Plan Review Details - Permit 22050004
Plan Review Stops For Permit 22050004
Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2022-06-14 Cont ID  
Sent By rrossano Date 2022-06-14 Time   Rev Time 0.00
Received By rrossano Date 2022-06-14 Time   Sent To I
Notes
2022-06-14 11:52:58PASSED WITH PROVISOS:
  
 CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF PROPOSED
 DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER METERS,
 SANITARY CLEANOUTS, STORM INLETS ETC. IN VICINITY OF
 PROPOSED DRIVEWAY. DO NOT CONSTRUCT DRIVEWAY ON TOP OF
 WATER METERS, SANITARY CLEANOUTS, STORMWATER INLETS
 ETC.
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 ADDRESS ANY OUTSTANDING COMMENTS FROM OTHER REVIEWERS.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-05-23 Cont ID  
Sent By rrossano Date 2022-05-23 Time   Rev Time 0.00
Received By rrossano Date 2022-05-23 Time   Sent To  
Notes
2022-05-23 11:05:59TOTAL COMBINED DRIVEWAY WIDTHS AT RIGHT OF WAY CAN NOT
 EXCEED 20 FT. MAX. WIDTH.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-05-09 Cont ID  
Sent By rrossano Date 2022-05-09 Time   Rev Time  
Received By rrossano Date 2022-05-09 Time   Sent To  
Notes
2022-05-09 09:15:46FULL PROPERTY SURVEY SHOWS EXISTING DRIVEWAY ON EAST
 SIDE OF PROPERTY; TOTAL ALLOWABLE DRIVEWAY WIDTHS
 COMBINED AT RIGHT OF WAY IS 20 FT. MAX. PLUS 3 FT.
 FLARES ON EACH DRIVEWAY.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-15 Cont ID  
Sent By aoliver Date 2022-06-15 Time 07:27 Rev Time 0.00
Received By aoliver Date 2022-06-07 Time 06:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-24 Cont ID  
Sent By lmarchan Date 2022-05-24 Time 09:24 Rev Time 0.00
Received By lmarchan Date 2022-05-13 Time 15:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-09 Cont ID  
Sent By asangele Date 2022-05-09 Time 12:48 Rev Time 0.00
Received By asangele Date 2022-05-09 Time 12:48 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2022-06-10 Cont ID  
Sent By asangele Date 2022-06-10 Time 11:52 Rev Time 0.00
Received By asangele Date 2022-06-10 Time 11:52 Sent To  
Notes
2022-06-10 11:56:446/10/2022
 FAIL
 PLEASE PROVIDE ALL INFORMATION REGARDING THE NEW
 DRIVEWAY BEING CREATED AND THE SHRINKING OF THE
 EXISTING DRIVEWAY ON THE FULL SURVEY FOR FULL VISUAL.
 A PREVIOUSLY COMMENTS STATED
 *THERE IS A FRONT LANDSCAPE REQUIREMENT THE LESSER OF
 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT YARD AREA
 SHALL BE LANDSCAPED WITH LIVING PLANT MATERIAL (SUCH AS
 GRASS, GROUND COVER, SHRUBS, HEDGES, VINES OR TREES).
 * DRIVEWAY WIDTH CANNOT EXCEED 20FT IN WIDTH AND IF YOU
 HAVE TWO DRIVEWAYS THE WIDTH CANNOT EXCEED 10FT
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2022-05-19 Cont ID  
Sent By asangele Date 2022-05-19 Time 16:42 Rev Time 0.00
Received By asangele Date 2022-05-19 Time 16:42 Sent To  
Notes
2022-05-19 16:44:305/19/2022
 FAIL
 PLEASE ADDRESS PREVIOUS COMMENTS MADE.
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-05-09 Cont ID  
Sent By asangele Date 2022-05-09 Time 12:42 Rev Time 0.00
Received By asangele Date 2022-05-09 Time 12:42 Sent To  
Notes
2022-05-09 12:48:265/9/2022
 FAIL
 PLEASE PROVIDE A FULL PROPERTY SURVEY AND LABEL THE
 WIDTH OF THE CURRENT EXISTING DRIVEWAY.
 * A SINGLE DRIVEWAY CAN HAVE A WIDTH OF 20FT HOWEVER IF
 THERE ARE TWP SEPARTE DRIVEWAYS ON A PROPERTY THE WIDTH
 CANNOT EXCEED 10FT WIDTH EACH.
 THERE ALSO IS A FRONT LANDSCAPE REQUIREMENT
 THE LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE
 FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING PLANT
 MATERIAL (SUCH AS GRASS, GROUND COVER, SHRUBS, HEDGES,
 VINES OR TREES).
  
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]