Plan Review Stops For Permit 22020251 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
9 |
Status |
P |
Date |
2023-07-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-14 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-14 |
Time |
14:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
F |
Date |
2023-07-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-07 |
Time |
18:18 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-07 |
Time |
15:50 |
Sent To |
|
|
Notes |
2023-07-07 18:19:12 | ROOFING BUILDING REVIEW COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22020251 | | 201 DYER RD (TERRACE) | | | | PREVIOUS COMMENT FROM PREVIOUS PLAN REVIEWER: | | 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT | | APPROVAL FL16709-R10 SELECTED OPTION FOR SYSTEM NO W-4; | | EXPOSURE (C); ENCLOSURE (ENCLOSED); ROOF HEIGHT (H<15); | | ULTIMATE WIND SPEED (170), IS NOT CORRECT. THE CORRECT | | EXPOSURE FOR THE LISTED ADDRESS IS EXPOSURE D. PLEASE | | SELECT THE CORRECT OPTIONS. PRODUCT APPROVAL | | FL16709-R10 WILL NOT SATISFY EXPOSURE CATEGORY D | | ENCLOSED AREAS WITHOUT USING INSULATION. | | | | RESPONSE: | | ENGINEERING CALCULATIONS SUBMITTED: | | A)ACCORDING TO SEC. R301.2.1.4 FBC-RESIDENTIAL, THIS | | BUILDING IS LOCATED IN EXPOSURE "D" NOT "C". ENGINEER | | TO REVISE CALCULATIONS AS REQUIRED. (REPEAT COMMENT | | FROM PREVIOUS PLAN REVIEWER). | | | | B)PROVIDE ROOF SKETCH SHOWING THE DIMENSIONS FOR EACH | | NEW ROOF ZONE. | | FIGURE R301.2(7)FBC-RESIDENTIAL. SEC. 107.2.1.2 CITY | | AMENDMENTS. | | | | C)ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE | | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY | | FBPE. | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. | | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. | | | | 2-DESIGNER OF RECORD FOR MASTER PERMIT NEEDS TO REVIEW | | AND APPROVE IN WRITING (NOT SIGNING AND SEALING) ALL | | PRODUCT APPROVALS AS REQUIRED BY SEC. 107.3.4.1 CITY | | AMENDMENTS. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
F |
Date |
2022-09-15 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-09-15 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-09-15 |
Time |
14:24 |
Sent To |
|
|
Notes |
2022-09-15 14:37:05 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT | | APPROVAL FL16709-R10 SELECTED OPTION FOR SYSTEM NO W-4; | | EXPOSURE (C); ENCLOSURE (ENCLOSED); ROOF HEIGHT (H<15); | | ULTIMATE WIND SPEED (170), IS NOT CORRECT. THE CORRECT | | EXPOSURE FOR THE LISTED ADDRESS IS EXPOSURE D. PLEASE | | SELECT THE CORRECT OPTIONS. PRODUCT APPROVAL | | FL16709-R10 WILL NOT SATISFY EXPOSURE CATEGORY D | | ENCLOSED AREAS WITHOUT USING INSULATION. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2022-08-24 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-08-24 |
Time |
09:46 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-08-24 |
Time |
07:39 |
Sent To |
|
|
Notes |
2022-08-24 09:46:32 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT | | APPROVAL FL16709-R10 SELECTED OPTION FOR SYSTEM NO W-5 | | EXPOSURE (D); ENCLOSURE (ENCLOSED); ROOF HEIGHT (15 H < | | 20); ULTIMATE WIND SPEED (180). ZONE 3 IS MARKED ?N/A? | | WHICH INDICATES SYSTEM IS ?NOT APPLICABLE? TO ZONE1 | | PRIME DESIGN PRESSURE REQUIREMENTS AND CANNOT BE USED. | | PLEASE PROVIDE 2020 CODE VERSION PRODUCT APPROVAL/NOA | | THAT MEETS OR EXCEEDS DESIGN PRESSURE REQUIREMENTS FOR | | EXPOSURE D AREAS. SIGNED AND SEALED NAILING | | CALCULATIONS MAY BE REQUIRED. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2022-08-01 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-08-01 |
Time |
13:28 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-08-01 |
Time |
07:56 |
Sent To |
|
|
Notes |
2022-08-01 13:28:32 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | 1. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA | | NO.: 18-0502.03, MIAMI-DADE COUNTY NOA NO.: 19-0814.02, | | MIAMI-DADE COUNTY NOA NO.: 20-0714.01, MIAMI-DADE | | COUNTY NOA NO.: 22-0411.02 & PRODUCT APPROVAL FL5374-R6 | | SHALL BE SUBMITTED TO THE REGISTERED DESIGN | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A | | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | BUILDING OFFICIAL. ALL APPLICABLE DETAILS AND | | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT | | APPROVAL DRAWINGS. ALL SUBMITTED PRODUCT | | APPROVALS/NOA?S MUST BE SIGNED BY THE | | ARCHITECT/ENGINEER AND THEN UPLOADED INTO YOUR FILE | | BEFORE PERMIT APPLICATION CAN BE APPROVED. FIFTH | | REQUEST. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-07-26 |
Time |
11:55 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-07-26 |
Time |
08:09 |
Sent To |
|
|
Notes |
2022-07-26 11:55:37 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3 FLORIDA STATE PRODUCT APPROVAL | | FL5374-R6 IS INCOMPLETE, PROVIDE THE FOLLOWING | | ADDITIONAL INFORMATION: COVER SHEET | | (WWW.FLORIDABUILDING.ORG, THIS WILL INCLUDE THE CODE | | VERSION, PRODUCT APPROVAL NUMBER, STATUS, GENERAL | | INFORMATION ABOUT THE PRODUCT). | | 2. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA | | NO.: 18-0502.03, MIAMI-DADE COUNTY NOA NO.: 19-0814.02, | | MIAMI-DADE COUNTY NOA NO.: 20-0714.01, MIAMI-DADE | | COUNTY NOA NO.: 22-0411.02 & PRODUCT APPROVAL FL5374-R6 | | SHALL BE SUBMITTED TO THE REGISTERED DESIGN | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A | | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | BUILDING OFFICIAL. ALL APPLICABLE DETAILS AND | | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT | | APPROVAL DRAWINGS. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2022-03-22 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-03-22 |
Time |
14:04 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-03-22 |
Time |
08:43 |
Sent To |
|
|
Notes |
2022-03-22 14:05:00 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected]. | | | | 1. FBC B 107.2.1. PLEASE PROVIDE ENGINEER'S SIGNED AND | | SEALED FASTENER SPACING DETAIL WITH CALCULATIONS FOR | | PERIMETERS AND CORNERS AS PER PRODUCT APPROVAL | | LIMITATIONS #7. PLEASE NOTE THIS PROJECT IS LOCATED IN | | AN EXPOSURE D CATEGORY AREA. SECOND REQUEST. | | 2. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA | | NO.:19-0311.04 SHALL BE SUBMITTED TO THE REGISTERED | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL | | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL | | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | BUILDING OFFICIAL. ALL APPLICABLE DETAILS AND | | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT | | APPROVAL DRAWINGS. THIRD REQUEST. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-02-24 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-02-24 |
Time |
11:11 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-02-24 |
Time |
07:46 |
Sent To |
|
|
Notes |
2022-02-24 11:12:24 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected]. | | | | 1. FBC B 107.2.1. PLEASE PROVIDE ENGINEER'S SIGNED AND | | SEALED FASTENER SPACING DETAIL WITH CALCULATIONS FOR | | PERIMETERS AND CORNERS AS PER PRODUCT APPROVAL | | LIMITATIONS #7. PLEASE NOTE THIS PROJECT IS LOCATED IN | | AN EXPOSURE D CATEGORY AREA. | | 2. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA | | NO.:19-0311.04 SHALL BE SUBMITTED TO THE REGISTERED | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL | | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL | | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | BUILDING OFFICIAL. ALL APPLICABLE DETAILS AND | | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT | | APPROVAL DRAWINGS. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-02-08 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-02-08 |
Time |
08:31 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-02-08 |
Time |
07:23 |
Sent To |
|
|
Notes |
2022-02-08 08:32:04 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected] AND REQUEST | | THAT IT BE CONVERTED TO PROJECTDOX. | | | | 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT | | APPROVALS/NOA'S FOR THE PROPOSED FLAT ROOF SYSTEM TO BE | | USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND | | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL | | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY | | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS | | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT | | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. | | 2. FBC B 107.3.4.1. SUBMIT MISSING PRODUCT APPROVAL/NOA | | FOR THE PROPOSED FLAT ROOF SYSTEM TO BE USED SHALL BE | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | OFFICIAL. ALL APPLICABLE DETAILS AND ATTACHMENTS MUST | | BE CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2023-07-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-14 |
Time |
14:26 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-14 |
Time |
14:10 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2023-07-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-07 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-07 |
Time |
15:50 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2022-09-16 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-09-16 |
Time |
09:34 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-09-15 |
Time |
07:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2022-08-24 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-08-24 |
Time |
09:47 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-08-15 |
Time |
15:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2022-08-01 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-08-01 |
Time |
13:28 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-07-26 |
Time |
16:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-07-26 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-07-26 |
Time |
11:55 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-07-19 |
Time |
08:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-03-22 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-03-22 |
Time |
14:05 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-03-20 |
Time |
09:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-02-24 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-02-24 |
Time |
11:12 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-02-14 |
Time |
06:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-02-08 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2022-02-08 |
Time |
08:32 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2022-02-07 |
Time |
06:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2023-07-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-14 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-14 |
Time |
14:10 |
Sent To |
|
|
Notes |
2023-07-14 14:25:59 | ENGINEER CALCULATIONS WITH ENGINEER'S WET SIGNATURE. | | JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2023-07-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2023-07-07 |
Time |
18:20 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2023-07-07 |
Time |
18:19 |
Sent To |
|
|
Notes |
2023-07-07 18:21:53 | SIGNATURE REVIEW COMMENTS: | | | | ENGINEERING CALCULATIONS SUBMITTED: | | | | 1-ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE | | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY | | FBPE. | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. | | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|