Plan Review Details - Permit 22050544
Plan Review Stops For Permit 22050544
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-05-12 Cont ID  
Sent By cpuell Date 2022-05-12 Time 15:47 Rev Time 0.00
Received By cpuell Date 2022-05-12 Time 15:47 Sent To  
Notes
2022-05-12 15:47:20ADDRESS APPROPRIATE FOR PROJECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:24 Rev Time 0.00
Received By cthroop Date 2022-06-21 Time 16:27 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 07:48 Rev Time 0.00
Received By cthroop Date 2022-05-18 Time 05:40 Sent To  
Notes
2022-05-21 08:13:13PLAN REVIEW BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 BU1635 BN4338
 ASFPM CFM US-21-11935
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 1ST REVIEW
 RESULTS: DENIED
  
 NOTICE: THE FOLLOWING CHECKLIST WAS PROVIDED BY ROBERT
 BROWN, B.O., FOR A FOUNDATION ONLY PERMIT:
 I HAVE ADDED TWO ADDITIONAL REQUIRED DOCUMENTS - AN
 ELECTRICAL PLAN (IF REQUIRED) AND A PLUMBING PLAN.
  
 1) PROPOSED BOUNDARY LINE SURVEY
 2) SITE PLAN
 3) FOUNDATION PLAN
 4) FIRST FLOOR PLAN
 5) CROSS-SECTION DRAWING OR ELEVATION DRAWING
 6) STORMWATER POLLUTION PREVENTION PLAN DETAILS (SILT
 FENCE, ETC.)
 7) GEOTECHNICAL REPORT (SOILS)
 8) AN UNDERGROUND ELECTRICAL PLAN (IF REQUIRED). A
 GROUNDING ELECTRODE SYSTEM DETAIL (UFER)
 9) AN UNDERGROUND PLUMBING PLAN (ISO) PER FLOOR PLAN
 LAYOUT OF PLUMBING FIXTURES
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE A STORMWATER POLUTION PREVENTION PLAN (SILT
 FENCE). YOU MAY SHOW THE LOCATION ON THE SITE PLAN OR
 SURVEY.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 2. PROVIDE AN UNDERGROUND ELECTICAL PLAN (IF REQUIRED).
 PROVIDE A DETAIL OF THE ELECTRICAL GROUNDING SYSTEM
 CONNECTION TO THE BUILDING STEEL (UFER CLAMP) OR (TWO
 GROUND RODS) SIX FEET APART.
 E3607.2 LOCATION OF GROUNDING ELECTRODE CONDUCTOR
 CONNECTION.
  
 3. PROVIDE AN UNDERGROUND PLUMBING PLAN (ISO) PER FLOOR
 PLAN LAYOUT.
 P2601.2 CONNECTIONS TO DRAINAGE SYSTEM
  
 NOTICE: PLAN SHEETS S1.0 AND S4.0 ARE LOCATED IN THE
 SIGNATURE FOLDER. THESE PLAN SHEETS NEED TO BE
 RE-LOCATED TO THE DRAWINGS FOLDER.
  
 NOTICE: PLAN SHEET 002, LABELED A-1 CONSTRUCTION PLAN
 AND PLAN SHEET 004, LABELED D-1 EXISTING-DEMO PLANS ARE
 FOR A DIFFERENT PROJECT, (1701 S. FLAGLER DR #509).
 PLEASE REMOVE THESE FROM YOUR SUBMITTAL.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:13 Rev Time 0.00
Received By cthroop Date 2022-06-21 Time 16:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 08:13 Rev Time 0.00
Received By cthroop Date 2022-05-18 Time 05:40 Sent To  
Notes
2022-05-21 08:14:01SEE COMMENTS UNDER 1ST BUILDING REVIEW.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status N Date 2022-05-16 Cont ID  
Sent By pleduc Date 2022-05-16 Time   Rev Time 0.00
Received By pleduc Date 2022-05-16 Time 12:57 Sent To  
Notes
2022-05-16 13:04:21A LIFE SAFETY REVIEW BY FIRE FOR A SFH IS NOT REQUIRED.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:22 Rev Time 0.00
Received By cthroop Date 2022-06-22 Time 07:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:24 Rev Time 0.00
Received By cthroop Date 2022-06-08 Time 13:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 09:10 Rev Time 0.00
Received By cthroop Date 2022-05-12 Time 06:16 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status N Date 2022-06-23 Cont ID  
Sent By lmarchan Date 2022-06-23 Time 10:37 Rev Time 0.00
Received By lmarchan Date 2022-06-23 Time 10:37 Sent To  
Notes
2022-06-23 10:37:38IMPACT WILL BE PAID ON MAIN CONSTRUCTION PERMIT
 22010260

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 08:14 Rev Time 0.00
Received By cthroop Date 2022-05-18 Time 05:40 Sent To  
Notes
2022-05-21 08:15:22IMPACT FEE QUESTIONNAIRE
  
 PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT
 LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO
 THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF.
 THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ
 B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
 UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE
 RECEIPT TO PROJECT DOX OR EMAIL IT TO
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:22 Rev Time 0.00
Received By cthroop Date 2022-06-21 Time 16:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 08:14 Rev Time 0.00
Received By cthroop Date 2022-05-18 Time 05:40 Sent To  
Notes
2022-05-21 08:14:33SEE COMMENTS UNDER 1ST BUILDING REVIEW.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-06-22 Cont ID  
Sent By cthroop Date 2022-06-22 Time 07:22 Rev Time 0.00
Received By cthroop Date 2022-06-21 Time 16:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-05-21 Cont ID  
Sent By cthroop Date 2022-05-21 Time 09:10 Rev Time 0.00
Received By cthroop Date 2022-05-18 Time 05:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-06-16 Cont ID  
Sent By vbroglia Date 2022-06-16 Time 14:28 Rev Time 0.00
Received By vbroglia Date 2022-06-16 Time 14:28 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-05-19 Cont ID  
Sent By vbroglia Date 2022-05-19 Time 16:23 Rev Time 0.00
Received By vbroglia Date 2022-05-19 Time 16:23 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved