Plan Review Stops For Permit 22050542 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-31 |
Time |
13:35 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-31 |
Time |
13:35 |
Sent To |
|
|
Notes |
2022-05-31 13:36:07 | ISSUED AT APPLICANT'S RISK | | A CURSORY REVIEW HAS BEEN DONE ON THE EXIT STRATEGY, | | REMOTENESS OF EXITS | | NO REVIEW WAS DONE OF THE DISTANCE TO PROPERTY LINE AND | | PERCENTAGE OF OPENINGS. REDUCED OPENINGS OR FIRE RATED | | OPENINGS MAY BE REQUIRED UPON A THOROUGH BUILDING | | REVIEW | | PROVISO: WHEN RESUBMITTING OR SUBMITTING ANY PAGES, | | PLEASE INCLUDE THE THRESHOLD STATEMENT AS REQUIRED. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-31 |
Time |
12:24 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-26 |
Time |
06:15 |
Sent To |
|
|
Notes |
2022-05-26 06:20:30 | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | THIS REVIEW IS BEING DONE UNDER BUILDING SO THE | | THRESHOLD REVIEW CAN BE FOCUSED ON THE SPECIAL | | INSPECTOR AGREEMENT. | | | | FS553.79(9)(D): | | | | (D)?ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED TO BE | | SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRESAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS CHAPTER AND CHAPTER 633. | | | | FOR 300 BANYAN, BLISSY & NYITRAY (STRUCTURAL ENGINEERS) | | HAS THIS STATEMENT ON THIS OFFICE HIGH RISE: | | | | TO THE BEST OF THE STRUCTURAL ENGINEER'S KNOWLEDGE, THE | | PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE | | MINIMUM BUILDING CODE. | | | | I UNDERSTAND THAT THE STRUCTURAL ENGINEER MAY OBJECT TO | | STATING COMPLIANCE WITH A CODE THAT THEY DO NOT KNOW | | (FS633), SO IT APPEARS THAT THIS WOULD BE REQUIRED OF | | THE ARCHITECT. | | | | TO RESOLVE - FOR THE FOUNDATION PERMIT, PLEASE REVISE | | **ONE** PAGE TO INCLUDE THE THRESHOLD STATEMENT AND | | EMAIL TO ME. PLEASE DO NOT SELECT A PAGE THAT HAS BEEN | | STAMPED BY ANOTHER DISCIPLINE. THIS REVIEW WILL THEN BE | | PASSED WITH PROVISOS: | | | | ISSUED AT APPLICANT'S RISK | | A CURSORY REVIEW HAS BEEN DONE ON THE EXIT STRATEGY, | | REMOTENESS OF EXITS | | NO REVIEW WAS DONE OF THE DISTANCE TO PROPERTY LINE AND | | PERCENTAGE OF OPENINGS. REDUCED OPENINGS OR FIRE RATED | | OPENINGS MAY BE REQUIRED UPON A THOROUGH BUILDING | | REVIEW | | PROVISO: WHEN RESUBMITTING OR SUBMITTING ANY PAGES, | | PLEASE INCLUDE THE THRESHOLD STATEMENT AS REQUIRED. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-31 |
Time |
12:26 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-24 |
Time |
10:19 |
Sent To |
|
|
Notes |
2022-05-24 10:20:17 | SEE REVIEW #2 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-05-12 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-05-12 |
Time |
14:51 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-05-12 |
Time |
11:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2022-05-26 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-05-26 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-05-26 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-05-23 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-05-23 |
Time |
|
Rev Time |
|
Received By |
rrossano |
Date |
2022-05-23 |
Time |
|
Sent To |
|
|
Notes |
2022-05-23 11:49:48 | UNDER FORMAL ENGINEERING SUBMITTAL REVIEW. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2022-05-12 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-05-12 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-05-12 |
Time |
11:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-06-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-01 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-31 |
Time |
16:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-05-31 |
Time |
16:16 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-05-25 |
Time |
08:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-05-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-24 |
Time |
11:01 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-12 |
Time |
09:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
N |
Date |
2022-05-25 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-25 |
Time |
12:38 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-25 |
Time |
12:38 |
Sent To |
|
|
Notes |
2022-05-25 12:38:54 | IMPACT FEES DEFERRED, TO BE PAID PRIOR TO ISSUANCE OF A | | VERTICAL CONSTRUCTION PERMIT | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2022-05-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-24 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-24 |
Time |
11:00 |
Sent To |
|
|
Notes |
2022-05-24 11:01:26 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION WILL OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE EMAIL THE RECEIPT | | TO [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-31 |
Time |
13:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-31 |
Time |
13:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-05-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-24 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-24 |
Time |
10:59 |
Sent To |
|
|
Notes |
2022-05-24 11:00:44 | ARCHITECTURAL PAGES APPEAR OK | | STRUCTURAL PAGES ARE NOT DIGITALLY SIGNED. FS471, | | DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. | | | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
3 |
Status |
P |
Date |
2022-06-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-03 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-03 |
Time |
14:16 |
Sent To |
|
|
Notes |
2022-06-03 14:17:12 | AN UPDATED SI AGREEMENT WAS RECEIVED VIA EMAIL. THE | | SI'S SIGNATURE IS NOTARIZED RATHER THAN SEALED. | | | | PROVISO: PROVIDE AN AGREEMENT EITHER DIGITALLY SIGNED | | BY THE SI OR DROP OFF AN ORIGINAL. | | | | | | UNIVERSAL ENGINEERING SERVICES | | SI - RODOLFO A GOZEMBACH, PE 45226 | | SHANKER RAJBHANDARI, BN 6096 | | CARLTON CROOK, BN3909 | | | | CARY LYLE SHIPPERT, CGC1511537 |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2022-06-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-01 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-01 |
Time |
15:53 |
Sent To |
|
|
Notes |
2022-06-01 16:12:48 | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | UNIVERSAL ENGINEERING SERVICES | | SI - RODOLFO A GOZEMBACH, PE 45226 | | SHANKER RAJBHANDARI, BN 6096 | | MAYRON MONTOYA, BN7899 | | CARLTON CROOK, BN3909 | | GASTON ALONSO, BN6390 | | | | CARY LYLE SHIPPERT, CGC1511537 | | | | | | THE SI AGREMENT IS A CONTRACT. THE PDF UPLOADED STARTS | | ON PAGE 7, 7, THEN 6, ETC. THE PDF SHOULD INCLUDE ALL | | PAGES, INCLUDING PAGES 1-6 WHICH INCLUDES WHAT THE | | INSPECTORS, CONTRACTOR, AND OWNER ARE AGREEING TO. THE | | SI AGREEMENT HAS OTHER DOCUMENTS INSERTED, PLEASE | | REMOVE. IT SHOULD BE ONE PDF WHICH INCLUDES ALL | | REQUIRED SIGNATURES AND EXCLUDES PAGES NOT IN OUR SI | | AGREEMENT. IT IS TO BE SIGNED BY ALL PARTIES. | | | | THE OWNER'S SIGNATURE IS IN THE DOCUMENT TWICE. EACH | | PAGE SHOULD BE UNIQUE OTHER THAN INSPECTORS, | | | | IT APPEARS THAT SOME INSPECTORS SIGNED THE SI AGREEMENT | | (TITLED "THRESHOLD/SPECIAL INSPECTOR AGREEMENT OF | | UNDERSTANDING") AND OTHERS SIGNED THE RESIDENT | | INSPECTOR AGREEMENT (TITLED "RESIDENT/SPECIAL | | INSPECTORS AGREMENT OF UNDERSTANDING"). NOT THAT THIS | | IS PAGE 15 OF THE RESIDENT INSPECTOR AGREMENT. SINCE | | THE SIGNED PAGES HAVE BEEN DETACHED FROM THE AGREEMENT, | | THE AGREEMENT ITSELF DOESN'T MAKE SENSE BECUASE THEY | | AREN'T AGREEING TO ANYTHING, SEE THE LANGUAGE "THIS | | AGREEMENT" ON EACH PAGE. | | | | THE SI PAGE PROPOSES RODOLFO A GOZEMBACH, PE 45226 AS | | THE SI, THE RESIDENT INSPECTOR AGREEMENT PROPOSES | | HECTOR VERGARA, PE25764. THE RESIDENT INSPECTOR PAGES | | SHOULD NOT BE SUBMITTED, ALL PARTIES SHOULD SIGN THE SI | | AGREEMENT, BUT ENSURE THAT THE CORRECT SI SIGNS THE | | AGREEMENT. | | | | THE PAGES WHERE THE INSPECTORS SIGNED ON THE | | CONTRACTOR'S PAGE ON THE RESIDENT INSPECTOR AGREEMENT | | ARE STILL IN THE PDF, REMOVE. | | | | REMOVE ALL DOCUMENTS THAT ARE NOT A PART OF THE CITY'S | | SI AGREEMENT. COPIES OF LICENSES CAN BE SUBMITTED IN A | | SINGLE SEPARATE PDF. RESUMES ARE NOT REQUIRED. | | | | PER FLORIDA BOARD OF PROFESSIONAL ENGINEERS, WHEN | | SIGNING AS AN ENGINEER, THE ENGINEER IS REQUIRED TO | | COMPLY WITH THE REQUIREMENT FOR AN ORIGINAL SIGNATURE | | AND SEAL. IF THE ENGINEER DOES NOT HAVE A DIGITAL | | SIGNATURE, PLEASE SCAN AND DROP OFF AN ORIGINAL TO THE | | BUILDING DIVISION. THE DESCRIPTION ON THE SUBMITTAL | | FORM SHOULD BE "SIGNATURE PAGE FOR SI AGREEMENT". | | ORIGINAL SIGNATURES FOR OTHERS IS NOT REQUIRED. | | | | IF YOU NEED A CLEAN PDF, PLEASE EMAIL | | [email protected] AND REQUEST THE SI AGREEMENT. | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-05-31 |
Time |
14:51 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-05-26 |
Time |
06:20 |
Sent To |
|
|
Notes |
2022-05-31 14:52:55 | PETER E VALENTI | | BUILDING PLANS EXAMINER II | | [email protected] | | 561 805 6673 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | | | THRESHOLD REVIEW DENIED: | | | | 1.) THE PAGES TITLED RESIDENT/SPECIAL INSPECTORS | | AGREEMENT OF UNDERSTANDING AT TOP OF PAGES ARE NOT | | APPLICABLE. | | 2.) THE (4) STATE LICENSED FS 468 INSPECTORS (BN 3909, | | BN6096, BN 6390, & BN 7899) HAVE COMPLETED THE CORRECT | | SECTIONS OF THRESHOLD/SPECIAL INSPECTORS AGREEMENT OF | | UNDERSTANDING. (OK) | | 3.) THRESHOLD INSPECTOR RODOLFO A. GONZEMBACH, PE | | 45226/SI 1065, DID NOT PROVIDE ENGINEER'S SEAL UNDER | | HIS SIGNATURE AS REQUIRED ON THRESHOLD/SPECIAL | | INSPECTOR AGREEMENT OF UNDERSTANDING. PLEASE PROVIDE | | CORRECT INFORMATION. | | 4.) THRESHOLD INSPECTOR HECTOR VERGARA, PE 25764/SI | | 0283, DID NOT DID NOT PROVIDE ENGINEER'S SEAL UNDER HIS | | SIGNATURE AS REQUIRED ON THRESHOLD/SPECIAL INSPECTOR | | AGREEMENT OF UNDERSTANDING. ALSO, THE RESIDENT/SPECIAL | | INSPECTOR FORM IS NOT APPLICABLE. PLEASE PROVIDE | | CORRECT INFORMATION. | | 5.) THE FLORIDA LICENSED CONTRACTOR SECTION ON THE | | THRESHOLD/SPECIAL INSPECTOR AGREEMENT OF UNDERSTANDING | | MUST BE COMPLETED BY THE CONTRACTOR. | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2022-05-18 |
Time |
16:56 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2022-05-18 |
Time |
16:56 |
Sent To |
|
|
Notes |
|
|