Plan Review Details - Permit 22030106
Plan Review Stops For Permit 22030106
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-03-15 Cont ID  
Sent By jleahy Date 2022-03-15 Time 15:31 Rev Time 0.00
Received By jleahy Date 2022-03-15 Time 15:24 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-03-07 Cont ID  
Sent By cwalker Date 2022-03-07 Time   Rev Time  
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-03-22 Cont ID  
Sent By pvalenti Date 2022-03-22 Time 13:05 Rev Time 0.00
Received By pvalenti Date 2022-03-22 Time 09:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-15 Cont ID  
Sent By jleahy Date 2022-03-15 Time 15:32 Rev Time 0.00
Received By jleahy Date 2022-03-03 Time 12:26 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-03-22 Cont ID  
Sent By pvalenti Date 2022-03-22 Time 13:00 Rev Time 0.00
Received By pvalenti Date 2022-03-22 Time 12:54 Sent To  
Notes
2022-03-22 13:03:12PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 SIGNATURE REVIEW APPROVED BY SIGNED/SEALED PAPER
 SUBMITTALS.
 SIGNED/SEALED PAPER PLAN SHEETS NEED TO BE UPLOADED TO
 PROJECT DOX.
 SUBMITTED PAPER PLAN SHEETS ROUTED TO SIGNATURE BIN.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-03-02 Cont ID  
Sent By rmcdouga Date 2022-03-02 Time 17:45 Rev Time 0.00
Received By rmcdouga Date 2022-03-02 Time 17:45 Sent To  
Notes
2022-03-02 17:46:53THE ENGINEER DID NOT SIGN AND SEAL PAPER PLANS FA-1 AND
 FA-2.
 ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ARCHITECT OR ENGINEER'S DIGITAL SIGNATURE ON THEM.
 YOU ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND
 SEALED PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC
 PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT THE
 CORRESPONDING PAPER DRAWINGS AT THE BUILDING DEPARTMENT
 TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 481 & 61G1 OR FS 471 &
 61G15


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved