Plan Review Details - Permit 22020302
Plan Review Stops For Permit 22020302
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-05-10 Cont ID  
Sent By rmcdouga Date 2022-05-10 Time 17:09 Rev Time 0.00
Received By rmcdouga Date 2022-05-10 Time 17:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-06-02 Cont ID  
Sent By mpeterso Date 2022-06-02 Time 13:40 Rev Time 0.00
Received By mpeterso Date 2022-06-02 Time 13:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-04-18 Cont ID  
Sent By mpeterso Date 2022-04-18 Time 15:43 Rev Time 0.00
Received By mpeterso Date 2022-04-18 Time 15:43 Sent To  
Notes
2022-04-18 15:46:01ELECTRIC REVIEW FAILED
 1) PLEASE PROVIDE A LOAD CACULATION FOR UPSTREAM PANELS
 NEC 215.5
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-03-30 Cont ID  
Sent By lcrespo Date 2022-03-30 Time 10:47 Rev Time 0.00
Received By lcrespo Date 2022-03-30 Time 10:47 Sent To  
Notes
2022-03-30 10:47:46GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENT TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-06-02 Cont ID  
Sent By mpeterso Date 2022-06-02 Time 13:42 Rev Time 0.00
Received By mpeterso Date 2022-05-13 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-05-10 Cont ID  
Sent By rmcdouga Date 2022-05-10 Time 17:09 Rev Time 0.00
Received By rmcdouga Date 2022-03-25 Time 09:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-03-30 Cont ID  
Sent By lcrespo Date 2022-03-30 Time 10:46 Rev Time 0.00
Received By lcrespo Date 2022-03-30 Time 10:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-06-02 Cont ID  
Sent By mpeterso Date 2022-06-02 Time 13:42 Rev Time 0.00
Received By mpeterso Date 2022-06-02 Time 13:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-05-10 Cont ID  
Sent By rmcdouga Date 2022-05-10 Time 17:09 Rev Time 0.00
Received By rmcdouga Date 2022-05-10 Time 17:09 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-04-05 Cont ID  
Sent By vbroglia Date 2022-04-05 Time 15:37 Rev Time 0.00
Received By vbroglia Date 2022-04-05 Time 15:37 Sent To  
Notes
***NONE***