2022-04-05 09:05:31 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR EMAIL [email protected]. |
| |
| 1. SUBMITTED PRODUCT APPROVAL FL5680-R27 HAS BEEN |
| REVISED TO FL5680-R33. PLEASE PROVIDE A COMPLETE SET. |
| INCLUDE COVER PAGE, EVALUATION REPORTS PAGES 1-6 TO |
| INCLUDE LIMITATIONS PAGE(S)AND INSTALLATION |
| INSTRUCTIONS FOR SYSTEM USED. ALL APPLICABLE DETAILS |
| AND ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE |
| PRODUCT APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| SITE-SPECIFIC ENGINEERING. AS PER RULE 61G20-3. |
| 2. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| APPROVAL FL5680-R27 SYSTEM NO. W-63 DOES NOT MEET THE |
| MINIMUM ZONE 3 DESIGN PRESSURE REQUIREMENT OF -108.17 |
| FOR EXPOSURE CATEGORY C AREAS. PROVIDE SYSTEM THAT |
| MEETS OR EXCEEDS ALL DESIGN PRESSURE REQUIREMENTS FOR |
| EXPOSURE CATEGORY C/PROVIDE SIGNED AND SEALED |
| ENGINEERED NAILING CALCULATIONS WITH AN APPROVED |
| SYSTEM. |
| 3. FBC R 905.1.1 ASPHALT SHINGLE, METAL, MINERAL |
| SURFACE, SLATE AND SLATE-TYPE ROOFING MUST COMPLY WITH |
| NEW 2020 BUILDING CODE UNDERLAYMENT REQUIREMENTS. |
| PROVIDE METHOD OF COMPLIANCE. (IF USING DOUBLE 30# FELT |
| INDICATE ON ROOF DRAWING/SKETCH). |
| 4. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| DIAGRAM/SKETCH AND INCLUDE ROOF SLOPE(S), MEAN ROOF |
| HEIGHT(S). LOW SLOPE ROOFS MUST SHOW POSITIVE DRAINAGE. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| |