Plan Review Stops For Permit 22060621 |
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-25 |
Time |
12:34 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-25 |
Time |
12:34 |
Sent To |
|
|
Notes |
2022-07-25 12:34:42 | PLAN REVIEW IS BEING STOPPED SO NO MORE TIME GOES INTO | | THE REVIEW OF A CANCELLED PROJECT. |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
F |
Date |
2022-07-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-19 |
Time |
10:01 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-19 |
Time |
09:54 |
Sent To |
|
|
Notes |
2022-07-19 10:03:07 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-09-23 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-09-23 |
Time |
12:43 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-09-23 |
Time |
12:42 |
Sent To |
|
|
Notes |
2022-09-23 12:43:27 | | | | 2022-09-23 12:13:36 | PERMIT REACTIVATED. PLANS TO CANCEL PERMIT CHANGED. NEW | | WORK DETAILED. FULL REVIEWS REQUIRED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-25 |
Time |
12:35 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-25 |
Time |
12:35 |
Sent To |
|
|
Notes |
2022-07-25 12:35:48 | PLAN REVIEW IS BEING STOPPED SO NO MORE TIME GOES INTO | | THE REVIEW OF A CANCELLED PROJECT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-07-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-19 |
Time |
09:58 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-19 |
Time |
09:54 |
Sent To |
|
|
Notes |
2022-07-19 09:58:55 | RESTAURANT REMODEL | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) PLEASE SHOW THE BAR ACCESSIBLE SEATING COUNTER | | HEIGHT - FBC A 902.3HEIGHT. | | THE TOPS OF DINING SURFACES AND WORK SURFACES SHALL BE | | 28 INCHES (710 MM) MINIMUM AND 34 INCHES (865 MM) | | MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. | | | | 2) PLEASE SHOW KNEE AND TOE CLEARANCE AT THE ACCESSIBLE | | BAR SEATING - FBC A 305.4 KNEE AND TOE CLEARANCE. | | UNLESS OTHERWISE SPECIFIED, CLEAR FLOOR OR GROUND SPACE | | SHALL BE PERMITTED TO INCLUDE KNEE AND TOE CLEARANCE | | COMPLYING WITH 306. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-09-23 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-09-23 |
Time |
12:32 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-09-23 |
Time |
12:30 |
Sent To |
|
|
Notes |
2022-09-23 12:13:23 | PERMIT REACTIVATED. PLANS TO CANCEL PERMIT CHANGED. NEW | | WORK DETAILED. FULL REVIEWS REQUIRED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-07-07 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-07-07 |
Time |
08:30 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-07-07 |
Time |
08:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-07-25 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-07-25 |
Time |
11:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2022-06-21 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-06-21 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-06-17 |
Time |
11:31 |
Sent To |
|
|
Notes |
2022-06-17 12:12:10 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE ARE INDICATIONS OF PROPOSED BOOTH SEATING | | EXTENSION AND PIZZA AREA COUNTERTOPS BY THE EXISTING | | EXIT DOOR. | | | | | | THERE IS NO DIMENSION SHOWING THE DISTANCE BETWEEN THE | | CHAIRS AND THE COUNTERTOP AT THE ROUND TABLE AND THE | | DIAGONAL AREA AT THE CORNER CHAIR AND CORNER OF THE | | COUNTERTOP(BOTH SIDES) THAT MEETS THE MINIMUM EXIT | | WIDTH REQUIRMENTS PER NFPA 101. | | | | CH 12 NEW ASSEMBLY OCCUPANCIES | | | | 12.2.5.4.2* ACCESS AND EGRESS ROUTES SHALL BE | | MAINTAINED SO THAT ANY | | INDIVIDUAL IS ABLE TO MOVE WITHOUT UNDUE HINDRANCE, ON | | PERSONAL INITIA TIVE AND AT ANY TIME, FROM AN OCCUPIED | | POSITION TO THE EXIT | | | | 12.2.5.6.3* MINIMUM AISLE WIDTH. THE MINIMUM CLEAR | | WIDTH OF | | AISLES SHALL BE SUFFICIENT TO PROVIDE EGRESS CAPACITY | | IN ACCORDANCE WITH | | 12.2.3.1 BUT SHALL BE NOT LESS THAN THE FOLLOWING: | | | | (5) 36 IN. (915 MM) FOR LEVEL OR RAMPED AISLES HAVING | | SEATING ON ONLY | | ONE SIDE | | | | PLEASE REVIEW AND PROVIDE THE ACTUAL DIMENSIONS THAT | | INDICATE THE MINIMUM REQUIREMENT. | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-09-23 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-09-23 |
Time |
16:00 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-09-23 |
Time |
11:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-25 |
Time |
12:31 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-23 |
Time |
06:57 |
Sent To |
|
|
Notes |
2022-07-25 12:33:54 | THIS JOB IS BEING CANCELLED AND THE CONTRACTOR WILL BE | | SENDING CANCELLATION LETTER UPON RETURN FROM CURRENT | | TRAVEL. | | IN THE MEAN TIME PLAN REVIEW IS BEING STOPPED SO NO | | MORE TIME GOES INTO THE REVIEW OF A CANCELLED PROJECT. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-07-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-19 |
Time |
10:03 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-06-16 |
Time |
15:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2022-09-23 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-09-23 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-09-23 |
Time |
14:36 |
Sent To |
|
|
Notes |
2022-09-23 14:38:17 | APPROVED WITH PRIVISO: | | NEW MECHANICAL DRAWING TO BE SUBMITTED SHOWING THE MAIN | | TRUNK LINE, THE NEW DUCTWORK AND SIZES FOR DUCTWORK AND | | THE CFM'S AT EACH GRILLE. ME | | | | | 2022-09-23 12:13:12 | PERMIT REACTIVATED. PLANS TO CANCEL PERMIT CHANGED. NEW | | WORK DETAILED. FULL REVIEWS REQUIRED. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-25 |
Time |
12:34 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-07-25 |
Time |
13:32 |
Sent To |
|
|
Notes |
2022-07-25 12:35:00 | PLAN REVIEW IS BEING STOPPED SO NO MORE TIME GOES INTO | | THE REVIEW OF A CANCELLED PROJECT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-06-27 |
Time |
09:37 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-06-27 |
Time |
09:37 |
Sent To |
|
|
Notes |
2022-06-27 09:40:06 | SHEET M-100 INDICATES A NEW 5-TON UNIT. PLEASE EXPALIN | | IS THIS A NEW ADDED UNIT OR A NEW REPLACEMENT OF AN | | EXISTING UNIT? | | IF THIS IS NOT A LIKE FOR LIKE CHANGE OUT PROVIDE | | MECHANICAL EQUIPMENT SIZING CALCULATIONS. IS THIS UNIT | | MOUNTED ABOVE THE CEILING? IS THIS AN RTU? | | PLEASE ROVIDE A COMPLETE SCOPE OF WORK FOR THE | | MECHANICAL DESIGN. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-07-25 |
Time |
06:15 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-07-25 |
Time |
06:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-06-24 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-24 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-24 |
Time |
14:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2022-09-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-09-26 |
Time |
13:05 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-09-26 |
Time |
13:05 |
Sent To |
|
|
Notes |
2022-09-26 13:07:34 | SIGNED AND SEALED PAPER PLANS SHEETS A-201 AND A301 BY | | THE ARCHITECT WERE SUBMITTED. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2022-09-23 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-09-23 |
Time |
12:48 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-09-23 |
Time |
12:48 |
Sent To |
|
|
Notes |
2022-09-23 12:49:06 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) DRAWINGS A-201 AND A-301 DO NOT SHOW AS DIGITALLY | | SIGNED IN ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-25 |
Time |
12:35 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-25 |
Time |
12:35 |
Sent To |
|
|
Notes |
2022-07-25 12:35:30 | PLAN REVIEW IS BEING STOPPED SO NO MORE TIME GOES INTO | | THE REVIEW OF A CANCELLED PROJECT. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-07-07 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-07-07 |
Time |
08:35 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-07-07 |
Time |
08:35 |
Sent To |
|
|
Notes |
2022-07-07 08:35:51 | ALL PLANS PASSED SIGNATURE REVIEW. MP | 2022-06-27 09:41:30 | MECHANICAL DIGITAL SIGNATURES APPROVED ME |
|
|