Plan Review Stops For Permit 22040922 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2022-07-07 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-07 |
Time |
11:02 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-07 |
Time |
10:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2022-06-30 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-06-30 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-06-30 |
Time |
13:47 |
Sent To |
|
|
Notes |
2022-06-30 15:59:14 | BUILDING REVIEW COMMENTS: | | | | W.P.B. PERMIT: 22040922 | | REVIEWED: JUNE 30, 2022 | | | | DYLAN BATTLES | | BUILDING PLANS EXAMINER PX4191 | | [email protected] | | 561-805-6718 | | | | FLORIDA BUILDING CODE,7TH EDITION (2020) | | FBC[AMENDED] = 2017 CHAPTER 1 WPB AMENDMENTS (SEE LINK | | BELOW) | | HTTPS://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/ | | BUILDING-PERMIT-FORMS | | FBC[B] = FBC BUILDING | | FBC[EXISTING] = FBC EXISTING BUILDING | | | | | | THE PRESSURE DESIGN WAS RECEIVED AND REVIEWED. | | IT STATES | | OPENING 1 DESIGN PRESSURES OF +66.4 AND -64.4 INTERIOR | | ZONE | | OPENING 2 AND 3 DESIGN PRESSURES +66.4 AND -121.8 | | EXTERIOR ZONE | | | | WITH THOSE DESIGN PRESSURES WE NOW NEED TO SEE THAT THE | | SELECTIONS MADE WILL EXCEED THOSE PRESSURES. | | SHEET 13 OF 20 IN PRODUCT APPROVAL SELECTS SPACING FOR | | -75 PRESSURE. | | | | PLEASE UPDATE YOUR SELECTION FOR OPENINGS 2 AND 3 TO | | MEET OR EXCEED -121.8 AS INDICATED AS DESIGN PRESSURE. | | | | ALSO, UPDATE THE INSTALLATION SCHEDULE TO SHOW THE | | DESIGN PRESSURES IN COLUMN 3. THEY SHOULD MATCH THE | | DESIGN PRESSURES FROM THE ENGINEER. | | | | PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F | | 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME | | [email protected] | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-11 |
Time |
08:32 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-11 |
Time |
08:30 |
Sent To |
|
|
Notes |
2022-06-11 08:37:45 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | | | ONLY WIND LOAD ENGINEERING WAS SUBMITTED FOR 2ND REVIEW | | | | 1. FBC B 1609, FS471, THE DESIGN PRESSURES SPECIFIED BY | | THE ENGINEER ARE HIGHER THAN THE DESIGN PRESURES THE | | CONTRACTOR USED TO SPECIFY FASTENING. | | | | EMAIL [email protected], REQUEST THAT THE | | DOCUMENT SE210555. LAVIA. DESIGN PRESSURE.PDF BE | | DELETED AS IT IS IN CONFLICT WITH THE ENGINEERING. | | | | SEE THE ENGINEERING PROVIDED. THE ENGINEER SPECIFIES: | | | | ZONE 4: +66.4/-66.4 | | ZONE 5: +66.4/-121.8 | | | | SEE THE FLOOR PLAN. THE WAY THAT THE DRAWING DEPICTS | | THE SHUTTERS, AT LEAST A PORTION IS IN ZONE 5. | | THEREFORE YOU NEED TO USE EITHER ZONE 5 PRESSURES OR | | HAVE THE ENGINEER SPECIFY DESIGN PRESSURES FOR EACH | | OPENING. | | | | OR, REDRAW THE PLAN SHOWING THE DISTANCE FROM THE | | CORNER TO THE EDGE OF THE SHUTTER. | | | | 2. THE INSTALLATION SCHEDULE CANNOT BE REVIEWED UNTIL | | DESIGN PRESSURES ARE DETERMINED. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-05-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-16 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-16 |
Time |
10:52 |
Sent To |
|
|
Notes |
2022-05-16 10:53:16 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | | | 1. FBC B 1609, FS471, DESIGN PRESSURES FOR BUILDINGS | | OVER 60' ARE TO BE SPECIFIED BY AN ENGINEER. THE | | INSTALLATION SCHEDULE WILL NOT BEEN REVIEWED UNTIL | | DESIGN PRESSURES ARE DETERMINED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-07-07 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-07 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-01 |
Time |
14:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-06-30 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-06-30 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-06-16 |
Time |
14:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-11 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-02 |
Time |
08:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-05-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-16 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-04-20 |
Time |
07:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2022-06-30 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-06-30 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-06-30 |
Time |
13:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-11 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-11 |
Time |
08:29 |
Sent To |
|
|
Notes |
2022-06-11 08:30:35 | DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED FOR | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. | | | | IT IS MY UNDERSTANDING THAT RICHARD NEET, PE, | | ENGINEERING EXPRESS, HAS A DIGITAL SIGNATURE. PLEASE | | OBTAIN A DIGITALLY SIGNED ORIGINAL AND UPLOAD, | | RESUBMIT. | | | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-05-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-05-16 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-05-16 |
Time |
10:52 |
Sent To |
|
|
Notes |
2022-05-16 10:52:16 | SEE BUILDING COMMENTS | | |
|
|