Plan Review Details - Permit 22070991
Plan Review Stops For Permit 22070991
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-10-03 Cont ID  
Sent By rrossano Date 2022-10-03 Time   Rev Time 0.00
Received By rrossano Date 2022-10-03 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-09-22 Cont ID  
Sent By rrossano Date 2022-09-22 Time   Rev Time  
Received By rrossano Date 2022-09-22 Time   Sent To I
Notes
2022-09-22 14:25:30PASSED WITH PROVISOS:
  
 CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF PROPOSED
 DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER METERS,
 SANITARY CLEANOUTS, STORM INLETS ETC. IN VICINITY OF
 PROPOSED DRIVEWAY. DO NOT CONSTRUCT DRIVEWAY ON TOP OF
 WATER METERS, SANITARY CLEANOUTS, STORMWATER INLETS
 ETC.
  
 MAXIMUM DRIVEWAY WIDTH FOR A SINGLE DRIVEWAY IS 20 FT.
 PLUS A 3 FT. FLARE ON EACH SIDE.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-10-03 Cont ID  
Sent By asangele Date 2022-10-03 Time 10:04 Rev Time 0.00
Received By asangele Date 2022-10-03 Time 10:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-24 Cont ID  
Sent By shill Date 2022-09-24 Time 07:33 Rev Time 0.00
Received By shill Date 2022-09-22 Time 09:44 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-10-03 Cont ID  
Sent By asangele Date 2022-10-03 Time 10:04 Rev Time 0.00
Received By asangele Date 2022-10-03 Time 10:04 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-09-22 Cont ID  
Sent By asangele Date 2022-09-22 Time 11:31 Rev Time 0.00
Received By asangele Date 2022-09-22 Time 11:31 Sent To  
Notes
2022-09-22 11:33:219/22/2022
 FAILED
  
  
 PLEASE LABEL DRIVEWAYS WIDTH ON SURVEY
  
 DRIVEWAY WIDTH CANNOT EXCEED 20FT
 MIN. OF A 3FT BUFFER FROM PROPERTY LINE WHERE DRIVEWAY
 CAN BE LOCATED
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]