Plan Review Details - Permit 22030251
Plan Review Stops For Permit 22030251
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-04-19 Cont ID  
Sent By rmcphers Date 2022-04-19 Time 09:36 Rev Time 0.00
Received By rmcphers Date 2022-04-19 Time 09:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-04-07 Cont ID  
Sent By rmcphers Date 2022-04-07 Time 10:24 Rev Time 0.00
Received By rmcphers Date 2022-04-07 Time 10:24 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2022-04-13 Cont ID  
Sent By rrossano Date 2022-04-13 Time   Rev Time 0.00
Received By rrossano Date 2022-04-13 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-03-14 Cont ID  
Sent By rrossano Date 2022-03-14 Time   Rev Time 0.00
Received By rrossano Date 2022-03-14 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-04-14 Cont ID  
Sent By   Date 2022-04-14 Time   Rev Time 0.00
Received By bdolan Date 2022-04-14 Time 12:48 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-03-16 Cont ID  
Sent By   Date 2022-03-16 Time   Rev Time 0.00
Received By bdolan Date 2022-03-16 Time 09:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-04-26 Cont ID  
Sent By rmcdouga Date 2022-04-26 Time 09:39 Rev Time 0.00
Received By rmcdouga Date 2022-04-25 Time 07:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-04-19 Cont ID  
Sent By rmcphers Date 2022-04-19 Time 09:37 Rev Time 0.00
Received By rmcphers Date 2022-04-10 Time 08:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-07 Cont ID  
Sent By rmcphers Date 2022-04-07 Time 10:26 Rev Time 0.00
Received By rmcphers Date 2022-03-10 Time 05:58 Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 2 Status P Date   Cont ID  
Sent By   Date 2022-04-15 Time   Rev Time 0.00
Received By   Date 2022-04-15 Time   Sent To  
Notes
2022-04-15 11:15:08THE DUMSPER(S) SHALL BE ON WHEELS.
  
 MATT HEJAZI
 DEPT. OF PUBLIC WORKS
 [email protected]

Review Stop PW PUBLIC WORKS
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2022-03-11 Time   Rev Time 0.00
Received By   Date 2022-03-11 Time   Sent To  
Notes
2022-03-11 07:55:45NO OBJECTIONS FROM DEPARTMENT OF PUBLIC WORKS.
  
  
 MATT HEJAZI
 [email protected]
 561-822-2045

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 5 Status P Date 2022-05-06 Cont ID  
Sent By shill Date 2022-05-06 Time 17:18 Rev Time 0.00
Received By shill Date 2022-05-06 Time 17:18 Sent To  
Notes
2022-05-06 17:18:50PROVISO: ARCHITECT TO PROVIDE DIGITALLY SIGNED
 DOCUMENTS
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2022-05-04 Cont ID  
Sent By jgomez Date 2022-05-04 Time 09:19 Rev Time 0.00
Received By jgomez Date 2022-05-04 Time 09:18 Sent To  
Notes
2022-05-04 09:23:58SIGNATURE REVIEW:
  
 1- HARD COPY DRAWING A002 DOESN'T MATCH APPROVED
 DRAWING. HARD COPY DRAWING SHOWS LAST REVISION #6 DATED
 01/10/22. NEED TO UPLOAD REVISED DRAWING TO PROJECTDOX
 FOR REVIEW. JG.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date   Cont ID  
Sent By   Date 2022-04-26 Time   Rev Time 0.00
Received By   Date 2022-04-26 Time   Sent To  
Notes
2022-04-26 09:39:35SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS A001 AND A002 DO NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-04-19 Cont ID  
Sent By rmcphers Date 2022-04-19 Time 09:37 Rev Time 0.00
Received By rmcphers Date 2022-04-19 Time 09:37 Sent To  
Notes
2022-04-19 09:37:39SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS A001 AND A002 DO NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-04-07 Cont ID  
Sent By rmcphers Date 2022-04-07 Time 10:24 Rev Time 0.00
Received By rmcphers Date 2022-04-07 Time 10:24 Sent To  
Notes
2022-04-07 10:25:50SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS A001 AND A002 DO NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2022-04-11 Cont ID  
Sent By llouie Date 2022-04-11 Time   Rev Time 0.00
Received By llouie Date 2022-04-11 Time   Sent To  
Notes
2022-04-11 11:12:04ZONING APPROVED WITH THE FOLLOWING PROVISO(S):
  
 1.) ALL CONDITIONS PROVIDED IN ISPR 20-09 (ISSUED
 5/19/2021) AND ISPR 20-09A (ISSUED 4/6/2022) SHALL BE
 ADDRESSED AND SATISFIED PRIOR TO THE ISSUANCE OF THE
 CERTIFICATE OF OCCUPANCY (C.O.) FOR THE PROJECT.
  
 2.0 SEPARATE PERMIT REQUIRED FOR LANDSCAPING.
  
 *** A HOLD HAS BEEN PLACED ON THE C.O. ***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-03-21 Cont ID  
Sent By llouie Date 2022-03-21 Time   Rev Time  
Received By llouie Date 2022-03-21 Time   Sent To  
Notes
2022-03-21 08:46:34** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) APPROVAL OF ISPR 20-09A (WHICH IS CURRENTLY PENDING
 WITH THE DEVELOPMENT SERVICES DEPARTMENT-PLANNING
 DIVISION) REQUIRED PRIOR TO SIGN-OFF OF THIS PERMIT.
 PLEASE NOTE THAT ALL PERMIT PLANS ASSOCIATED WITH THIS
 PROJECT SHALL MATCH THE APPROVED PLANS UNDER ISPR
 20-09A.
  
  
  
 NOTES:
  
 * ALTHOUGH THE PLANTING PLAN HAS BEEN PROVIDED WITH
 THIS PERMIT, A SEPARATE LANDSCAPE PERMIT IS REQUIRED
 FOR THIS PROJECT.
  
 * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
 * ZONE: GC
  
 * REFERENCE: ISPR 20-09A (PIG BEACH BBQ MINOR SITE PLAN
 AMENDMENT)
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved