Plan Review Details - Permit 22030230
Plan Review Stops For Permit 22030230
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-04-29 Cont ID  
Sent By rmcdouga Date 2022-04-29 Time 08:05 Rev Time 0.00
Received By rmcdouga Date 2022-04-29 Time 08:05 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-04-09 Cont ID  
Sent By jleahy Date 2022-04-09 Time 15:31 Rev Time 0.00
Received By jleahy Date 2022-04-09 Time 15:28 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-05-06 Cont ID  
Sent By rwbrown Date 2022-05-05 Time 10:54 Rev Time 0.00
Received By rwbrown Date 2022-05-05 Time 10:54 Sent To  
Notes
2022-05-05 10:54:31 
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-03-22 Cont ID  
Sent By lcrespo Date 2022-03-22 Time 10:39 Rev Time 0.00
Received By lcrespo Date 2022-03-22 Time 10:39 Sent To  
Notes
2022-03-22 10:41:13GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-05-12 Cont ID  
Sent By pvalenti Date 2022-05-12 Time 15:59 Rev Time 0.00
Received By pvalenti Date 2022-05-09 Time 14:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-05 Cont ID  
Sent By rwbrown Date 2022-05-05 Time 11:00 Rev Time 0.00
Received By rwbrown Date 2022-04-29 Time 13:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-04-29 Cont ID  
Sent By rmcdouga Date 2022-04-29 Time 08:05 Rev Time 0.00
Received By rmcdouga Date 2022-03-21 Time 11:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-05-03 Cont ID  
Sent By lcrespo Date 2022-05-03 Time 09:51 Rev Time 0.00
Received By lcrespo Date 2022-05-03 Time 09:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-03-22 Cont ID  
Sent By lcrespo Date 2022-03-22 Time 10:11 Rev Time 0.00
Received By lcrespo Date 2022-03-22 Time 10:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-05-12 Cont ID  
Sent By pvalenti Date 2022-05-12 Time 15:58 Rev Time 0.00
Received By pvalenti Date 2022-05-12 Time 15:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-05-05 Cont ID  
Sent By rwbrown Date 2022-05-05 Time 10:59 Rev Time 0.00
Received By rwbrown Date 2022-05-05 Time 10:59 Sent To  
Notes
2022-05-05 11:00:12THE ENGINEER'S DIGITAL SIGNATURE IS SELF-CERTIFIED. THE
 FLORIDA BOARD OF PROFESSIONAL ENGINEERS REQUIRES A
 THIRD PARTY AGENCY TO CERTIFY AN ENGINEER'S DIGITAL
 SIGNATURES. ELECTRONICALLY SUBMITTED DRAWINGS ARE
 REQUIRED TO HAVE THE ARCHITECT OR ENGINEER'S DIGITAL
 SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT
 THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER
 THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT
 THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S
 ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO
 BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF
 THE SIGNATURE ARE ACCEPTABLE. FS 481 & FAC 61G1 OR FS
 471 & FAC 61G15

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-04-29 Cont ID  
Sent By rmcdouga Date 2022-04-29 Time 07:16 Rev Time 0.00
Received By rmcdouga Date 2022-04-29 Time 07:16 Sent To  
Notes
2022-04-29 07:30:19THE ENGINEER'S DIGITAL SIGNATURE IS SELF-CERTIFIED. THE
 FLORIDA BOARD OF PROFESSIONAL ENGINEERS REQUIRES A
 THIRD PARTY AGENCY TO CERTIFY AN ENGINEER'S DIGITAL
 SIGNATURES. ELECTRONICALLY SUBMITTED DRAWINGS ARE
 REQUIRED TO HAVE THE ARCHITECT OR ENGINEER'S DIGITAL
 SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT
 THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER
 THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT
 THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S
 ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO
 BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF
 THE SIGNATURE ARE ACCEPTABLE. FS 481 & FAC 61G1 OR FS
 471 & FAC 61G15

Review Stop Z ZONING
Rev No 1 Status P Date 2022-03-28 Cont ID  
Sent By vbroglia Date 2022-03-28 Time 14:52 Rev Time 0.00
Received By vbroglia Date 2022-03-28 Time 14:52 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved