Plan Review Stops For Permit 22070080 |
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
2 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-08-08 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-08-08 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
F |
Date |
2022-07-21 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-07-21 |
Time |
10:22 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-07-21 |
Time |
10:19 |
Sent To |
|
|
Notes |
2022-07-21 10:24:52 | PETER E VALENTI | | BUILDING PLANS EXAMINER II | | [email protected] | | 561 805 6673 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | ASBESTOS REVIEW DENIED: | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-08-08 |
Time |
09:41 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-08-08 |
Time |
09:41 |
Sent To |
|
|
Notes |
2022-08-08 09:42:59 | PETER E VALENTI | | BUILDING PLANS EXAMINER II | | [email protected] | | 561 805 6673 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | | THE DESIGNER OF RECORD'S APPROVED INSTRUCTIONS ON PLAN | | INCLUDING THE UL DETAIL(UL U516), AS SHOWN ON PLAN, FOR | | FIRE RATED SHAFT MUST BE FOLLOWED. | | NOTE: MECHANICAL SUB-DUCTS MUST BE APPROVED BY | | MECHANICAL REVIEW. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2022-07-21 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-07-21 |
Time |
10:55 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-07-21 |
Time |
10:19 |
Sent To |
|
|
Notes |
2022-07-21 11:08:59 | PETER E VALENTI | | BUILDING PLANS EXAMINER II | | [email protected] | | 561 805 6673 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | | THE DESIGNER OF RECORD'S APPROVED INSTRUCTIONS ON PLAN | | INCLUDING THE UL DETAIL(UL U516), AS SHOWN ON PLAN, FOR | | FIRE RATED SHAFT MUST BE FOLLOWED. | | NOTE: MECHANICAL SUB-DUCTS MUST BE APPROVED BY | | MECHANICAL REVIEW. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
N |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-07-26 |
Time |
10:51 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-07-26 |
Time |
10:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-08-01 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-08-01 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-08-01 09:42:39 | FIRE PROVISO COMMENT: | | ENSURE THE REQUIRED FIRE RATING OF THE SHAFT IS | | MAINTAINED. NFPA 101, 8.6 | | C. WALKER | | 561-804-4762 | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2022-07-19 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-07-19 |
Time |
|
Rev Time |
|
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-07-19 12:18:58 | FIRE PROVISO COMMENT: | | ENSURE THE REQUIRED FIRE RATING OF THE SHAFT IS | | MAINTAINED. NFPA 101, 8.6C. WALKER | | 561-804-4762 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-08-08 |
Time |
13:32 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-07-29 |
Time |
07:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-07-26 |
Time |
10:51 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-07-18 |
Time |
06:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-08-08 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-08-08 |
Time |
13:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-07-26 |
Time |
06:21 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-07-26 |
Time |
06:21 |
Sent To |
|
|
Notes |
2022-07-26 11:07:11 | ON THE DRAWING SUBMITTED THE DETAIL SECTION 1/1 IS | | SHOWING THAT THE SUBDUCT, THE BATH EXHAUST FROM THE | | FLOOR BELOW, IS TO BE CLOSED WITH THE UL DESIGN. THIS | | SUBDUCT IS NOT TO BE CAPPED IN ANY WAY. REVISE THE | | DRAWING TO SHOW THE SUBDUCT TO BE OPEN. | | | | FMC 607.5.5 SHAFT ENCLOSURES. SHAFT ENCLOSURES THAT ARE | | PERMITTED TO BE PENETRATED BY DUCTS AND AIR TRANSFER | | OPENINGS SHALL BE PROTECTED WITH APPROVED FIRE AND | | SMOKE DAMPERS INSTALLED IN ACCORDANCE WITH THEIR | | LISTING. | | EXCEPTIONS: | | 1. FIRE DAMPERS ARE NOT REQUIRED AT PENETRATIONS OF | | SHAFTS WHERE ANY OF THE FOLLOWING APPLY: | | 1.1. STEEL EXHAUST SUBDUCTS EXTEND NOT LESS THAN 22 | | INCHES (559 MM) VERTICALLY IN EXHAUST SHAFTS PROVIDED | | THAT THERE IS A CONTINUOUS AIRFLOW UPWARD TO THE | | OUTDOORS. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-08-08 |
Time |
09:53 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-08-08 |
Time |
09:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-07-21 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-07-21 |
Time |
10:20 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-07-21 |
Time |
10:19 |
Sent To |
|
|
Notes |
|
|