Plan Review Details - Permit 22031010
Plan Review Stops For Permit 22031010
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-03-24 Cont ID  
Sent By pvalenti Date 2022-03-24 Time 08:19 Rev Time 0.00
Received By pvalenti Date 2022-03-24 Time 07:46 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-07 Cont ID  
Sent By pvalenti Date 2023-03-07 Time 08:00 Rev Time 0.00
Received By pvalenti Date 2023-03-07 Time 07:59 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-03-24 Cont ID  
Sent By pvalenti Date 2022-03-24 Time 09:14 Rev Time 0.00
Received By pvalenti Date 2022-03-24 Time 07:46 Sent To  
Notes
2022-03-24 09:17:56PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION.
  
 3. WATERDOWN METHOD DURING DEMO:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-03-01 Cont ID  
Sent By rrossano Date 2023-03-01 Time   Rev Time 0.00
Received By rrossano Date 2023-03-01 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-03-28 Cont ID  
Sent By rrossano Date 2022-03-28 Time   Rev Time  
Received By rrossano Date 2022-03-28 Time   Sent To  
Notes
2022-03-28 09:58:16UNDER FORMAL ENGINEERING SUBMITTAL REVIEW.
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-03-28 Cont ID  
Sent By amhamilt Date 2022-03-28 Time 14:47 Rev Time 0.00
Received By amhamilt Date 2022-03-28 Time 14:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-07 Cont ID  
Sent By pvalenti Date 2023-03-07 Time 08:00 Rev Time 0.00
Received By pvalenti Date 2023-03-01 Time 16:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-29 Cont ID  
Sent By aoliver Date 2022-03-29 Time 10:50 Rev Time 0.00
Received By aoliver Date 2022-03-22 Time 07:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-03-07 Cont ID  
Sent By pvalenti Date 2023-03-07 Time 08:00 Rev Time 0.00
Received By pvalenti Date 2023-03-07 Time 07:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-03-24 Cont ID  
Sent By pvalenti Date 2022-03-24 Time 08:18 Rev Time 0.00
Received By pvalenti Date 2022-03-24 Time 07:46 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-03-28 Cont ID  
Sent By jroach Date 2022-03-28 Time 14:47 Rev Time 0.00
Received By amhamilt Date 2022-03-28 Time 14:47 Sent To  
Notes
***NONE***