|
 |
 |
 |
 |
 |
Plan Review Details - Permit 22030603
Plan Review Stops For Permit 22030603 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2023-06-01 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2023-06-01 |
Time |
15:49 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2023-06-01 |
Time |
15:49 |
Sent To |
|
|
Notes |
2023-06-01 15:49:59 | ADDRESS ASSIGNED TO PROJECT 4614 @ PINEWOOD AVE, | | UPDATED PERMIT |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-08-04 |
Time |
|
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-08-03 |
Time |
13:51 |
Sent To |
|
|
Notes |
2022-08-03 13:52:31 | PLEASE CONTACT [email protected], TO BE ASSIGNED A | | GENERIC PROPERTY CONTROL NUMBER FOR MCI METRO, ALSO | | PLEASE EMAIL A SITE PLAN SHOWING THE EXACT LOCATION OF | | THE WHERE THE WORK IS TO BE DONE. IN THE FUTURE PLEASE | | MAKE SURE THAT YOU COORDINATE WITH | | [email protected] OR CALL 561-805-6659 BEFORE | | APPLYING FOR A PERMIT TO BE ISSUED AN @ ADDRESS. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-08-17 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-08-17 |
Time |
09:31 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-08-17 |
Time |
09:30 |
Sent To |
|
|
Notes |
2022-08-17 09:31:11 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | MATERIAL, AND DESCRIPTION ON BOTH PLAN VIEW AND PROFILE | | VIEW. CONTACT JANICE TARBILL, [email protected] FOR | | AS-BUILT INFORMATION. INCLUDE AS-BUILT INFORMATION IN | | YOUR RESUBMITTAL. | | 2) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | REQUIRED PER CITY STANDARD, PARTIAL SIDEWALK FLAG | | REPLACEMNTS ARE NOT ACCEPTABLE. PLEASE USE CITY OF WEST | | PALM BEACH STANDARD DETAILS. | | | | SUZANNE BERGLUND | | [email protected] | | 561-494-1075 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
amcgrego |
Date |
2023-06-02 |
Time |
10:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-08-25 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-08-25 |
Time |
08:23 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-07-19 |
Time |
18:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2022-08-25 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-08-25 |
Time |
08:24 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-08-25 |
Time |
08:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-08-24 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-08-24 |
Time |
17:24 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2022-08-24 |
Time |
17:24 |
Sent To |
|
|
Notes |
2022-08-24 17:25:22 | INSUFFICIENT | | | | 1) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | SURVEYOR, THAT SHOWS THE RIGHT-OF-WAY LINE, THE | | SIDEWALK, AND ANY TREES WITHIN THE RIGHT-OF-WAY ALONG | | THE ENTIRE FIBER CONDUIT PATH SO THAT STAFF CAN VERIFY | | THAT THE BORE, OPEN TRENCH AND ANY REQUIRED BORE PIT | | AND HANDHOLES ARE WITHIN THE RIGHT-OF-WAY AND NOT ON | | PRIVATE PROPERTY. THE SURVEY NEEDS TO INCLUDE THE | | LOCATION OF PROPOSED HANDHOLE 00+00 AND THE BORE | | SECTION IN 45TH STREET SO THAT STAFF CAN VERIFY THAT | | THE PROPOSED WORK IS EXCLUSIVELY WITHIN PALM BEACH | | COUNTY RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. IN | | ORDER TO INSTALL HANDHOLES, ETC., AND BORE UNDER | | PRIVATE PROPERTY IT MUST BE IN A GENERAL UTILITY | | EASEMENT WHICH MUST BE CLEARLY SHOWN ON THE SURVEY. | | | | 2) THE TUBULAR MARKERS ARE NOT PERMITTED. MARKERS MAY | | ONLY BE INSTALLED WITHIN THE HANDHOLES OR OTHERWISE | | BURIED. | | | | 3) THE BORE DEPTH IS SUFFICIENT TO AVOID TREE ROOTS. | | | | 4) PROVIDE A COPY OF THE PALM BEACH COUNTY ROW PERMIT | | APPROVING THE WORK WITHIN THE 45TH STREET RIGHT-OF-WAY. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |