|
 |
 |
 |
 |
 |
Plan Review Details - Permit 22040904
Plan Review Stops For Permit 22040904 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-06-07 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-06-07 |
Time |
15:11 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-06-07 |
Time |
15:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-06-02 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-06-02 |
Time |
12:39 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-06-02 |
Time |
07:56 |
Sent To |
|
|
Notes |
2022-06-02 12:39:39 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | SUBMITTED SIGNED AND SEALED ENHANCED NAILING | | CALCULATIONS IS A COPY OF A WET SIGNATURE. PROVIDE | | ORIGINAL DOCUMENTS. | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER UPLOAD A VALID ELECTRONICALLY SIGNED PLAN TO ME, | | OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED AND | | SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | BUILDING DIVISION, FIRST FLOOR | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6656. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-05-02 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-05-02 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-05-02 |
Time |
07:41 |
Sent To |
|
|
Notes |
2022-05-02 08:41:53 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected]. | | | | 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT | | APPROVAL FL14317-R12 COVERS MULTIPLE PRODUCT TYPES; | | ROOF COVER OPTIONS; ALLOWABLE | | UNDERLAYMENT/TILE-ADHESIVE COMBINATIONS, ALLOWABLE | | SUBSTRATES & INSTALLATION METHODS. SELECT ALL | | APPLICABLE OPTIONS. ALL APPLICABLE DETAILS AND | | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT | | APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT | | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED | | SITE-SPECIFIC ENGINEERING. | | 2. FBC B 107.2.1. PLEASE PROVIDE ENGINEER'S SIGNED AND | | SEALED FASTENER SPACING DETAIL WITH CALCULATIONS FOR | | PERIMETERS AND CORNERS AS PER PRODUCT APPROVAL | | LIMITATIONS #7 OF MIAMI-DADE NOA NO.: 20-0131.01. | | PLEASE NOTE THIS PROJECT IS LOCATED IN AN EXPOSURE C | | CATEGORY AREA. | | 3. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF | | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING | | CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), | | MEAN ROOF HEIGHT(S). FLAT/LOW SLOPE ROOFS MUST SHOW | | POSITIVE DRAINAGE. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-06-07 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-06-07 |
Time |
15:11 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-06-07 |
Time |
12:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-06-02 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-06-02 |
Time |
12:39 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-05-19 |
Time |
07:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-05-02 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-05-02 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-04-29 |
Time |
08:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-06-07 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2022-06-07 |
Time |
15:08 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2022-06-07 |
Time |
15:08 |
Sent To |
|
|
Notes |
2022-06-07 15:10:42 | PETER E VALENTI | | BUILDING PLANS EXAMINER II | | [email protected] | | 561 805 6673 | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC M = FBC MECHANICAL | | FBC FG = FBC FUEL GAS | | | | SIGNATURE REVIEW APPROVED: | | | | THE PAPER SUBMITTAL OF THE BASE SHEET ATTACHMENT | | CALCULATIONS ARE HAND SIGNED/SEALED BY PROFESSIONAL | | ENGINEER. | | | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-06-02 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-06-02 |
Time |
12:38 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-06-02 |
Time |
12:37 |
Sent To |
|
|
Notes |
2022-06-02 12:39:05 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | SUBMITTED SIGNED AND SEALED ENHANCED NAILING | | CALCULATIONS IS A COPY OF A WET SIGNATURE. PROVIDE | | ORIGINAL DOCUMENTS. | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER UPLOAD A VALID ELECTRONICALLY SIGNED PLAN TO ME, | | OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED AND | | SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | BUILDING DIVISION, FIRST FLOOR | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6656. | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |