Plan Review Stops For Permit 22020351 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-03-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-03-29 |
Time |
11:09 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-03-29 |
Time |
11:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-03-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-03-14 |
Time |
09:44 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-03-14 |
Time |
09:44 |
Sent To |
|
|
Notes |
2022-03-14 09:51:38 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE VALUE OF $2300.00 TO INSTALL A CHANNEL DRAIN AND | | REPLASTER THE POOL IS LOW. SUBMIT A COMPLETE SCOPE OF | | WORK WITH THE COST FOR EACH OF THE ITEMS INCLUDING | | MATERIALS, LABOR, OVERHEAD AND PROFIT. BUILDING PERMIT | | VALUATION. FOR PERMITTING PURPOSES, VALUATION OF FBC | | 109.3 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT | | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, | | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, | | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, | | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2022-05-03 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-05-03 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-05-03 |
Time |
10:53 |
Sent To |
|
|
Notes |
2022-05-03 10:54:14 | NO FINAL INSPECTION UNTIL LOAD CALCULATIONS RECIEVED |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2022-04-08 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-04-08 |
Time |
11:27 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-04-08 |
Time |
11:27 |
Sent To |
|
|
Notes |
2022-04-08 11:41:22 | FLORIDA BUILDING CODE 2020 7TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | NFPA 70 2017 EDITION | | | | JAKE LEAHY | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | PLEASE SUBMIT A LOAD CALCULATION AND RISER DIAGRAM FOR | | THE ADDITIONAL LOAD OF THE POOL HEATER. 215.5 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2022-03-31 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-03-31 |
Time |
13:46 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-03-31 |
Time |
13:46 |
Sent To |
|
|
Notes |
2022-03-31 13:53:34 | ELECTRIC REVIEW FAILED | | 1) PREVIOUS COMMENTS NOT ADDRESSED | | 2) CONTRACTOR WILL EITHER REQUIRE AN ELECTRICAL | | SUBPERMIT OR A SEPERATE ELECTRICAL PERMIT | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. | | | | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE 2020 7TH ED. | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | 7TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | 7TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | V/R, | | | | MICHAEL PETERSON | | ELECTRICAL PLANS EXAMINER | | [email protected] | | 561-805-6746 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2022-03-25 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-03-15 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-03-15 |
Time |
14:29 |
Sent To |
|
|
Notes |
2022-03-15 14:31:09 | FLORIDA BUILDING CODE 2020 7TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | NFPA 70 2017 EDITION | | | | JAKE LEAHY | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | PLEASE SUBMIT A LOAD CALCULATION AND RISER DIAGRAM FOR | | THE ADDITIONAL LOAD OF THE POOL HEATER. 215.5 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-05-03 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-05-03 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-04-22 |
Time |
07:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-03-31 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-03-31 |
Time |
13:53 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-03-17 |
Time |
06:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-03-15 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-03-15 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-03-04 |
Time |
07:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-03-18 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-03-18 |
Time |
08:12 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-03-18 |
Time |
07:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2022-03-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-03-07 |
Time |
10:48 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-03-07 |
Time |
10:27 |
Sent To |
|
|
Notes |
2022-03-07 10:53:15 | 1ST REVIEW FBC-2020 RES. GAS | | PERMIT- 22020351 | | 3/7/2022 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION | | 2020 | | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION | | 2020 | | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE $2300.00 PERMIT VALUE APPEARS LOW FOR THE SCOPE | | OF THE WORK. PLEASE PROVIDE AN ITEMIZED COST BREAK DOWN | | THAT INCLUDES LABOR, MATERIALS, AND EQUIPMENT INCLUDING | | THE COST OF THE HEAT PUMP AND THE LABOR TO INSTALL IT- | | SEC. 109.3 WPB. | | | | 2) PROVIDE AN ITEMIZED SCOPE OF WORK OUTLINE FOR | | BUILDING AND MEP. CLARIFY IF THE NEW HEAT PUMP IS A | | REPLACEMENT OR NEW INSTALLATION AND INDICATE WHAT | | PLUMBING AND ELECTRICAL WORK IS INVOLVED WITH THE | | INSTALLATION- SEC. 107.2.1 WPB. PLEASE NOTE THAT AN | | ELECTRICAL PERMIT OR SUB-PERMIT MAY BE REQUIRED. | | | | 3) PLEASE PROVIDE A COMPLETE SUBMITTAL FOR THE CHANNEL | | DRAIN THAT INCLUDES THE MISSING INSTALLATION | | INSTRUCTIONS- SEC. 4501.6.6 FBC RES. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2022-03-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-03-14 |
Time |
10:03 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-03-14 |
Time |
10:03 |
Sent To |
|
|
Notes |
2022-03-14 10:04:07 | NO ENGINEERED DRAWINGS WERE SUBMITTED. |
|
|