Plan Review Stops For Permit 22061463 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2023-05-09 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2023-05-09 |
Time |
16:00 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2023-05-09 |
Time |
15:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2023-03-31 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2023-03-31 |
Time |
07:48 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2023-03-30 |
Time |
16:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-08-23 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-08-23 |
Time |
13:00 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-08-23 |
Time |
11:26 |
Sent To |
|
|
Notes |
2022-08-23 13:02:37 | PLAN REVIEW BUILDING | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | PLANS EXAMINER II PX3169/SFP306 | | BU1635 BN4338 | | ASFPM CFM US-21-11935 | | CITY OF WEST PALM BEACH | | (561) 805-6726 | | [email protected] | | | | CODES IN EFFECT: | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | CHAPTER 1 ADMINISTRATION | | NFPA 70 2017 EDITION NEC 2017 | | | | 1ST REVIEW | | | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | 1.PROVIDE THE FL PRODUCT APPROVALS OR MIAMI-DADE NOA | | FOR THE PROPOSED WINDOWS AND EXT. DOORS TO BE | | INSTALLED. | | FL PRODUCT APPROVALS SHALL INCLUDE THE COVER SHEETS, | | EVALUATION REPORT AND INSTALLATIONS INSTRUCTIONS. | | NOTE: NOA?S DO NOT HAVE COVER SHEETS. | | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2023-03-31 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2023-03-31 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2023-03-30 |
Time |
20:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-08-13 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-08-13 |
Time |
11:38 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-08-13 |
Time |
08:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2023-03-29 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2023-03-29 |
Time |
08:45 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2023-03-29 |
Time |
07:47 |
Sent To |
|
|
Notes |
2023-03-29 08:46:41 | SEPARATE PRIMARY PERMIT REQUIRED FOR LP TANK. | | GAS SUB-PERMIT UNDER MASTER REQUIRED FOR GAS PIPING. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-08-08 |
Time |
08:04 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-08-08 |
Time |
07:25 |
Sent To |
|
|
Notes |
2022-08-08 08:05:19 | GAS SUB-PERMIT REQUIRED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2023-05-15 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-05-15 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-05-15 |
Time |
11:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-04-25 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-04-25 |
Time |
10:41 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-04-25 |
Time |
10:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2023-04-14 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-04-14 |
Time |
14:40 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-04-14 |
Time |
14:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-08-23 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2022-08-23 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2022-08-05 |
Time |
07:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2023-03-29 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2023-03-29 |
Time |
10:18 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2023-03-29 |
Time |
10:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2022-08-09 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-08-09 |
Time |
10:43 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-08-09 |
Time |
10:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2023-03-29 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2023-03-29 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2023-03-29 |
Time |
07:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-08-08 |
Time |
08:05 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-08-08 |
Time |
07:25 |
Sent To |
|
|
Notes |
2022-08-08 08:06:06 | PLUMBING SUB-PERMIT REQUIRED. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2023-05-09 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2023-05-09 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2023-05-09 |
Time |
15:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2023-05-09 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2023-05-09 |
Time |
16:00 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2023-05-09 |
Time |
15:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2023-03-31 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2023-03-31 |
Time |
07:48 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2023-03-30 |
Time |
16:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-08-08 |
Time |
08:04 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-08-08 |
Time |
07:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2023-05-15 |
|
|
Cont ID |
|
Sent By |
vbroglia |
Date |
2023-05-15 |
Time |
11:24 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-05-15 |
Time |
11:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-04-25 |
|
|
Cont ID |
|
Sent By |
asangele |
Date |
2023-04-25 |
Time |
10:39 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-04-25 |
Time |
10:39 |
Sent To |
|
|
Notes |
2023-04-25 10:40:54 | FAILED | | 4/25/2023 | | | | | | YOU ARE EXPANDING THE EXISTING HOUSES FOOTPRINT PLEASE | | LABEL THE NEW SETBACKS OF THE HOUSE ON THE PLANS. | | | | | | ALEXIS SANGELEER | | PLANNER | | ASANGELEER2WPB.ORG |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2023-04-14 |
|
|
Cont ID |
|
Sent By |
ASangele |
Date |
2023-04-14 |
Time |
14:38 |
Rev Time |
0.00 |
Received By |
asangele |
Date |
2023-04-14 |
Time |
14:38 |
Sent To |
|
|
Notes |
2023-04-14 14:40:19 | 4/14/2023 | | FAILED | | | | PLEASE PROVIDE A PROPERTY SURVEY | | | | REPEAT COMMENT | | | | A LANDSCAPE PERMIT IS REQUIRED | | | | THE VALUE OF THE CONSTRUCTION ($168,000) EXCEEDS 50% OF | | THE STRUCTURE'S INPROVEMENT VALUE ($163,172) ACCORDING | | TO THE P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, | | PURSUANT TO SECTION 94-441(B) OF THE ZONING AND LAND | | DEVELOPMENT REGULATIONS (ZLDR), THE LANDSCAPE ON THE | | SITE SHALL BE IN COMPLIANCE WITH ALL APPLICABLE | | REGULATIONS FOUND IN ARTICLE XIV OF THE ZLDR. SUBMIT A | | SEPARATE LANDSCAPE PERMIT WITH PLANS SHOWING MATERIAL | | EXISTING ON SITE OR ANY ADDITION OF TREES OR SHRUBS TO | | BRING THE SITE INTO CONFORMITY. | | | | | | | | ALEXIS SANGELEER | | PLANNER | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-08-12 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-08-12 |
Time |
15:59 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-08-12 |
Time |
15:59 |
Sent To |
|
|
Notes |
2022-08-12 16:01:24 | THE VALUE OF THE CONSTRUCTION ($168,000) EXCEEDS 50% OF | | THE STRUCTURE'S VALUE ($124,386) ACCORDING TO THE | | P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, PURSUANT | | TO SECTION 94-441(B) OF THE ZONING AND LAND DEVELOPMENT | | REGULATIONS (ZLDR), THE LANDSCAPE ON THE SITE SHALL BE | | IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS FOUND IN | | ARTICLE XIV OF THE ZLDR. IF THE SITE CONFORMS TO | | ARTICLE XIV, THEN TWO (2) COPIES OF A LANDSCAPE PLAN | | DEMONSTRATING COMPLIANCE SHALL BE INCLUDED WITH THE | | PERMIT RE-SUBMITTAL. IF THE SITE DOES NOT CONFORM TO | | ARTICLE XIV, THEN PRIOR TO THE ZONING APPROVAL OF THIS | | PERMIT A SEPARATE LANDSCAPE PERMIT AND IRRIGATION | | PERMIT SHALL BE SUBMITTED SHOWING MATERIAL TO BRING THE | | SITE INTO CONFORMITY. | | | | ALEXANDER FOWLKES | | [email protected] | | 5618221431 |
|
|