Plan Review Details - Permit 22061005
Plan Review Stops For Permit 22061005
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-06-21 Cont ID  
Sent By cpuell Date 2022-06-21 Time 12:46 Rev Time 0.00
Received By cpuell Date 2022-06-21 Time 12:46 Sent To  
Notes
2022-06-21 12:58:56ONCE BUILDING IS DEMOLISHED THE FOLLWOING ADDRESSES
 WILL BE RETIRED:
 414 11TH ST 1
 414 11TH ST 2
 414 11TH ST 3
 414 11TH ST 4
  
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-07-25 Cont ID  
Sent By shill Date 2022-07-25 Time 05:50 Rev Time 0.00
Received By shill Date 2022-07-25 Time 05:50 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-07-25 Cont ID  
Sent By shill Date 2022-07-25 Time 05:53 Rev Time 0.00
Received By shill Date 2022-07-25 Time 05:53 Sent To  
Notes
2022-07-25 05:54:06****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
  IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 IF THE FORM IS NOT AVAILABLE ONLINE, REQUEST FROM
 [email protected]
  
 2. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703. PLEASE NOTIFY US VIA EMAIL AFTER FINAL
 INSPECTION HAS PASSED). THE PERMIT HAS BEEN ISSUED BUT
 NOT INSPECTED.
  
 3. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS
 BEEN INSPECTED AND/OR TREATED FOR RODENTS.
  
 4. SUBMIT A LETTER INDICATING METHOD OF DUST CONTROL.
 IF ON SITE WATER WILL BE USED, A BACKFLOW PREVENTER IS
 REQUIRED.
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-07-18 Cont ID  
Sent By rrossano Date 2022-07-18 Time   Rev Time  
Received By rrossano Date 2022-07-18 Time   Sent To  
Notes
2022-07-18 12:43:40PROVIDE CLEARANCE FOR WATER AND SEWER FROM PUBLIC
 UTILITIES.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-07-19 Cont ID  
Sent By amhamilt Date 2022-07-19 Time 16:39 Rev Time 0.00
Received By amhamilt Date 2022-07-19 Time 16:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-07-26 Cont ID  
Sent By shill Date 2022-07-26 Time 10:06 Rev Time 0.00
Received By shill Date 2022-07-08 Time 11:01 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-07-25 Cont ID  
Sent By shill Date 2022-07-25 Time 05:54 Rev Time 0.00
Received By shill Date 2022-07-25 Time 05:54 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-07-25 Cont ID  
Sent By ckimmerl Date 2022-07-25 Time 13:46 Rev Time 0.00
Received By ckimmerl Date 2022-07-25 Time 13:46 Sent To  
Notes
2022-07-25 13:46:54PER SEC. 94-107. - DEMOLITION REQUIREMENTS. (B.)(2.) -
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS.
  
 1. PLEASE OBTAIN OR PROVIDE BUILDING PERMIT RELATED TO
 THE VERTICAL CONSTRUCTION OF THE NEW STRUCTURE ON SITE.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822-1426 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved