Plan Review Stops For Permit 22031527 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-07-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-07-15 |
Time |
09:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-07-15 |
Time |
09:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2022-05-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-05-12 |
Time |
07:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-05-12 |
Time |
07:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-06-06 |
|
|
Cont ID |
|
Sent By |
ppetty |
Date |
2022-06-06 |
Time |
13:20 |
Rev Time |
0.00 |
Received By |
ppetty |
Date |
2022-06-06 |
Time |
11:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-04-25 |
|
|
Cont ID |
|
Sent By |
ppetty |
Date |
2022-04-25 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
ppetty |
Date |
2022-04-25 |
Time |
08:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2022-04-04 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-04-04 |
Time |
15:07 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-04-04 |
Time |
15:07 |
Sent To |
|
|
Notes |
2022-04-04 15:07:45 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT | | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND | | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC | | SEC. 105.1. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-07-15 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-07-15 |
Time |
09:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-05-18 |
Time |
05:50 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-05-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-05-12 |
Time |
07:40 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-03-31 |
Time |
06:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-05-24 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-05-24 |
Time |
11:30 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-05-24 |
Time |
11:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-04-04 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-04-04 |
Time |
15:04 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-04-04 |
Time |
14:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-06-06 |
|
|
Cont ID |
|
Sent By |
ppetty |
Date |
2022-06-06 |
Time |
13:21 |
Rev Time |
0.00 |
Received By |
ppetty |
Date |
2022-06-06 |
Time |
13:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-05-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-05-12 |
Time |
06:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-05-12 |
Time |
06:48 |
Sent To |
|
|
Notes |
2022-05-12 06:50:55 | THE ENGINEER'S DIGITAL SIGNATURE COULD NOT BE VERIFIED. | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | THE ARCHITECT OR ENGINEER'S DIGITAL SIGNATURE ON THEM. | | YOU ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND | | SEALED PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC | | PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT THE | | CORRESPONDING PAPER DRAWINGS AT THE BUILDING DEPARTMENT | | TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S ORIGINAL | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | SIGNATURE ARE ACCEPTABLE. FS 481 & FAC 61G1 OR FS 471 & | | FAC 61G15 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-05-20 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-05-20 |
Time |
12:31 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-05-20 |
Time |
12:31 |
Sent To |
|
|
Notes |
2022-05-20 12:32:44 | 05/20/22 PASSED - WATER MUST DRAIN AWAY FROM THE POOL | | AND NOT ONTO ADJACENT PROPERTIES. | | | | ALEXANDER FOWLKES | | 5618221431 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-04-11 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-04-11 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-04-11 |
Time |
10:18 |
Sent To |
|
|
Notes |
2022-04-11 10:22:57 | 04/11/22 FAILED - PER CITY CODE, IF A PATIO OR PAVED | | AREA IS PROVIDED ADJACENT TO OR SURROUNDING A POOL, IT | | SHALL BE DESIGNED TO DRAIN AWAY FROM THE POOL, BUT NOT | | ONTO ADJACENT PROPERTIES. THE POOL PLAN DOES NOT | | DESIGNATE WHERE WATER WILL DRAIN TO. PLEASE AMEND AND | | RESUBMIT | | | | ALEXANDER FOWLKES | | 5618221431 | | [email protected] |
|
|