Plan Review Stops For Permit 22021127 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2022-03-02 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-03-02 |
Time |
08:33 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-03-01 |
Time |
16:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-06-24 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-06-24 |
Time |
11:27 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-06-24 |
Time |
11:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-03-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-03-09 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-03-09 |
Time |
12:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-27 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2022-06-13 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-13 |
Time |
06:25 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-13 |
Time |
06:25 |
Sent To |
|
|
Notes |
2022-06-13 06:25:58 | GAS SUB OR SEPARATE PERMIT REQUIRED. |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2022-03-10 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2022-03-10 |
Time |
10:14 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-03-10 |
Time |
10:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-27 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-25 |
Time |
07:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
P |
Date |
2022-06-24 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-06-24 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-06-10 |
Time |
10:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-03-11 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-03-11 |
Time |
10:11 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-02-25 |
Time |
13:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-06-27 |
Time |
07:56 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-06-27 |
Time |
07:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2022-06-11 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-06-11 |
Time |
10:10 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-06-11 |
Time |
10:10 |
Sent To |
|
|
Notes |
2022-06-11 10:16:06 | PROVIDE THE ENERGY CALCULATIONS FOR THE LIVING SPACE | | ABOVE THE GARAGE.FEC R101.5.1.1.2 | | | | PROVIDE THE MECHANICAL EQUIPMENT SIZING CALCULATIONS | | FOR THE NEW UPSIZED AHU IN THE EXISTING HOME AND THE | | NEW AHU FOR THE LIVING SPACE ABOVE GARAGE. FEC | | R403.7.1.2 | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2022-03-03 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-03-03 |
Time |
07:14 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-03-02 |
Time |
15:55 |
Sent To |
|
|
Notes |
2022-03-03 07:14:43 | 1ST REVIEW FBC-2020 MECHANICAL | | PERMIT-22021127 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE | | FBC M- FLORIDA MECHANICAL CODE | | FBC EC- FLORIDA ENERGY CONSERVATION | | FBC FG- FLORIDA FUEL GAS | | FBC EX- FLORIDA EXISTING BUILDING CODE | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PLEASE PROVIDE THE MECHANICAL EQUIPMENT SIZING | | CALCULATIONS. FBC RES R403.7 | | | | 2) SHEET M-3: PLEASE SHOW THE RETURN AIR BACK TO THE | | UNIT IN THE HVAC CLOSET. HOW WILL THE RETURN AIR RETURN | | FROM THE BEDROOM? IS THE DOOR AT THE HVAC CLOSET | | LOUVERED? FBC RES M1602.3 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-27 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-06-13 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-13 |
Time |
06:23 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-13 |
Time |
06:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-02-28 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-28 |
Time |
13:06 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-02-28 |
Time |
13:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2022-06-27 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-27 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-27 |
Time |
09:43 |
Sent To |
|
|
Notes |
2022-06-27 07:57:26 | MECHANICAL DIGITAL SIGNATURES APPROVED ME |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-06-13 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-13 |
Time |
06:28 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-13 |
Time |
06:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-03-02 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-03-02 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-03-02 |
Time |
08:41 |
Sent To |
|
|
Notes |
2022-03-02 08:43:45 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) DRAWINGS E-1, E-2, E-3, E-4, M-1, M-2, M-3, P-1, P-2 | | DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2022-03-10 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2022-03-10 |
Time |
10:15 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2022-03-10 |
Time |
10:15 |
Sent To |
|
|
Notes |
|
|