Plan Review Stops For Permit 22020719 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2023-04-05 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-05 |
Time |
08:28 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-05 |
Time |
08:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-06-01 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-06-01 |
Time |
08:16 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-06-01 |
Time |
08:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-03-23 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-03-23 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-03-23 |
Time |
14:58 |
Sent To |
|
|
Notes |
2022-03-23 15:10:30 | COLUMNS AND RAILING | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) PLEASE PROVIDE A FLOOR PLAN SHOWING THE LOCATION OF | | THE COLUMNS AND RAILING TO BE REPLACED FBC 107.2 | | | | 2) BUILDING PERMIT APPLICATION SAYS COLUMNS AND RAILING | | - PLEASE PROVIDE SIGNED AND SEALED RAILING DETAILS FROM | | A DESIGN PROFESSIONAL THAT MEET THE REQUIRED LOAD AND | | LIFE SAFETY REQUIREMENTS. FBC 1014 AND 1015 | | | | 3) PLEASE SHOW THE BUILDING CONSTRUCTION TYPE FBC | | CHAPTER 602.1 | | | | 4) PLEASE SHOW THE COLUMN FIRE RATINGS PER FBC 601 | | | | 5) PLEASE SHOW THE COLUMN HEIGHTS. | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2023-04-05 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2023-04-05 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2023-04-05 |
Time |
13:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-05-20 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-05-20 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-05-20 |
Time |
11:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2022-03-03 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-03-03 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-03-03 |
Time |
13:18 |
Sent To |
|
|
Notes |
2022-03-03 13:25:12 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | 1) THERE ARE NO INDICATIONS OF WHICH COLUMNS/RAILINGS | | WILL BE REPLACED. | | | | FOR THE OFFICIAL RECORD, PLEASE PROVIDE SPECIFIC | | DETAILS WITH A FLOOR PLAN/HORIZONTAL VIEW OF WHICH/WHAT | | COLUMNS/RAILINGS WILL BE REPLACED. | | | | | | | | 2) THERE ARE NO INDICATIONS OF RAILING DETAILS, RAILING | | TYPE, HIEGHT, WIDTH, MATERIAL, ETC. | | | | FOR THE OFFICIAL RECORD, PLEASE INDICATE RAILING | | DETAILS. | | | | | | 3) THERE ARE NO INDICATIONS OF LIFE SAFETY | | SUPPORT/PROTECTION SHOULD A COLUMN/RAILING BE REMOVED, | | INCLUDING FALLING DEBRIS PROTECTION. | | | | PLEASE PROVIDE SPECIFIC DETAILS OF PROPOSED LIFE SAFETY | | SUPPORT/PROTECTION OR THE REASON WHY IT IS NOT | | REQUIRED. | | | | | | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-04-07 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-04-07 |
Time |
06:25 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-04-04 |
Time |
13:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-06-15 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-06-15 |
Time |
12:08 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-05-19 |
Time |
06:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-04-15 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-04-15 |
Time |
16:33 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-03-02 |
Time |
08:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2023-04-05 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-05 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-05 |
Time |
08:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2022-06-01 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-06-01 |
Time |
08:17 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-06-01 |
Time |
08:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-02-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-14 |
Time |
09:49 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-14 |
Time |
09:47 |
Sent To |
|
|
Notes |
2022-02-14 09:50:25 | HARD COPY DRAWINGS S1 AND S2 WITH ENGINEER'S EMBOSSED | | SEAL AN ORIGINAL SIGNATURE. JG. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2023-04-06 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-04-06 |
Time |
17:51 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2023-04-06 |
Time |
17:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-06-15 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-06-15 |
Time |
12:07 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2022-06-15 |
Time |
12:07 |
Sent To |
|
|
Notes |
2022-06-15 12:08:01 | FAILED | | | | 1) REPEAT COMMENT: THE CITYPLACE RETAIL MANAGEMENT | | APPROVAL STAMP IS REQUIRED ON THE PLANS. ALTERNATIVELY, | | YOU MAY PROVIDE A LETTER FROM CITYPLACE RETAIL | | MANAGEMENT WHICH APPROVES THE SPECIFIC PLANS SUBMITTED | | AS PART OF THE PERMIT. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-04-15 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2022-04-15 |
Time |
16:15 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2022-04-15 |
Time |
16:15 |
Sent To |
|
|
Notes |
2022-04-15 16:19:46 | FAILED | | | | 1) THE CITYPLACE RETAIL MANAGEMENT APPROVAL STAMP IS | | REQUIRED ON THE PLANS. ALTERNATIVELY, YOU MAY PROVIDE A | | LETTER FROM CITYPLACE RETAIL MANAGEMENT WHICH APPROVES | | THE SPECIFIC PLANS SUBMITTED AS PART OF THE PERMIT. | | | | 2) PROVIDE AN ELEVATION DRAWING SHOWING THE SPECIFIC | | LOCATION OF THE WORK. | | | | 3) PROVIDE AN ELEVATION DRAWING SHOWING WHAT THE | | BALCONY RAILINGS WILL LOOK LIKE. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | [email protected] | | |
|
|