Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-05-23 Cont ID  
Sent By rrossano Date 2022-05-23 Time   Rev Time 0.00
Received By rrossano Date 2022-05-23 Time   Sent To I
Notes
2022-05-23 11:47:56PAVER AGREEMENT WAS NOT RECORDED/STAMPED AT COURTHOUSE.
 PLEASE NOTE THAT PAVER AGREEMENT IS ONLY REQUIRED IF
 PAVERS ARE BEING PLACED IN THE RIGHT OF WAY/OUTSDIE OF
 PROPERTY.
  
 SIDEWALK PORTION OF DRIVEWAY SHALL BE 6" THICK PER CITY
 OF WPB STANDARD DETAIL. CONSTRUCT DRIVEWAY APRON IN
 COMPLIANCE WITH WPB CONSTRUCTION STANDARD DETAIL GC-5
 (WHEN DISTANCE BETWEEN CURB OR EDGE OF PAVEMENT IS 10
 FT. OR GREATER), OR STANDARD DETAIL GC-6 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS LESS THAN 10 FT.)
 CITY STANDARD DETAIL IS REQUIRED, SEE LINK BELOW:
 HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION. DO NOT CONSTRUCT DRIVEWAY APRON ON TOP OF
 WATER METER, STROM INLET, SANITARY CLEANOUT ETC.
  
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-04-13 Cont ID  
Sent By rrossano Date 2022-04-13 Time   Rev Time  
Received By rrossano Date 2022-04-13 Time   Sent To  
Notes
2022-04-13 12:16:18THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF PAVERS
 ARE USED IN THE RIGHT OF WAY PORTION OF THE DRIVEWAY.
 THE AGREEMENT MUST BE RECORDED AT PALM BEACH COUNTY
 COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED COPY OF
 THIS DOCUMENT SHOULD BE FAXED TO (561) 494-1116.
 ATTENTION: DRIVEWAY REVIEWER, AND ALSO UPLOADED WITH
 RESUBMITTAL OF DEVELOPMENT SERVICES APPLICATION FOR
 DRIVEWAY. DOCUMENT NEEDS TO BE RECORDED PRIOR TO FINAL
 SIGN OFF.
  
 PAVERS CAN NOT BE USED WITHIN THE SIDEWALK.
  
 FOR A PDF COPY OF THE PAVER DRIVEWAY AGREEMENT GO TO:
 HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3298/637
 523652570000000
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 (561) 494-1098, FAX: (561) 494-1116 EMAIL:
 [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-04-28 Cont ID  
Sent By amhamilt Date 2022-04-28 Time 15:30 Rev Time 0.00
Received By amhamilt Date 2022-04-28 Time 15:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-24 Cont ID  
Sent By lmarchan Date 2022-05-24 Time 09:28 Rev Time 0.00
Received By lmarchan Date 2022-05-16 Time 08:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-29 Cont ID  
Sent By aoliver Date 2022-04-29 Time 09:16 Rev Time 0.00
Received By aoliver Date 2022-04-07 Time 07:30 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-05-20 Cont ID  
Sent By afowlkes Date 2022-05-20 Time 10:45 Rev Time 0.00
Received By afowlkes Date 2022-05-20 Time 10:45 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-04-21 Cont ID  
Sent By afowlkes Date 2022-04-21 Time 14:35 Rev Time 0.00
Received By afowlkes Date 2022-04-21 Time 14:35 Sent To  
Notes
2022-04-21 14:38:3604/21/22 FAILED - PLEASE CONFIRM THAT THE PROPOSED
 DRIVEWAY WILL BE SET BACK AT LEAST 3 FEET FROM THE
 WESTERN PROPERTY LINE
  
 ALEXANDER FOWLKES
 5618221431
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved