2022-04-26 17:02:12 | PLAN |
| REVIEW COMMENTS |
| |
| 2ND REVIEW: FBC 7TH EDITION (2020) & CITY OF W.P.B. |
| CHAPTER 1 AMENDMENTS |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| 300 BANYAN BLVD. |
| PERMIT #22020521 |
| 170 MPH, EXPOSURE "D" |
| FLOOD ZONE "X" |
| HIGH-RISE BLDG. PER FBC 403 (12 STORIES, 152'-0" TO TOP |
| OF OCCUPIED LEVEL) |
| CONSTRUCTION TYPE: IA (REDUCED TO IB FOR FIRE |
| RESISTANCE RATING OF BUILDING MATERIALS PER FBC |
| 403.2.1.1) |
| PROPOSED OCCUPANCY TYPE: (MIXED USE) B, S-2, A-3 |
| BLDG. AND GARAGE ARE FULLY SPRINKLERED |
| GARAGE IS ENCLOSED |
| |
| DENIED BY BUILDING |
| |
| THIS REVIEW IS FOR THE FOUNDATION AND THE BUILDING |
| SUPER STRUCTURE. THE FIRST REVIEW WAS FOR THE |
| FOUNDATION ONLY PER REQUEST. ADDITIONAL ITEMS WILL BE |
| REQUIRED FOR THIS REVIEW. THE PLANS FOR THE COMPLETE |
| BUILDING HAVE NOT BEEN SUBMITTED AT THIS TIME. PLEASE |
| ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THE SITE PLANS ARE MISSING DIMENSIONS, SUCH AS THE |
| DISTANCES TO THE PROPERTY LINES. PROVIDE A SITE PLAN |
| WITH DIMENSIONS. |
| |
| 2) THE FLOOR PLANS ARE MISSING DIMENSIONS. PROVIDE |
| DIMENSIONED FLOOR PLANS. THI IS NEEDED TO CHECK SUCH |
| THINGS AS FIRE LOBBY SIZE PER FBC 3007.6, SEPARATION OF |
| EXIT ACCESS STAIRWAYS FBC 403.5.1 & 1007.1, ETC. |
| |
| 3) THE DISTANCE TO THE PROPERTY LINE AT THE WEST |
| ELEVATION APPEARS TO BE RATHER TIGHT. PROVIDE |
| CALCULATIONS TO SHOWN THAT THE PERCENTAGES OF ALLOWABLE |
| OPENINGS PER STORY ON THE WEST WALLS COMPLY WITH FBC |
| 705.8.1 & TABLE 705.8. |
| |
| 4) PROVIDE A LIFE SAFETY PLAN. FBC CHAPTER 10 |
| THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING: |
| A) NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1 |
| B) CUMULATIVE OCCUPANT LOADS FBC 1004.1.1 |
| C) EXIT SEPARATION DISTANCE FBC 1015.2.1 |
| D) COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3 |
| E) EXIT ACCESS TRAVEL DISTANCE FBC 1016.3 |
| F) CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC |
| 1008.1.1 |
| G) CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED AND |
| MEANS OF EGRESS FACTOR FBC1005.3.2 |
| H) DISTRIBUTION OF EGRESS CAPACITY FBC1005.5 |
| |
| 5) PLEASE CLARIFY IF THE ATTACHED GARAGE IS DESIGNED TO |
| BE ENCLOSED OR OPEN. IF IT IS AN OPEN GARAGE PROVIDE |
| CALCULATIONS TO SHOW THAT IT COMPLIES WITH FBC 406.5.2. |
| |
| 6) SHOW COMPLIANCE. FBC 3002.4 REQUIRES ANY BUILDING |
| THAT IS MORE THAN THREE STORIES HIGH OR IN WHICH THE |
| VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL LANDING |
| AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET TO BE |
| CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER ELEVATOR |
| THAT IS OPERATIONAL FOR BUILDING OCCUPANTS AND FIRE |
| DEPARTMENT ACCESS TO ALL FLOORS. THE ELEVATOR CAR SHALL |
| BE OF A SIZE AND ARRANGEMENT TO ACCOMMODATE AN |
| AMBULANCE STRETCHER 24 INCHES BY 76 INCHES WITH NOT |
| LESS THAN 5-INCH RADIUS CORNERS, IN THE HORIZONTAL, |
| OPEN POSITION AND SHALL BE IDENTIFIED BY THE |
| INTERNATIONAL SYMBOL FOR EMERGENCY MEDICAL SERVICES |
| (STAR OF LIFE). |
| |
| 7) SHOW THAT THE FIRE SERVICE ELEVATOR LOBBY COMPLIES |
| WITH FBC 3007.6.4 LOBBY SIZE. REGARDLESS OF THE NUMBER |
| OF FIRE SERVICE ACCESS ELEVATORS SERVED BY THE SAME |
| ELEVATOR LOBBY, THE ENCLOSED FIRE SERVICE ACCESS |
| ELEVATOR LOBBY SHALL BE NOT LESS THAN 150 SQUARE FEET |
| (14 M2) IN AN AREA WITH A DIMENSION OF NOT LESS THAN 8 |
| FEET (2440 MM). SEE SHEET A6.1.2 (PG. 157) AND OTHER |
| SHEETS. |
| |
| 8) SHOW COMPLIANCE. 403.6.1 FIRE SERVICE ACCESS |
| ELEVATOR. IN BUILDINGS WITH AN OCCUPIED FLOOR MORE THAN |
| 120 FEET (36 576 MM), MEASURED FROM THE ELEVATION OF |
| STREET-LEVEL ACCESS TO THE LEVEL OF THE HIGHEST |
| OCCUPIABLE FLOOR, NO FEWER THAN TWO FIRE SERVICE ACCESS |
| ELEVATORS SHALL BE PROVIDED IN ACCORDANCE WITH SECTION |
| 3007. ALL REMAINING ELEVATORS, IF ANY, SHALL BE |
| PROVIDED WITH PHASE I AND II EMERGENCY OPERATION. EACH |
| FIRE SERVICE ACCESS ELEVATOR SHALL HAVE A CAPACITY OF |
| NOT LESS THAN 3,500 POUNDS (1588 KG). |
| |
| 9) PROVIDE A SCHEMATIC DIAGRAM OF THE FIRE SPRINKLERS. |
| FBC 107.3.5.1 |
| |
| 10) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC |
| 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE |
| BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER |
| OF RECORD. PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH |
| FL OR NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS |
| AND MAXIMUM DESIGN PRESSURES FOR EACH OF THE DIFFERENT |
| ROOFING MATERIALS, WINDOW (GLASS TYPES), STRUCTURAL |
| MULLIONS, EXTERIOR WALL VENTS AND EXTERIOR DOOR TYPES. |
| THESE ITEMS CAN BE DEFERRED IF REQUESTED, HOWEVER, THE |
| DOCUMENTS MUST BE SUBMITTED AND APPROVED BY THE |
| BUILDING DEPARTMENT BEFORE THEY CAN BE INSTALLED. |
| |
| 11) FBC AMENDMENTS 107.3.4.1 DEFERRED SUBMITTALS. FOR |
| THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| 12) SHOW COMPLIANCE WITH FBC 2304.12 FOR TERMITE |
| PROTECTION. |
| |
| 13) VERIFY THE REQUIRED VERTICAL CLEARANCE OF 98 INCHES |
| FOR THE VAN PARKING SPACE, ACCESS AISLE AND VEHICULAR |
| ROUTE SERVING IT AS REQUIRED BY FBC ACCESSIBILITY |
| SECTION 502.5. THERE HAVE BEEN ISSUES WITH EQUIPMENT OR |
| SYSTEMS INSTALLED BELOW THE REQUIRED 98" IN THESE AREAS |
| OF PARKING GARAGES. PLEASE PROVIDE NOTES ON THE |
| DRAWINGS TO HELP AVOID THIS ISSUE. |
| |
| 14 ) THE VALUATION FOR THIS BUILDING HAS BEEN |
| DETERMINED TO BE $43,968,715.77 BASED ON THE CURRENT |
| ICC BUILDING VALUATION DATA. THE FOUNDATION AND |
| SUPERSTRUCTURE PERMIT VALUATION WILL BE 80 PERCENT OF |
| THAT TOTAL OR $35,174,972.61. THE REMAINDER WILL BE |
| USED FOR THE VALUATION OF THE INTERIOR BUILD-OUT OF THE |
| BUILDING. THE FBC 109.3 BUILDING PERMIT VALUATION. FOR |
| PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| 15) SEPARATE PERMITS, REVIEWS AND FEES ARE REQUIRED FOR |
| SOME ITEMS THAT MAY HAVE BEEN INCLUDED IN THE VALUE FOR |
| THIS PROJECT. ITEMS SUCH AS FIRE ALARM, FIRE SPRINKLER, |
| LOW VOLTAGE, LANDSCAPING, IRRIGATION AND ALL ITEMS |
| OTHER THAN BUILDING, MECHANICAL, ELECTRIC AND PLUMBING. |
| WHEN APPLYING FOR THE PERMIT TO COMPLETE THE BUILDING, |
| PROVIDE A COST BREAKDOWN SO THAT WE CAN DEDUCT THESE |
| ITEMS FROM THE PERMIT VALUE SO THAT YOU WILL NOT BE |
| CHARGED TWICE FOR THE SAME ITEM. |
| |
| 16) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| CITY RE-SUBMITTAL FORM. |
| |
| ****PROVISOS**** |
| |
| FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| |
| A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO |
| INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH |
| PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND |
| ENGINEERING (IF APPLICABLE). |
| |
| COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| |
| DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE |
| FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS |
| SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF |
| RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR |
| PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, |
| STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS |
| REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW |
| AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. |
| |
| COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH |
| PRESSURES SHOWN ON SHEET S0.0.5) |
| |
| COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S0.0.5 |
| PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS OPTIONS, |
| INDICATE OPTION PROPOSED, ESPECIALLY IF NOT ALL OPTIONS |
| COMPLY WITH MINIMUM DESIGN PRESSURES. |
| |
| SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| REQUIRED FOR: |
| LIGHT POLES/SITE LIGHTING |
| FIRE ALARM |
| FIRE SPRINKLER |
| LOW VOLTAGE |
| ACCESS |
| LANDSCAPING |
| IRRIGATION |
| PARKING LOT |
| SWIMMING POOLS |
| ALL OTHER ITEMS OTHER THAN BMEP |
| |
| PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A PDF |
| VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. |
| |
| AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED PRIOR |
| TO C.O. |
| |
| SHORING/RESHORE ENGINEERING IS REQUIRED TO BE SUBMITTED |
| TO THE BUILDING DIVISION FOR REVIEW. THE ENGINEERING IS |
| TO BE SUBMITTED, REVIEWED AND ISSUED PRIOR TO CONCRETE |
| POUR. |
| |
| A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS REQUIRED |
| TO BE PROVIDED PRIOR TO INSTALLATION. |
| |
| CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| SAT-SUN |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |