Plan Review Stops For Permit 22060269 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2023-06-02 |
|
|
Cont ID |
|
Sent By |
rbrown |
Date |
2023-06-02 |
Time |
11:12 |
Rev Time |
0.00 |
Received By |
rbrown |
Date |
2023-06-02 |
Time |
11:12 |
Sent To |
|
|
Notes |
2023-06-02 11:13:38 | NOTE ADDED TO FINAL INSPECTION STATING: | | BEFORE THIS ELECTRICAL PERMIT PASSES FINAL | | INSPECTION, RESTRIPE PERMIT 23050482 | | MUST PASS FINAL INSPECTION TO SHOW THAT | | AN ADA SPACE HAS A CHARGING STATION. RB |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
Sent By |
rbrown |
Date |
2023-04-11 |
Time |
19:09 |
Rev Time |
0.00 |
Received By |
rbrown |
Date |
2023-04-11 |
Time |
19:09 |
Sent To |
|
|
Notes |
2023-04-11 19:15:47 | ACCESSIBLE PARKING. | | PER THE COMMENT ALREADY PROVIDED UNDER THE ZONING | | REVIEW, AT LEAST ONE OF THE PROPOSED EV CHARGING POINTS | | MUST BE IN AN ACCESSIBLE PARKING SPACE. EV PARKING IS | | AN ADDITIONAL PARKING FACILITY JUST LIKE PARKING UNDER | | COVER IS AN ADDITIONAL PARKING FACILITY, AND EACH | | PARKING FACILITY SHALL OFFER ACCESSIBLE PARKING PER | | SECTION 208 OF FLORIDA ACCESSIBILITY CODE WHICH STATES | | THE FOLLOWING: | | 208 PARKING SPACES | | 208.2 MINIMUM NUMBER. | | PARKING SPACES COMPLYING WITH 502 SHALL BE PROVIDED IN | | ACCORDANCE WITH TABLE 208.2 EXCEPT AS REQUIRED BY | | 208.2.1, 208.2.2, AND 208.2.3. WHERE MORE THAN ONE | | PARKING FACILITY IS PROVIDED ON A SITE, THE NUMBER OF | | ACCESSIBLE SPACES PROVIDED ON THE SITE SHALL BE | | CALCULATED ACCORDING TO THE NUMBER OF SPACES REQUIRED | | FOR EACH PARKING FACILITY. | | | | **QUOTE PERMIT# ON ALL CORRESPONDENCE** | | | | END OF REVIEW COMMENTS | | THE CODE REFERENCES GIVE ADDITIONAL INFO | | ROBERT BROWN | | E-MAIL: [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-06-27 |
Time |
12:39 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-06-27 |
Time |
12:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2023-06-02 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-06-02 |
Time |
14:22 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-05-15 |
Time |
15:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-01-31 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2023-01-31 |
Time |
16:47 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-12-17 |
Time |
18:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-10-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-10-27 |
Time |
11:06 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-09-23 |
Time |
08:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-07-18 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-07-18 |
Time |
16:30 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-06-07 |
Time |
06:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-10-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-10-27 |
Time |
11:06 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-10-27 |
Time |
11:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-06-27 |
Time |
12:40 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-06-27 |
Time |
12:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2023-05-15 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-05-15 |
Time |
15:02 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2023-05-15 |
Time |
15:02 |
Sent To |
|
|
Notes |
2023-05-15 15:03:20 | PROVISO | | | | PRIOR TO THE FINAL ELECTRICAL (203) INSPECTION: | | A. STRIPING PERMIT 23050482 SHALL HAVE PASSED ITS FINAL | | (104) INSPECTION. | | B. LANDSCAPE PERMIT 23040273 SHALL HAVE PASSED ITS | | FINAL LANDSCAPE (502) INSPECTION FOR THE SCREENING AND | | TREE RELOCATION. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-01-31 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-01-31 |
Time |
16:40 |
Rev Time |
0.75 |
Received By |
eschneid |
Date |
2023-01-31 |
Time |
14:04 |
Sent To |
|
|
Notes |
2023-01-31 16:41:20 | FAILED | | | | 1) UPDATED COMMENT: THE DC CHARGEBOX IS MECHANICAL | | EQUIPMENT THAT IS REQUIRED TO BE SCREENED WITH A HEDGE | | GROWN TO THE FULL HEIGHT OF THE DC CHARGEBOX. **** | | SHEET E-3 CALLS OUT THAT THE CHARGEBOX WILL BE | | SCREENED. THE MINOR AMENDMENT LISTS THE SCREEN MATERIAL | | AS A COCOPLUM HEDGE. PRIOR TO ZONING APPROVAL OF THIS | | PERMIT, A LANDSCAPE PERMIT, SHOWING THE HEDGE | | SPECIFICATIONS MUST BE SUBMITTED. PRIOR TO THE FINAL | | INSPECTION FOR THE CHARGEBOX, THE LANDSCAPE PERMIT | | SHALL HAVE PASSED ITS FINAL INSPECTION (502). | | | | 2) UPDATED COMMENT: THE GOOGLE STREET VIEW SHOWS A TREE | | IN THE LOCATION OF THE PROPOSED DC CHARGEBOX. **** | | NEITHER THIS PERMIT NOR THE LANDSCAPE PLAN INCLUDED | | WITH THE MINOR AMENDMENT PROVIDE FOR THE DISPOSITION OF | | THIS TREE. | | A. IF THE TREE IS TO REMAIN IN PLACE, IT MUST BE | | CLEARLY SHOWN ON THIS PERMIT PLAN AS WELL AS THE MINOR | | AMENDMENT LANDSCAPE PLAN. | | B. IF THE TREE IS TO BE RELOCATED, THEN THIS SHALL BE | | CLEARLY SHOWN ON THE MINOR AMENDMENT LANDSCAPE PLAN AND | | PRIOR TO ZONING APPROVAL OF THIS PERMIT, A LANDSCAPE | | PERMIT, SHOWING THE NEW TREE LOCATION MUST BE | | SUBMITTED. PRIOR TO THE FINAL INSPECTION FOR THE | | CHARGEBOX, THE LANDSCAPE PERMIT SHALL HAVE PASSED ITS | | FINAL INSPECTION (502). | | | | 3) UPDATED COMMENT: THE PROPOSED EV PARKING SPACES ARE | | CUSTOMER PARKING SPACES, SO YOU ARE REQUIRED TO PROVIDE | | EV TO AT LEAST ONE ADA PARKING SPACE. **** THE | | SUBMITTED MINOR AMENDMENT SHOWS A PARKING ROW BEING | | RESTRIPED SO THAT ONE ADA PARKING SPACE HAS EV ACCESS. | | STAFF IS UNABLE TO LOCATE A PERMIT FOR THE PROPOSED | | RESTRIPING. PRIOR TO STAFF APPROVAL OF THIS PERMIT, A | | PERMIT TO RESTRIPE THE ADA PARKING SPACE LOCATION MUST | | BE SUBMITTED TO AND APPROVED BY THE CITY. PRIOR TO THE | | FINAL INSPECTION FOR THE EV CHARGERS, THE STRIPING | | PERMIT SHALL HAVE PASSED ITS FINAL INSPECTION. | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-10-26 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-10-26 |
Time |
16:41 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2022-10-26 |
Time |
14:39 |
Sent To |
|
|
Notes |
2022-10-26 16:43:06 | FAILED | | | | 1) PROVIDE A SITE PLAN THAT SHOWS THE LIMITS OF WORK | | FOR THE EV CHARGERS AND DC CHARGEBOX AT A LARGER SCALE. | | THE EV CHARGERS, DC CHARGEBOX, TO INCLUDE THE PAD, | | PARKING SPACES, SIDEWALKS AND LANDSCAPE AREAS SHALL BE | | CLEARLY IDENTIFIED, INCLUDING ACCURATE DIMENSIONS. | | | | 2) THE DC CHARGEBOX IS MECHANICAL EQUIPMENT IS REQUIRED | | TO BE SCREENED WITH A HEDGE GROWN TO THE FULL HEIGHT OF | | THE DC CHARGEBOX. | | | | 3) THE GOOGLE STREET VIEW SHOWS A TREE IN THE LOCATION | | OF THE PROPOSED DC CHARGEBOX. YOU HAVE TWO OPTIONS: | | A. LEAVE THE TREE IN PLACE AND INSTALL THE DC CHARGEBOX | | FURTHER EAST OUTSIDE OF THE TREE'S ROOT ZONE. THIS WILL | | REQUIRE THAT A HEDGE OF SUFFICIENT MATERIAL TO SCREEN | | THE DC CHARGEBOX BE SHOWN ON THE SITE PLAN. THE HEDGE | | MATERIAL MUST BE CALLED OUT ON THE SITE PLAN. | | B. INSTALL THE DC CHARGEBOX AS SHOWN AND RELOCATE THE | | TREE TO A LOCATION NEARBY. THIS REQUIRES THE SUBMITTAL | | OF A LANDSCAPE PLAN, CREATED BY A LANDSCAPE ARCHITECT, | | SHOWING THE NEW LOCATION OR THE TREE AND THE REQUIRED | | HEDGE, AS PART OF THIS PERMIT RESUBMITTAL. | | | | 4) THE PROPOSED EV PARKING SPACES ARE CUSTOMER PARKING | | SPACES, SO YOU ARE REQUIRED TO PROVIDE EV TO AT LEAST | | ONE ADA PARKING SPACE. THIS NEEDS TOO BE CLEARLY | | DESIGNATED ON THE PLANS. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-07-18 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-07-18 |
Time |
15:42 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2022-07-18 |
Time |
15:21 |
Sent To |
|
|
Notes |
2022-07-18 16:15:20 | FAILED | | | | 1) THE INSTALLATION OF THE ABOVE GROUND EV | | INFRASTRUCTURE REQUIRES CHANGES TO THE SITE AND | | LANDSCAPE PLANS. THESE CHANGES REQUIRE THE APPROVAL OF | | A MINOR PLANNED DEVELOPMENT AMENDMENT TO THE CURRENTLY | | APPROVED PLANS. PLEASE CONTACT ME FOR INFORMATION ON | | THE APPLICATION. THE MINOR PLANNED DEVELOPMENT | | AMENDMENT MUST BE APPROVED PRIOR TO THE ZONING APPROVAL | | OF THIS PERMIT. | | | | 2) THE PROPOSED LOCATION OF THE EV CHARGERS, THE DC | | CHARGEBOX, THE UNDERGROUND ELECTRIC CONNECTIONS, ETC. | | DIRECTLY CONFLICT WITH EXISTING LANDSCAPE. THE PROPOSED | | INSTALLATION MUST BE OVERLAID ON THE APPROVED LANDSCAPE | | PLAN TO VERIFY THAT THERE ARE NO CONFLICTS. PLEASE NOTE | | THAT STAFF WILL NOT SUPPORT THE REMOVAL OF TREES FOR | | THE INSTALLATION OF THE EV INFRASTRUCTURE. | | | | 3) THE DC CHARGEBOX IS MECHANICAL EQUIPMENT IS REQUIRED | | TO BE SCREENED. | | | | 4) THE SPACES THAT ARE ADJACENT TO THE EV SPACES ARE | | CUSTOMER PARKING SPACES, TO YOU ARE REQUIRED TO PROVIDE | | EV TO AT LEAST ONE ADA PARKING SPACE. | | | | 5) ADDITIONAL COMMENTS MAY BE ISSUED UPON REVIEW OF THE | | MINOR PLANNED DEVELOPMENT AMENDMENT APPLICATION. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] |
|
|