Plan Review Stops For Permit 22040938 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2022-05-19 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-05-19 |
Time |
08:01 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-05-19 |
Time |
08:01 |
Sent To |
|
|
Notes |
2022-05-19 08:02:22 | ADDRESS ASIGNED ON 3/28/22 |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
4 |
Status |
F |
Date |
2023-05-30 |
|
|
Cont ID |
|
Sent By |
cseifer |
Date |
2023-05-30 |
Time |
10:00 |
Rev Time |
0.00 |
Received By |
cseifer |
Date |
2023-05-30 |
Time |
09:57 |
Sent To |
|
|
Notes |
2023-05-30 10:00:16 | 1) REPEAT COMMENT PER PLANNING: THE SURVEY SHOW THE | | POWER POLE SUPPLYING THE UNDERGROUND POWER ON PRIVATE | | PROPERTY. PLEASE OBTAIN PERMISSION FROM PROPERTY OWNER | | ALLOWING ACCESS TO THE POWER POLE ON THEIR PROPERTY, OR | | IF THERE IS ANY EASEMENT AT THIS LOCATION, SHOW IT ON | | THE SURVEY. THE UNDERGROUND POWER SHOULD BE LOCATED IN | | THE EASEMENT IF THERE IS ONE. | | | | CHLOE SEIFER | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
F |
Date |
2023-05-02 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2023-05-02 |
Time |
12:58 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2023-05-02 |
Time |
12:56 |
Sent To |
|
|
Notes |
2023-05-02 12:58:19 | REPEAT COMMENT FROM PLANNING: SURVEY SHOWS THE POWER | | POLE THAT WILL SUPPLY THE UNDERGROUND POWER ON PROVITE | | PROPERTY. IF THERE IS AN EASEMENT AT THIS LOCATION IT | | MUST BE SHOWN ON THE SURVEY AND THE UNDERGROUND | | ELECTRIC UST CLEARLY BE SHOWN IN THE EASEMENT. | | SUZANNE BERGLUND | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2022-12-30 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-12-30 |
Time |
09:15 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-12-30 |
Time |
09:11 |
Sent To |
|
|
Notes |
2022-12-30 09:15:21 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON THE PLANS | | AND PROFILE VIEW. CONTACT JANICE TARBILL, | | [email protected] FOR AS-BUILT INFORMATION. | | 1) SHOW UTILITY CROSSINGS ON BORE PROFILE. | | 3) ADD RESTORATION DETAILS. SIDEWALK RESTORATION | | REQUIRED PER CITY STANDARD. | | SUZANNE BERGLUND | | [email protected] | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-06-27 |
Time |
14:21 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-06-27 |
Time |
14:21 |
Sent To |
|
|
Notes |
2022-06-27 14:21:31 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | PLEASE CONTACT JANICE TARBILL, [email protected] FOR | | AS-BUILT INFORMATION. PLEASE INCLUDE AS-BUILT | | INFORMATION IN YOUR RESUBMITTAL. | | 2) PLEASE PROVIDE PROFILE FOR PROPOSED UNDERGROUND | | ELECTRIC SHOWING ALL CROSSING DATA FOR OTHER UTILITIES. | | 3) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | REQUIRED PER CITY STANDARD. | | | | SUZANNE BERGLUND | | [email protected] | | 561-494-1075 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
amcgrego |
Date |
2023-06-12 |
Time |
10:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2023-05-30 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2023-05-30 |
Time |
12:13 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2023-05-17 |
Time |
08:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-05-09 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2023-05-09 |
Time |
13:48 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2023-02-13 |
Time |
07:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-12-30 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-12-30 |
Time |
12:11 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-10-14 |
Time |
08:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-06-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-28 |
Time |
16:13 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-28 |
Time |
12:04 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2022-12-30 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-12-30 |
Time |
12:11 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-12-30 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-06-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-28 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-06-28 |
Time |
15:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
F |
Date |
2023-05-25 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-05-25 |
Time |
15:21 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2023-05-25 |
Time |
15:11 |
Sent To |
|
|
Notes |
2023-05-25 15:22:18 | INSUFFICIENT | | | | 1) UPDATED REPEAT COMMENT: THE SURVEY SHOWS THE POWER | | POLE THAT WILL SUPPLY THE UNDERGROUND POWER ON PRIVATE | | PROPERTY AND REQUIRING A CROSSING OF THE PRIVATE | | PROPERTY TO REACH THE HANDHOLE AT STA 0+00. IN ORDER | | FOR THE UNDERGROUND ELECTRIC TO CROSS PRIVATE PROPERTY, | | IT MUST BE LOCATED WITHIN A GENERAL UTILITY EASEMENT. | | THE SURVEY DOES NOT SHOW AN EASEMENT AT THIS LOCATION. | | IF THERE IS AN EASEMENT, IT MUST BE SHOWN ON THE SURVEY | | AND THE UNDERGROUND ELECTRIC MUST CLEARLY BE SHOWN IN | | THE EASEMENT. IF NO EASEMENT IS PRESENT, THE | | UNDERGROUND ELECTRIC MUST COME FROM AN ALTERNATIVE | | LOCATION. **** REGARDLESS WHO IS PULLING THE POWER, | | SINCE IT IS COMING FROM PRIVATE PROPERTY IT MUST BE IN | | AN EASEMENT AND YOU MUST PROVIDE THIS INFORMATION. | | | | THE POLE HEIGHT AND STYLE MEET CITY REQUIREMENTS. THE | | POLE COLOR AT THIS LOCATION IS CORRECTLY SHOWN AS | | RAL/RAYCAP 7042 TRAFFIC GREY A. | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-05-09 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-05-09 |
Time |
12:04 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2023-05-09 |
Time |
11:40 |
Sent To |
|
|
Notes |
2023-05-09 12:05:04 | INSUFFICIENT | | | | 1) REPEAT COMMENT: THE SURVEY SHOWS THE POWER POLE THAT | | WILL SUPPLY THE UNDERGROUND POWER ON PRIVATE PROPERTY | | AND REQUIRING A CROSSING OF THE PRIVATE PROPERTY TO | | REACH THE HANDHOLE AT STA 0+00. IN ORDER FOR THE | | UNDERGROUND ELECTRIC TO CROSS PRIVATE PROPERTY, IT MUST | | BE LOCATED WITHIN A GENERAL UTILITY EASEMENT. THE | | SURVEY DOES NOT SHOW AN EASEMENT AT THIS LOCATION. IF | | THERE IS AN EASEMENT, IT MUST BE SHOWN ON THE SURVEY | | AND THE UNDERGROUND ELECTRIC MUST CLEARLY BE SHOWN IN | | THE EASEMENT. IF NO EASEMENT IS PRESENT, THE | | UNDERGROUND ELECTRIC MUST COME FROM AN ALTERNATIVE | | LOCATION. | | | | 2) REPEAT COMMENT: SHEET E201 DOES NOT SHOW A POLE THAT | | MEETS THE CITY'S STEALTH REQUIREMENTS. THE ORIGINAL | | SUBMITTAL SHOWED A COMPLIANT POLE DESIGN. SHEETS A201 | | AND A502 SHOW A COMPLIANT POLE. ALL PLANS MUST SHOW | | CITY COMPLIANT POLES. | | | | 3) THE POLE HEIGHT AND STYLE (SUBJECT TO THE CORRECTION | | OF SHEET E201) MEET CITY REQUIREMENTS. THE POLE COLOR | | AT THIS LOCATION IS CORRECTLY SHOWN AS RAL/RAYCAP 7042 | | TRAFFIC GREY A. | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-12-19 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-12-19 |
Time |
16:00 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2022-12-19 |
Time |
14:06 |
Sent To |
|
|
Notes |
2022-12-19 16:00:27 | INSUFFICIENT | | | | 1) THE SURVEY SHOWS THE POWER POLE THAT WILL SUPPLY THE | | UNDERGROUND POWER ON PRIVATE PROPERTY AND REQUIRING A | | CROSSING OF THE PRIVATE PROPERTY TO REACH THE HANDHOLE | | AT STA 0+00. IN ORDER FOR THE UNDERGROUND ELECTRIC TO | | CROSS PRIVATE PROPERTY, IT MUST BE LOCATED WITHIN A | | GENERAL UTILITY EASEMENT. THE SURVEY DOES NOT SHOW AN | | EASEMENT AT THIS LOCATION. IF THERE IS AN EASEMENT, IT | | MUST BE SHOWN ON THE SURVEY AND THE UNDERGROUND | | ELECTRIC MUST CLEARLY BE SHOWN IN THE EASEMENT. IF NO | | EASEMENT IS PRESENT, THE UNDERGROUND ELECTRIC MUST COME | | FROM AN ALTERNATIVE LOCATION. | | | | 2) THE UPDATED SURVEY SHOWS THE FULL LENGTH OF THE | | POWER ROUTE, TO INCLUDE THE HANDHOLES AND BORE PITS, IS | | LOCATED WITHIN THE RIGHT-OF-WAY, HOWEVER, THE LOCATION | | OF THE GAS LINE AT STA 0+00 IS NOT SHOWN AT THE SAME | | LOCATION ON THE SURVEY AND SHEET E101. BASED ON THE | | SURVEY, THERE IS A DIRECT CONFLICT WITH THE HANDHOLE | | AND ITS EXCAVATION AND THE GAS LINE. YOU NEED TO | | PROVIDE VERIFICATION FROM FPU THAT THEY DO NOT OBJECT | | TO THE PROPOSED INSTALLATION LOCATION OF YOUR | | FACILITES. | | | | 3) THE LAT/LON FOR THE POLE ON THE SURVEY AND SITE PLAN | | IS SHOWN AS THE HANDHOLE LOCATION ON THE POWER ROUTE | | PLAN. PLEASE ENSURE THAT ALL PLANS ARE LABELED | | CORRECTLY. | | | | 4) THE NEWLY UPLOADED SHEET E201 DOES NOT SHOW A POLE | | THAT MEETS THE CITY'S STEALTH REQUIREMENTS. THE | | ORIGINAL SUBMITTAL SHOWED A COMPLIANT POLE DESIGN. | | SHEETS A201 AND A502 SHOW A COMPLIANT POLE. | | | | 5) THE POLE HEIGHT AND STYLE (SUBJECT TO THE CORRECTION | | OF SHEET E201) MEET CITY REQUIREMENTS. THE POLE COLOR | | AT THIS LOCATION IS CORRECTLY SHOWN AS RAL/RAYCAP 7042 | | TRAFFIC GREY A. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-05-26 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-05-26 |
Time |
17:32 |
Rev Time |
0.75 |
Received By |
eschneid |
Date |
2022-05-26 |
Time |
16:28 |
Sent To |
|
|
Notes |
2022-05-26 17:32:02 | INSUFFICIENT | | | | 1) THE TALLEST UTILITY POLE IN THE RIGHT-OF-WAY SHOWN | | ON THE SURVEY IS LISTED AT 31.6 FEET TALL. THE WIRELESS | | FACILITY SHOWN ON SHEET A201 IS 32 FEET IN HEIGHT, | | WHICH EXCEEDS THE ALLOWANCE LISTED IN SECTION | | 94-411(G)(1) OF THE CITY CODE. | | | | 2) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | SURVEYOR, SHOWING THE RIGHT-OF-WAY LINE AND THE EDGE OF | | THE SIDEWALK, WITH DIMENSIONS FOR THE FULL LENGTH OF | | THE UNDERGROUND POWER ROUTE SO THAT STAFF CAN VERIFY | | THAT IT IS WITHIN A RIGHT-OR-WAY AND DOES NOT CONFLICT | | WITH ANY UNDERGROUND FACILITIES, INCLUDING LANDSCAPE | | ROOT AREAS. | | | | 3) THANK YOU FOR PROVIDING THE CROSS SECTION OF THE | | UNDERGROUND ELECTRIC BORE; HOWEVER, THE 2.5-FOOT DEPTH | | IS NOT SUFFICIENT DEPTH TO AVOID THE ROOT SYSTEMS FOR | | THE TREES THAT THE BORE GOES UNDER. AT LEAST 3-FOOT | | DEPTH IS REQUIRED. THE CROSS SECTION NEEDS TO INCLUDE | | THE UTILITIES THAT IT CROSSES AND THE POLE EMBEDMENTS | | TO VERIFY THAT IT HAS SUFFICIENT DEPTH TO AVOID THEM. | | | | 4) THE POLE STYLE MEETS CITY REQUIREMENTS. THE POLE | | COLOR AT THIS LOCATION SHALL BE RAL/RAYCAP 7042 TRAFFIC | | GREY A. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | | | |
|
|