONS | | | | MICHAEL PETERSON | | ELECTRICAL PLANS EXAMINER | | [email protected] | | 561-805-6746 | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-10-31 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2022-10-31 |
Time |
08:14 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2022-10-31 |
Time |
08:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-08-02 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2022-08-02 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2022-08-02 |
Time |
10:23 |
Sent To |
|
|
Notes |
2022-08-02 10:27:52 | 8/2/2022 | | FAIL | | | | PLEASE PROVIDE A SURVEY WHERE THE TWO AFG POLES ARE | | GOING TO BE LOCATED IN ADDITION PLEASE LABEL THE | | SETBACKS OF THE POLES FROM THE PROPERTY LINE. | | | | | | | | ALEXIS SANGELEER | | ASSOCIATE PLANNER | | [email protected] |
|
|