Plan Review Stops For Permit 22020132 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2022-03-02 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-03-02 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-03-02 |
Time |
11:03 |
Sent To |
|
|
Notes |
2022-03-02 11:04:23 | PARCEL GIVEN THE ADDRESS OF 575 LILAC CT, UPDATED | | PERMITS DOCS |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2022-02-22 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-02-22 |
Time |
16:41 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-02-22 |
Time |
16:40 |
Sent To |
|
|
Notes |
2022-02-22 16:41:10 | AN ADDRESS NEEDS TO BE ESTABLISHED FOR THIS PROJECT. | | PLEASE PROVIDE A SURVEY AND A BLOCK AERIAL MAP SHOWING | | WHERE THE LOT IS LOCATED ON THE BLOCK. PLEASE EMAIL | | [email protected] OR CALL 561-805-6659. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2022-07-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-07-01 |
Time |
15:52 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-07-01 |
Time |
15:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2022-06-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-16 |
Time |
16:59 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-06-16 |
Time |
16:59 |
Sent To |
|
|
Notes |
2022-06-16 17:00:22 | NEW SINGLE FAMILY RESIDENCE (R3) THIRD BUILDING REVIEW | | COMMENTS | | CODE: BC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22020132 | | | | NOTE: | | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO | | MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER | | THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID | | CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR | | TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME | | OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT | | ISSUANCE. | | | | ***IMPORTANT*** | | ENERGY CALCULATIONS NEED TO BE SUBMITTED AND CERTIFIED | | BY THE OWNER OR AUTHORIZED AGENT BEFORE ISSUING THE | | PERMIT. | | | | 1- OK. | | 2- OK. | | 3- OK. | | | | ORIGINAL COMMENT: | | 4-PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. | | R101.5 BC-ENERGY CONSERVATION. | | NOTE: PLEASE MAKE SURE FORM IS PROPERLY SIGNED BY ALL | | REQUIRED PARTIES AND IS COORDINATED WITH PLANS TO AVOID | | CONFLICTS/DELAYS. | | | | RESPONSE: | | A)REPEAT COMMENT: ENERGY CALCULATIONS FORM R405-2020 IS | | REQUIRED TO BE CERTIFIED AT THE BOTTOM BY THE OWNER, | | THE OWNER'S ARCHITECT OR OTHER AUTHORIZED AGENT LEGALLY | | DESIGNED BY THE OWNER PRIOR TO RECEIVE THE PERMIT AS | | REQUIRED BY SEC. R103.1.1.2 FBC-ENERGY CONSERVATION. | | | | B)REPEAT COMMENT. BUILDER TO SIGN AND COMPLETE THE | | ENERGY PERFORMANCE LEVEL (EL) DISPLAY CARD. SEC. | | R405.4.3 FBC- ENERGY CONSERVATION. | | | | ORIGINAL COMMENT: | | 5- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY AFC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)SINGLE HUNG WINDOWS. | | B)ENTRY DOOR. | | C)GREAT ROOM SWING DOOR. | | D)ROOF SHINGLES. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. CONTRACTOR TO RESPOND IF | | SUBMITTING LATER AS A DEFERRED SUBMITTAL OR IF | | SUBMITTING THEM AT RESUBMITS. | | | | 6- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | ORIGINAL COMMENT: | | 7- DRAINAGE PLAN DRAWING C-1: REVISE PROPOSED DRAINAGE | | AT THE REAR AND RIGHT HAND SIDE OF THE PROPERTY. | | SURFACE DRAINAGE CAN NOT BE DIVERTED TO ADJACENT | | PROPERTIES. DRAINAGE WATER TO BE KEPT WITHIN THE LOT OR | | DIVERTED TOWARDS THE STREET. R401.3 FBC-RESIDENTIAL. | | SEC. 107.2.5 CITY AMENDMENTS AND SEC. 110.9 CITY | | AMENDMENTS. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. DRAINAGE PLAN WAS NOT | | REVISED. CONTRACTOR TO RESPOND IF SUBMITTING LATER AS A | | DEFERRED SUBMITTAL OR IF SUBMITTING REVISED DRAINAGE | | PLAN AT RESUBMITS. | | | | 8- OK. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF THE | | REVISION MADE WILL HELP TO EXPEDITE THE REVIEW PROCESS. | | THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-05-17 |
Time |
11:25 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-05-17 |
Time |
10:19 |
Sent To |
|
|
Notes |
2022-05-17 11:26:42 | NEW SINGLE FAMILY RESIDENCE (R3) SECOND BUILDING REVIEW | | COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22020132 | | | | NOTE: | | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO | | MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER | | THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID | | CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR | | TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME | | OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT | | ISSUANCE. | | | | ***IMPORTANT*** | | ENERGY CALCULATIONS NEED TO BE SUBMITTED AND CERTIFIED | | BY THE OWNER OR AUTHORIZED AGENT BEFORE ISSUING THE | | PERMIT. | | | | ORIGINAL COMMENT: | | 1- ROOF SHEATHING NAILING SPACING SPECIFIED ON SHEET | | S-2 DOESN'T COMPLY WITH TABLE R803.2.3.1 | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | RESPONSE: | | REVISED ROOF SHEATHING NAILING SPECIFICATIONS IS | | MISSING SPECIFICATIONS FOR ROOF ZONE 2N. | | | | 2- OK. | | 3- OK. | | | | ORIGINAL COMMENT: | | 4-PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. | | R101.5 FBC-ENERGY CONSERVATION. | | NOTE: PLEASE MAKE SURE FORM IS PROPERLY SIGNED BY ALL | | REQUIRED PARTIES AND IS COORDINATED WITH PLANS TO AVOID | | CONFLICTS/DELAYS. | | | | RESPONSE: | | A)ENERGY CALCULATIONS FORM R405-2020 IS REQUIRED TO BE | | CERTIFIED AT THE BOTTOM BY THE OWNER, THE OWNER'S | | ARCHITECT OR OTHER AUTHORIZED AGENT LEGALLY DESIGNED BY | | THE OWNER PRIOR TO RECEIVE THE PERMIT AS REQUIRED BY | | SEC. R103.1.1.2 FBC-ENERGY CONSERVATION. | | | | B)BUILDER TO SIGN AND COMPLETE THE ENERGY PERFORMANCE | | LEVEL (EPL) DISPLAY CARD. SEC. R405.4.3 FBC- ENERGY | | CONSERVATION. | | | | ORIGINAL COMMENT: | | 5- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)SINGLE HUNG WINDOWS. | | B)ENTRY DOOR. | | C)GREAT ROOM SWING DOOR. | | D)ROOF SHINGLES. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. CONTRACTOR TO RESPOND IF | | SUBMITTING LATER AS A DEFERRED SUBMITTAL OR IF | | SUBMITTING THEM AT RESUBMITAL. | | | | 6- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | ORIGINAL COMMENT: | | 7- DRAINAGE PLAN DRAWING C-1: REVISE PROPOSED DRAINAGE | | AT THE REAR AND RIGHT HAND SIDE OF THE PROPERTY. | | SURFACE DRAINAGE CAN NOT BE DIVERTED TO ADJACENT | | PROPERTIES. DRAINAGE WATER TO BE KEPT WITHIN THE LOT OR | | DIVERTED TOWARDS THE STREET. R401.3 FBC-RESIDENTIAL. | | SEC. 107.2.5 CITY AMENDMENTS AND SEC. 110.9 CITY | | AMENDMENTS. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. DRAINAGE PLAN WAS NOT | | REVISED. CONTRACTOR TO RESPOND IF SUBMITTING LATER AS A | | DEFERRED SUBMITAL OR IF SUBMITTING REVISED DRAINAGE | | PLAN AT RESUBMITAL. | | | | 8- OK. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF THE | | REVISION MADE WILL HELP TO EXPEDITE THE REVIEW PROCESS. | | THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-04-14 |
Time |
13:49 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-13 |
Time |
19:11 |
Sent To |
|
|
Notes |
2022-04-14 13:52:08 | NEW SINGLE FAMILY RESIDENCE (R3) BUILDING REVIEW | | COMMENTS | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #22020132 | | | | NOTE: | | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO | | MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER | | THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID | | CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR | | TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME | | OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT | | ISSUANCE. | | | | ***IMPORTANT*** | | ENERGY CALCULATIONS NEED TO BE SUBMITTED AND CERTIFIED | | BY THE OWNER OR AUTHORIZED AGENT BEFORE ISSUING THE | | PERMIT. | | | | 1- ROOF SHEATHING NAILING SPACING SPECIFIED ON SHEET | | S-2 DOESN'T COMPLY WITH TABLE R803.2.3.1 | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | 2- GABLE END UPLIFT DIAGRAM SHOWN ON SHEET S-2 DOESN'T | | MATCH ROOF ZONES ZONES SPECIFIED ON FIGURE R301.2(7) | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | 3- PLANS DON'T PROVIDE SPECIFICATIONS SHOWING HOW | | COMPLYING WITH THE NEW 2020 CODE REQUIREMENT FOR | | ROOFING UNDERLAYMENT SEC. R905.1.1.1 FBC-RESIDENTIAL. | | NOTE: CLEARLY SPECIFY WHICH METHOD OF SEC. R905.1.1.1 | | FBC-RESIDENTIAL IS GOING TO BE USED. AND PROVIDE | | PRODUCT APPROVAL AS REQUIRED BY F.A.C. 61G20-3.001 | | | | 4-PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. | | R101.5 FBC-ENERGY CONSERVATION. | | NOTE: PLEASE MAKE SURE FORM IS PROPERLY SIGNED BY ALL | | REQUIRED PARTIES AND IS COORDINATED WITH PLANS TO AVOID | | CONFLICTS/DELAYS. | | | | 5- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)SINGLE HUNG WINDOWS. | | B)ENTRY DOOR. | | C)GREAT ROOM SWING DOOR. | | D)ROOF SHINGLES. | | | | 6- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | 7- DRAINAGE PLAN DRAWING C-1: REVISE PROPOSED DRAINAGE | | AT THE REAR AND RIGHT HAND SIDE OF THE PROPERTY. | | SURFACE DRAINAGE CAN NOT BE DIVERTED TO ADJACENT | | PROPERTIES. DRAINAGE WATER TO BE KEPT WITHIN THE LOT OR | | DIVERTED TOWARDS THE STREET. R401.3 FBC-RESIDENTIAL. | | SEC. 107.2.5 CITY AMENDMENTS AND SEC. 110.9 CITY | | AMENDMENTS. | | | | 8- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW. | | VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S | | OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS | | REQUIRED BY SEC. 109.3 CITY AMENDMENTS. VALUATION WAS | | UPDATED TO $154,371.00. THE PERMIT FEE BALANCE IS | | $2884.68. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF THE | | REVISION MADE WILL HELP TO EXPEDITE THE REVIEW PROCESS. | | THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-05-09 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-05-09 |
Time |
19:02 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-05-06 |
Time |
21:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-03-14 |
Time |
21:21 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-03-14 |
Time |
20:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-07-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-07-01 |
Time |
15:52 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-06-23 |
Time |
15:25 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-06-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-16 |
Time |
17:03 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-05-26 |
Time |
08:06 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-05-17 |
Time |
13:11 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-18 |
Time |
15:53 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-04-14 |
Time |
14:43 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-22 |
Time |
06:16 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-07-12 |
Time |
16:57 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-07-01 |
Time |
15:57 |
Sent To |
|
|
Notes |
2022-07-12 16:01:58 | RECEIPT MU-2022-030740 - $9968.61 PAID | 2022-07-01 15:57:19 | 7/1/22 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-04-14 |
Time |
14:42 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-14 |
Time |
14:42 |
Sent To |
|
|
Notes |
2022-04-14 14:42:53 | IMPACT FEES | | PLANS NEED TO BE REVIEWED BY PALM BEACH COUNTY FOR | | IMPACT FEE ASSESSMENT. | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | APPROVAL AND FEE PAYMENT (IF ANY), PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2022-05-03 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-05-03 |
Time |
07:53 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-05-03 |
Time |
07:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2022-03-07 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-03-07 |
Time |
08:56 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-03-07 |
Time |
08:56 |
Sent To |
|
|
Notes |
2022-03-07 08:56:26 | 1ST REVIEW FBC-2020 MECHANICAL | | PERMIT-22020132 | | | | CODES IN EFFECT: | | | | FBC B- FLORIDA BUILDING CODE | | FBC M- FLORIDA MECHANICAL CODE | | FBC EC- FLORIDA ENERGY CONSERVATION | | FBC FG- FLORIDA FUEL GAS | | FBC EX- FLORIDA EXISTING BUILDING CODE | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) PLEASE PROVIDE THE ENERGY CALCULATIONS. FBC RES | | R401.2 | | | | 2) PLEASE PROVIDE THE MECHANICAL EQUIPMENT SIZING | | CALCULATIONS. FBC RES R403.7.1 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2022-04-26 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-04-26 |
Time |
15:00 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-04-26 |
Time |
15:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-02-24 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-24 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-02-24 |
Time |
11:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
1 |
Status |
P |
Date |
2022-07-05 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2022-07-05 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2022-07-05 |
Time |
10:52 |
Sent To |
|
|
Notes |
2022-07-05 10:53:30 | APPROVED CREDENTIALS FOR PRIVATE PROVIDER INSPECTIONS. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
4 |
Status |
P |
Date |
2022-07-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-07-01 |
Time |
15:50 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-07-01 |
Time |
15:50 |
Sent To |
|
|
Notes |
2022-07-01 15:52:01 | 1- SHINGLES NOA 20-0527.05. | | 2- HIP AND RIDGE NOA 21-0112.01 |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
F |
Date |
2022-06-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-16 |
Time |
17:02 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-06-16 |
Time |
17:02 |
Sent To |
|
|
Notes |
2022-06-16 17:03:19 | ROOFING REVIEW: | | | | 1- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)ROOF SHINGLES. | | | | 2- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-05-17 |
Time |
12:52 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-05-13 |
Time |
06:46 |
Sent To |
|
|
Notes |
2022-05-17 12:53:17 | ROOFING REVIEW: | | | | 1- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)ROOF SHINGLES. | | | | 2- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-04-14 |
Time |
14:19 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-14 |
Time |
14:19 |
Sent To |
|
|
Notes |
2022-04-14 14:20:01 | ROOFING REVIEW: | | | | 1- PRODUCT APPROVALS | | PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001 | | FOR: | | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED | | SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW | | PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL | | PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY | | DESIGNER OF RECORD PRIOR TO SUBMITTAL): | | | | A)SINGLE HUNG WINDOWS. | | B)ENTRY DOOR. | | C)GREAT ROOM SWING DOOR. | | D)ROOF SHINGLES. | | | | 2- DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING | | (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS | | REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS | | NOTE: COORDINATE PRODUCT APPROVAL SUBMITTAL AFFIDAVIT | | ON SHEET A-1 WITH PRODUCT APPROVALS SUBMITTED TO AVOID | | CONFLICTS/DELAYS. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2022-07-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-07-01 |
Time |
15:50 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-07-01 |
Time |
15:50 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2022-06-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-06-16 |
Time |
17:01 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-06-16 |
Time |
17:00 |
Sent To |
|
|
Notes |
2022-06-16 17:02:16 | SIGNATURE REVIEW: | | | | 1- IT LOOKS LIKE REVISED DRAWING C-1 HAS A COPY OF THE | | DIGITAL SIGNATURE. NEED ORIGINAL DIGITAL SIGNATURE. | | CHAPTER 471 F.S. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-05-17 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-05-17 |
Time |
12:53 |
Sent To |
|
|
Notes |
2022-05-17 13:10:59 | SIGNATURE REVIEW: | | 1- DRAWING C-1 UPLOADED TO PROJECTDOX ON 04/16/22 HAS A | | COPY OF A DIGITAL SIGNATURE. ALL DRAWINGS NEED TO HAVE | | ORIGINAL SEAL/SIGNATURE AS REQUIRED BY CHAPTER 471 F.S. | | WHEN SUBMITTING DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS. | | | | NOTE: SUBMIT DRAWINGS ELECTRONICALLY WITH DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ORIGINAL SEAL AND | | SIGNATURE. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-04-14 |
Time |
14:41 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-04-14 |
Time |
14:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-04-21 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-04-21 |
Time |
14:01 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-04-21 |
Time |
14:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-02-28 |
|
|
Cont ID |
|
Sent By |
ajvann |
Date |
2022-02-28 |
Time |
16:35 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-02-28 |
Time |
16:27 |
Sent To |
|
|
Notes |
2022-02-28 16:35:32 | 02/28/22 FAILED - ADDRESS SPECIFIED IN THE SITE PLAN IS | | AN ADDRESS DIFFERENT THAN FOR THE LOT IDENTIFIED FOR | | THE PROPOSED ONE STORY HOME. | | | | ALEXANDER FOWLKES | | [email protected] | | 561-822-1431 | | | | |
|
|