Plan Review Stops For Permit 22061582 |
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
7 |
Status |
P |
Date |
2023-07-05 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-07-05 |
Time |
08:03 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-07-05 |
Time |
08:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
6 |
Status |
F |
Date |
2023-06-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-06-29 |
Time |
18:28 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-06-29 |
Time |
18:28 |
Sent To |
|
|
Notes |
2023-06-29 18:29:15 | CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT | | 1-CONTRACTOR TO PROVIDE A SIGNED ACKNOWLEDGMENT LETTER, | | ON CONTRACTOR'S LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | NOTE: | | THE INFORMATION SHOULD INCLUDE THE ADDRESS, PERMIT | | NUMBER AND ASBESTOS IN THE SUBJECT LINE. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC | | ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION | | -RENOVATION.HTML | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
5 |
Status |
F |
Date |
2023-01-19 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-19 |
Time |
14:52 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-19 |
Time |
14:52 |
Sent To |
|
|
Notes |
2023-01-19 14:56:01 | ORIGINAL COMMENT: | | | | CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT | | 1-CONTRACTOR TO PROVIDE A SIGNED ACKNOWLEDGMENT LETTER, | | ON CONTRACTOR'S LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | NOTE: | | THE INFORMATION SHOULD INCLUDE THE ADDRESS, PERMIT | | NUMBER AND ASBESTOS IN THE SUBJECT LINE. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC | | ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION | | -RENOVATION.HTML | | | | RESPONSE: | | ASBESTOS ACKNOWLEDGMENT LETTER HAS THE WRONG ADDRESS. | | NEED LETTER WITH CORRECT ADDRESS. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
4 |
Status |
F |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-10 |
Time |
17:31 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-10 |
Time |
17:31 |
Sent To |
|
|
Notes |
2023-01-10 17:32:05 | 01/10/23 MET WITH FLOYD SCARLETT TO GO OVER | | ACKNOWLEDGMENT LETTER CONTENT. JG. | | | | | | NOTE: CHANGE OF CONTRACTOR. NEED ASBESTOS LETTER FROM | | NEW CONTRACTOR. | | | | CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT | | 1-CONTRACTOR TO PROVIDE A SIGNED ACKNOWLEDGMENT LETTER, | | ON CONTRACTOR'S LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | NOTE: | | THE INFORMATION SHOULD INCLUDE THE ADDRESS, PERMIT | | NUMBER AND ASBESTOS IN THE SUBJECT LINE. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC | | ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION | | -RENOVATION.HTML | | | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
3 |
Status |
F |
Date |
2023-01-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-09 |
Time |
13:57 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-09 |
Time |
13:26 |
Sent To |
|
|
Notes |
2023-01-09 13:59:27 | NOTE: CHANGE OF CONTRACTOR. NEED ASBESTOS LETTER FROM | | NEW CONTRACTOR. | | | | CONTRACTOR'S ASBESTOS ACKNOWLEDGMENT | | 1-CONTRACTOR TO PROVIDE A SIGNED ACKNOWLEDGMENT LETTER, | | ON CONTRACTOR'S LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | NOTE: | | THE INFORMATION SHOULD INCLUDE THE ADDRESS, PERMIT | | NUMBER AND ASBESTOS IN THE SUBJECT LINE. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC | | ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION | | -RENOVATION.HTML | | | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
2 |
Status |
P |
Date |
2022-08-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-08-06 |
Time |
10:40 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-08-06 |
Time |
10:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
F |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-07-25 |
Time |
18:44 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-07-25 |
Time |
18:44 |
Sent To |
|
|
Notes |
2022-07-25 18:44:44 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2023-06-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-06-29 |
Time |
18:27 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-06-29 |
Time |
17:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2023-01-19 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-19 |
Time |
14:21 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-19 |
Time |
14:16 |
Sent To |
|
|
Notes |
2023-01-19 14:20:00 | RESIDENTIAL (R2) BUILDING REVIEW COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22061582 | | 2761 VILLAGE BLVD # 403 | | | | NOTE: | | LEVEL 2 ALTERATION. SEC. 603 FBC-EXISTING BUILDING. | | SEC. 801.3 FBC-EXISTING BUILDING. ALL NEW CONSTRUCTION | | ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES SHALL COMPLY | | WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE. | | | | | | 1- FLOYD SCARLET EMAILED ME PLANS. PLANS WERE NOT | | PREPARED BY LICENSED ARCHITECT. MR. SCARLETT WAS TOLD | | ON 01/10/23 THAT PLANS NEED TO BE SIGNED AND SEALED AS | | REQUIRED BY SEC. 481.229 F.S | | | | | | 01/10/23 MET WITH FLOYD SCARLETT TO GO OVER SCOPE. | | BASED ON ALL THE PROPOSED SCOPE OF WORK AND VALUE, IT | | WAS EXPLAINED TO MR. SCARLETT THAT THE PLANS NEED TO BE | | DONE BY ARCHITECT AND COMPLETE DETAILS AND | | SPECIFICATIONS WILL NEED TO BE PROVIDED. JG. | | SEC. 481.229 F.S. | | | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND | | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE | | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-10 |
Time |
17:27 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-10 |
Time |
17:27 |
Sent To |
|
|
Notes |
2023-01-10 17:31:28 | 01/10/23 MET WITH FLOYD SCARLETT TO GO OVER SCOPE. | | BASED ON ALL THE PROPOSED SCOPE OF WORK AND VALUE, IT | | WAS EXPLAINED TO MR. SCARLETT THAT THE PLANS NEED TO BE | | DONE BY ARCHITECT AND COMPLETE DETAILS AND | | SPECIFICATIONS WILL NEED TO BE PROVIDED. JG. | | | | | | RESIDENTIAL (R2) BUILDING REVIEW COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22061582 | | 2761 VILLAGE BLVD # 403 | | | | NOTE: | | LEVEL 2 ALTERATION. SEC. 603 FBC-EXISTING BUILDING. | | SEC. 801.3 FBC-EXISTING BUILDING. ALL NEW CONSTRUCTION | | ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES SHALL COMPLY | | WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE. | | | | 1- NEED TO SPECIFY BATHROOM TILE BACKBOARD. SEC. 2509 | | FBC-BUILDING. | | | | 2- PROVIDE THE NAME AND SIGNATURE OF THE PERSON | | RESPONSIBLE FOR THE DESIGN AS REQUIRED BY SEC. 107.2.1 | | CITY AMENDMENTS. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND | | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE | | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2023-01-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-09 |
Time |
13:46 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-09 |
Time |
13:30 |
Sent To |
|
|
Notes |
2023-01-09 13:47:05 | RESIDENTIAL (R2) BUILDING REVIEW COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22061582 | | 2761 VILLAGE BLVD # 403 | | | | NOTE: | | LEVEL 2 ALTERATION. SEC. 603 FBC-EXISTING BUILDING. | | SEC. 801.3 FBC-EXISTING BUILDING. ALL NEW CONSTRUCTION | | ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES SHALL COMPLY | | WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE. | | | | 1- NEED TO SPECIFY BATHROOM TILE BACKBOARD. SEC. 2509 | | FBC-BUILDING. | | | | 2- PROVIDE THE NAME AND SIGNATURE OF THE PERSON | | RESPONSIBLE FOR THE DESIGN AS REQUIRED BY SEC. 107.2.1 | | CITY AMENDMENTS. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND | | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE | | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2022-12-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-12-06 |
Time |
10:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-12-06 |
Time |
10:49 |
Sent To |
|
|
Notes |
2022-12-06 10:49:59 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | TEST REPORTS WERE NOT SUBMITTED. NOT CLEAR HOW ITEM #3 | | WAS ADDRESSED. | | | | 1. OK | | | | 2. FS471, ENGINEER DOES NOT HAVE A DIGITAL OR | | ELECTRONIC SIGNATURE - HE CAN SUBMIT ONE SIGNED AND | | SEALED PAPER ORIGINAL AFTER ALL REVIEWS HAVE PASSED. | | | | 3. FBC B 1207 (ALSO SEE PREVIOUS LIST FOR MORE COMPLETE | | CODE REFERENCES AND GUIDANCE). BASED ON THE FILES | | UPLOADED, NUCORE FLOORING IS PROPOSED OVER SHAW | | GROUNDWORKS UNDERLAYMENT. | | | | FLAME SPREAD FOR GROUNDWORKS - IS OK. | | | | THE STC/IIC FOR GROUNDWORKS WAS DONE WITH SMARTCORE PRO | | FLOORING. SINCE LVT HAS A STC/IIC VALUE, IT IS NOT | | CLEAR IF THE FLOORING PROPOSED COMPLIES WITH THE | | MINIMUM REQUIREMENTS OF STC/IIC. EITHER PROVIDE AN | | ENGINEERED ANALYSIS OF NUCORE VS. SMARTCORE, OR PROVIDE | | TEST REPORTS FOR STC/IIC FOR THIS ASSEMBLY, OR PROPOSE | | A DIFFERENT PRODUCT. | | | | YOU MAY EMAIL THE PROPOSED RESOLUTION PRIOR TO | | RESUBMITTING IF YOU WOULD LIKE. ALTHOUGH THIS REVIEW IS | | BEING DONE WITHIN A DAY OF RESUBMITTAL, THIS IS NOT | | TYPICAL. OUR TARGET IS 10-14 DAYS. | | | | | | | | FOR REFERENCE ONLY, THE FOLLOWING FILES WERE SUBMITTED | | FOR FLOORING: | | | | SHAW GROUNDWORKS UNDERLAYMENT FLAME SPREAD (FILE NAME | | INTERTEK FLAME SPREAD TEST REPORT) | | NUCORE FLOORING SPEC SHEET | | SMARTCORE PRO STC/IIC (FILE NAME SHAW INDUSTRIES VINYL | | PLANK TEST REPORT) | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-08-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-08-06 |
Time |
10:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-08-06 |
Time |
10:50 |
Sent To |
|
|
Notes |
2022-08-06 10:57:37 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. OK | | | | 2. FS471, ENGINEER DOES NOT HAVE A DIGITAL OR | | ELECTRONIC SIGNATURE - HE CAN SUBMIT ONE SIGNED AND | | SEALED PAPER ORIGINAL AFTER ALL REVIEWS HAVE PASSED. | | | | 3. FBC B 1207 (ALSO SEE PREVIOUS LIST FOR MORE COMPLETE | | CODE REFERENCES AND GUIDANCE). BASED ON THE FILES | | UPLOADED, NUCORE FLOORING IS PROPOSED OVER SHAW | | GROUNDWORKS UNDERLAYMENT. | | | | FLAME SPREAD FOR GROUNDWORKS - IS OK. | | | | THE STC/IIC FOR GROUNDWORKS WAS DONE WITH SMARTCORE PRO | | FLOORING. SINCE LVT HAS A STC/IIC VALUE, IT IS NOT | | CLEAR IF THE FLOORING PROPOSED COMPLIES WITH THE | | MINIMUM REQUIREMENTS OF STC/IIC. EITHER PROVIDE AN | | ENGINEERED ANALYSIS OF NUCORE VS. SMARTCORE, OR PROVIDE | | TEST REPORTS FOR STC/IIC FOR THIS ASSEMBLY, OR PROPOSE | | A DIFFERENT PRODUCT. | | | | YOU MAY EMAIL THE PROPOSED RESOLUTION PRIOR TO | | RESUBMITTING IF YOU WOULD LIKE. ALTHOUGH THIS REVIEW IS | | BEING DONE WITHIN A DAY OF RESUBMITTAL, THIS IS NOT | | TYPICAL. OUR TARGET IS 10-14 DAYS. | | | | | | | | FOR REFERENCE ONLY, THE FOLLOWING FILES WERE SUBMITTED | | FOR FLOORING: | | | | SHAW GROUNDWORKS UNDERLAYMENT FLAME SPREAD (FILE NAME | | INTERTEK FLAME SPREAD TEST REPORT) | | NUCORE FLOORING SPEC SHEET | | SMARTCORE PRO STC/IIC (FILE NAME SHAW INDUSTRIES VINYL | | PLANK TEST REPORT) | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-07-25 |
Time |
18:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-07-25 |
Time |
18:45 |
Sent To |
|
|
Notes |
2022-07-25 18:47:21 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. FBC B 2509, REVISE PLAN TO SPECIFY TILE BACKERBOARD. | | | | 2. FS471, PLAN WAS PREPARED BY DAVID MONK, PE. UPLOAD A | | DIGITALLY SIGNED DOCUMENT. IF THE ENGINEER DOES NOT | | HAVE A DIGITAL SIGNATURE, EMAIL ME TO DISCUSS. NOTE | | THAT THE SEAL USED HAS NOT BEEN ACCEPTED BY FBPE FOR | | OVER TEN YEARS. | | | | 3. NEW FLOORING IS PROPOSED. REVISE THE PLAN TO CLARIFY | | FLOORING TYPE - FOR INSTANCE TILE, LVT, WOOD, ETC. IF | | THE FLOORING ALONE DOES NOT HAVE TEST REPORTS TO SHOW | | COMPLIANCE WITH STC AND IIC REQUIREMENTS, UNDERLAYMENT | | IS REQUIRED. IF UNDERLAYMENT IS NOT REQUIRED, PROVIDE | | STC AND IIC TEST REPORTS FOR THE PROPOSED FLOORING. SEE | | BELOW FOR ADDITIONAL INFO. | | | | PROVIDE THE FOLLOWING TEST REPORTS FOR THE PROPOSED | | UNDERLAYMENT STC, IIC, FLAME SPREAD: | | | | PLEASE NOTE THAT TEST REPORTS ARE REQUIRED - | | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO | | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST | | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE | | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) | | | | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING | | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR | | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS | | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR | | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. | | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM | | CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN | | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC | | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN | | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN | | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH | | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED | | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. | | | | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE | | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL | | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID | | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED | | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE | | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 | | OR UL 723. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
N |
Date |
2023-06-02 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2023-06-02 |
Time |
12:53 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2023-06-02 |
Time |
12:48 |
Sent To |
|
|
Notes |
2023-06-02 12:53:50 | ALL ELECTRIC IS SHOWN AS EXISTING JLEAHY |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
N |
Date |
2022-08-23 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-08-23 |
Time |
13:05 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-08-23 |
Time |
13:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
N |
Date |
2022-07-21 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-07-21 |
Time |
13:53 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-07-21 |
Time |
13:50 |
Sent To |
|
|
Notes |
2022-07-21 13:54:18 | NO ELECTRICAL WORK SHOWN OR APPROVED JLEAHY |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2023-05-25 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2023-05-25 |
Time |
15:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
P |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2023-01-10 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2022-12-01 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-12-01 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-08-08 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2022-06-30 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-06-30 |
Time |
|
Rev Time |
|
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-06-30 11:12:48 | FIRE REVIEW COMMENTS: | | PROVIDE DETAILS ON THE TYPE OF FLOORING TO BE INSTALLED | | TO INCLUDE THE MANUFACTURES INFORMATION FOR THE | | MATERIALS FIRE PERFORMANCE TO INCLUDE THE CRITICAL | | RADIANT FLUX. NFPA 101, 10.2.7 | | C. WALKER | | 561-804-4762 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2023-07-05 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-07-05 |
Time |
08:03 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-07-03 |
Time |
10:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2023-06-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-06-29 |
Time |
18:32 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-05-24 |
Time |
12:25 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2023-01-19 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-19 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-19 |
Time |
14:16 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-10 |
Time |
17:34 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-09 |
Time |
14:22 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-12-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-12-06 |
Time |
10:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-11-29 |
Time |
09:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-08-23 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-08-23 |
Time |
13:05 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-08-06 |
Time |
07:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-07-25 |
Time |
18:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-30 |
Time |
05:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2023-05-25 |
Time |
07:10 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2023-05-25 |
Time |
07:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2023-01-10 |
Time |
07:09 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2023-05-25 |
Time |
07:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2022-12-05 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-12-05 |
Time |
05:57 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2023-05-25 |
Time |
07:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-08-09 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-08-09 |
Time |
07:10 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-08-09 |
Time |
07:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-07-05 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-07-05 |
Time |
11:52 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-07-05 |
Time |
11:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
7 |
Status |
P |
Date |
2023-06-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-06-29 |
Time |
18:28 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-06-29 |
Time |
18:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
F |
Date |
2023-01-19 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-19 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-19 |
Time |
14:36 |
Sent To |
|
|
Notes |
2023-01-19 14:37:33 | 01/10/23 MET WITH FLOYD SCARLETT TO GO OVER SCOPE. | | BASED ON ALL THE PROPOSED SCOPE OF WORK AND VALUE, IT | | WAS EXPLAINED TO MR. SCARLETT THAT THE PLANS NEED TO BE | | DONE BY ARCHITECT AND COMPLETE DETAILS AND | | SPECIFICATIONS WILL NEED TO BE PROVIDED. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
F |
Date |
2023-01-10 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-10 |
Time |
17:33 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-10 |
Time |
17:33 |
Sent To |
|
|
Notes |
2023-01-10 17:33:57 | 01/10/23 MET WITH FLOYD SCARLETT TO GO OVER SCOPE. | | BASED ON ALL THE PROPOSED SCOPE OF WORK AND VALUE, IT | | WAS EXPLAINED TO MR. SCARLETT THAT THE PLANS NEED TO BE | | DONE BY ARCHITECT AND COMPLETE DETAILS AND | | SPECIFICATIONS WILL NEED TO BE PROVIDED. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
N |
Date |
2023-01-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-01-09 |
Time |
14:00 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-01-09 |
Time |
14:00 |
Sent To |
|
|
Notes |
2023-01-09 14:00:47 | NO ARCHITECT OR ENGINEER. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2022-12-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-12-06 |
Time |
10:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-12-06 |
Time |
10:50 |
Sent To |
|
|
Notes |
2022-12-06 10:50:21 | SEE BUILDING |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-08-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-08-06 |
Time |
10:39 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-08-06 |
Time |
10:39 |
Sent To |
|
|
Notes |
2022-08-06 10:39:33 | SEE BUILDING | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-07-25 |
Time |
18:47 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-07-25 |
Time |
18:47 |
Sent To |
|
|
Notes |
2022-07-25 18:48:09 | SEE BUILDING | | UPLOAD A DIGITALLY SIGNED DOCUMENT | | |
|
|