Plan Review Stops For Permit 22060317 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-06-17 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2022-06-17 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-08-31 |
Time |
06:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-08-31 |
Time |
06:31 |
Sent To |
|
|
Notes |
2022-08-31 06:31:57 | AUDIT COMPLETE. PRODUCT APPROVALS WERE APPROVED WITH | | THE MASTER PERMIT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-08-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-08-15 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-08-15 |
Time |
12:55 |
Sent To |
|
|
Notes |
2022-08-15 13:36:51 | BUILDING REVIEW AUDIT (2). | | STATUS: FAILED | | | | 1) [SPECIFY ON THE PLANS OR PROVIDE A LETTER STATING | | WHICH ITEMS YOU WOULD LIKE TO DEFER OR SUBMIT THE | | REQUIRED DOCUMENTS.] CITY AMENDMENTS FBC 107.3.4 SUBMIT | | PRODUCT APPROVALS FOR THE EXTERIOR DOORS, WINDOWS AND | | ROOFING MATERIALS THAT HAVE BEEN REVIEWED AND APPROVED | | IN WRITING BY THE DESIGNER OF RECORD. IF YOU WOULD LIKE | | TO SUBMIT THESE ITEMS AT A LATER DATE THEN YOU WILL | | NEED TO COMPLY WITH THE FOLLOWING: FBC AMENDMENTS | | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS | | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE | | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE | | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO | | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. | | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR | | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST | | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS | | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR | | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE | | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. | | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED | | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | APPROVED BY THE BUILDING OFFICIAL. | | | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | INSTALLATION INSTRUCTIONS FOR THE KEMPER BALCONY | | WATERPROOFING. FBC 107.2.1 IF DEFERRED COMPLY WITH FBC | | AMENDMENTS 107.3.4.1. | | | | 3) SUBMIT TRUSS DRAWINGS AND LAYOUT PLAN. THE TRUSS | | LAYOUT PLAN NEEDS TO BE REVIEWED BY THE DESIGNER OF | | RECORD FOR COMPLIANCE WITH THEIR DESIGN. FBC 107.2.1 IF | | DEFERRED COMPLY WITH FBC AMENDMENTS 107.3.4.1. | | | | 4) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH | | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-07-26 |
Time |
09:14 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-07-26 |
Time |
09:14 |
Sent To |
|
|
Notes |
2022-07-26 06:55:04 | BUILDING REVIEW AUDIT. | | STATUS: FAILED | | | | 1) SEVERAL OF THE STAIR NOTES ON SHEET A5.1 ARE | | INCORRECT. | | -FBC 311.7.8.1 REQUIRES THE HAND RAIL HEIGHT TO BE NOT | | LESS THAN 34 INCHES NOR MORE THAN 38 INCHES. | | - FBC-R311.7.5.3 REQUIRES NOSING PROJECTIONS TO BE NOT | | LESS THAN 3/4 INCH NOR MORE THAN 1-1/4 INCHES. | | - THE FOOT SYMBOL (') IS INCORRECTLY USED IN SEVERAL | | PLACES WHERE THE INCH SYMBOL (") SHOULD BE USED. | | - NOTE: THE FLORIDA ACCESSIBILITY CODE DOES NOT APPLY | | TO THE STAIR HANDRAILS IN SINGLE FAMILY RESIDENCES. | | | | 2) CITY AMENDMENTS FBC 107.3.4 SUBMIT PRODUCT APPROVALS | | FOR THE EXTERIOR DOORS, WINDOWS AND ROOFING MATERIALS | | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. IF YOU WOULD LIKE TO SUBMIT THESE | | ITEMS AT A LATER DATE THEN YOU WILL NEED TO COMPLY WITH | | THE FOLLOWING: FBC AMENDMENTS 107.3.4.1 DEFERRED | | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED | | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN | | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL | | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING | | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS | | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE | | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL | | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A | | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | BUILDING OFFICIAL. | | | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | INSTALLATION INSTRUCTIONS FOR THE ISOKERN FIREPLACE, | | THE KEMPER BALCONY WATERPROOFING AND THE ELEVATOR. FBC | | 107.2.1 IF DEFERRED COMPLY WITH FBC AMENDMENTS | | 107.3.4.1. | | | | 4) SUBMIT TRUSS DRAWINGS AND LAYOUT PLAN. THE TRUSS | | LAYOUT PLAN NEEDS TO BE REVIEWED BY THE DESIGNER OF | | RECORD FOR COMPLIANCE WITH THEIR DESIGN. FBC 107.2.1 IF | | DEFERRED COMPLY WITH FBC AMENDMENTS 107.3.4.1. | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-09-19 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-09-19 |
Time |
10:43 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-09-19 |
Time |
10:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-07-25 |
Time |
09:21 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-07-25 |
Time |
09:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2022-09-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-09-07 |
Time |
09:35 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-09-07 |
Time |
09:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2022-08-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-08-15 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-08-15 |
Time |
12:49 |
Sent To |
|
|
Notes |
2022-08-15 14:34:40 | 2ND REVIEW FBC-2020 RES. GAS | | PERMIT- 22060317 | | 8/15/22 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION | | 2020 | | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION | | 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) P-4: THE PLAN AND RISER SHOW PE PIPE RUN UNDER THE | | MAIN BUILDING TO THE RANGE, AND UNDER THE POOL CABANA | | BUILDING TO THE BBQ GRILL WHICH IS NOT PERMITTED- SEC. | | G2415.17.1 (404.17.1) FBC RES. THE ENGINEER MUST | | PROVIDE AN ALTERNATIVE SUCH AS CSST PIPING. IT APPEARS | | PE IS ALSO RUNNING UNDER THE LOGGIA SLAB TO THE | | FIREPLACE WHICH IS PERMITTED, HOWEVER PLEASE INDICATE | | THE BURIAL DEPTH OF THE PIPE TO SHOW COMPLIANCE WITH | | SECS. G2415.17.1 & G2415.12.1 FBC RES. | | | | 2) P-4: PLEASE SUBMIT MANUFACTURER'S SPECS FOR THE BBQ | | GRILL- SEC. THE GRILL SHALL BE INSTALLED IN ACCORDANCE | | WITH THE MANUFACTURER'S GUIDELINES WHICH MAY REQUIRE A | | HOOD EXHAUST SYSTEM- G2447.1 FBC RES. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-07-26 |
Time |
08:10 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-07-26 |
Time |
07:45 |
Sent To |
|
|
Notes |
2022-07-26 08:11:33 | 1ST REVIEW FBC-2020 RES. GAS | | PERMIT- 22060317 | | 7/26/22 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION | | 2020 | | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION | | 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) SHEET P-4: THE 3/4-INCH SCHEDULE 40 METALLIC SUPPLY | | PIPE FROM THE METER AND THE 3/4-INCH PE MAIN | | UNDERGROUND PIPE ARE UNDERSIZED BASED ON THE TABLES | | SHOWN ON THE PLAN- TABLES 402.4(5) & 402.4(22), AND | | SEC. G2413.4.1 (402.4.1) FBC RES. THE 3/4-INCH METALLIC | | IS LIMITED TO A TOTAL CAPACITY OF 695 CFH (695,000 BTU) | | AT 175 FT. TOTAL DEVELOPED LENGTH. THE 3/4-INCH PE IS | | LIMITED TO A TOTAL CAPACITY OF 791 CFH (791,000 BTU) AT | | TOTAL DEVELOPED LENGTH OF 175 FT. THE CALCULATIONS ON | | THE PLAN INDICATE THE TOTAL LOAD OF THE SYSTEM IS | | 1,194,000 BTU AT A TOTAL DEVELOPED LENGTH OF 176'-8". | | CORRECT THE RISER AND THE PLAN: | | A) INCREASE THE DIAMETER OF THE SCHED. 40 PIPE TO | | MINIMUM 1-INCH. | | B) INCREASE THE DIAMETER OF THE PE PIPE TO MINIMUM | | 1-INCH FOR THE PIPE RUN FROM THE SCHED. 40 TO A POINT | | BEYOND THE BRANCH CONNECTIONS TO THE WATER HEATERS. | | C) PIPE SIZES ARE BASED ON REDUCING THE TDL TO 175 FT. | | OTHERWISE THE SCHED. 40 PIPE SHALL BE INCREASED TO | | 1-1/4-INCH. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
P |
Date |
2022-09-19 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-09-19 |
Time |
10:44 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-08-30 |
Time |
15:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-08-15 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-08-03 |
Time |
13:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-07-26 |
Time |
09:14 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-07-08 |
Time |
08:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-07-07 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-07-07 |
Time |
14:03 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-07-01 |
Time |
08:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-06-29 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-29 |
Time |
11:16 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-15 |
Time |
10:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2022-07-25 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-07-25 |
Time |
12:08 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-07-25 |
Time |
12:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2022-09-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-09-07 |
Time |
09:07 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-09-07 |
Time |
09:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-08-15 |
Time |
14:35 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-08-15 |
Time |
12:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-07-26 |
Time |
07:45 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-07-26 |
Time |
07:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
5 |
Status |
P |
Date |
2022-09-19 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-09-19 |
Time |
10:12 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-09-19 |
Time |
10:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
4 |
Status |
P |
Date |
2022-09-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-09-07 |
Time |
09:07 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-09-07 |
Time |
09:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
3 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-08-15 |
Time |
08:51 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-08-15 |
Time |
07:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-07-12 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2022-07-12 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-07-07 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2022-07-07 |
Time |
|
Sent To |
|
|
Notes |
2022-07-07 14:03:33 | BUILDING DEPT. AFFIDAVIT AUDIT | | | | | | 1) THE MECHANICAL EQUIPMENT SIZING CALCULATIONS | | SUBMITTED ARE NOT LISTED ON THE AFFIDAVIT. | | | | 2) SUBMIT THE COMPLETE MECHANICAL EQUIPMENT SIZING | | CALCULATIONS. | | | | 3) S SHEETS HAVE A DRAWING DATE OF 05/27/2022 AND A | | REVISION DATE OF 05/26/2022. THE AFFIDAVIT STATES ALL | | PLANS DATED 05/26/2022. WHY IS THE DRAWING DATE NEWER | | THAN THE REVISION DATE? | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2022-09-29 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-09-29 |
Time |
09:35 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-09-07 |
Time |
09:35 |
Sent To |
|
|
Notes |
2022-08-31 06:51:11 | BUILDING PLANS SIGNATURES ARE GOOD. RM |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-08-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-08-15 |
Time |
14:08 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-08-15 |
Time |
14:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-07-12 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-07-12 |
Time |
13:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-07-06 |
|
|
Cont ID |
|
Sent By |
vbroglia |
Date |
2022-07-06 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
vbroglia |
Date |
2022-07-06 |
Time |
15:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-06-28 |
|
|
Cont ID |
|
Sent By |
vbroglia |
Date |
2022-06-28 |
Time |
17:19 |
Rev Time |
0.00 |
Received By |
vbroglia |
Date |
2022-06-28 |
Time |
17:19 |
Sent To |
|
|
Notes |
2022-06-28 17:22:00 | 6/28/2022 FAILED | | | | PURSUANT TO SECTION 94-305(B)(4) OF THE ZLDR: | | MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FEET | | INTO A REQUIRED SETBACK. | | | | GENERATOR MUST BE 6 FEET AWAY FROM REAR PROPERTY LINE | | AND CAN BE 1 FOOT FROM SIDE PROPERTY LINE | | | | VALENTINA BROGLIA | | [email protected] |
|
|