Plan Review Stops For Permit 22011184 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2022-05-31 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2022-05-31 |
Time |
08:56 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2022-05-31 |
Time |
08:56 |
Sent To |
|
|
Notes |
2022-05-31 08:57:03 | ADDRESS APPROPRIATE FOR PROJECT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-08-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-08-19 |
Time |
11:15 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-08-19 |
Time |
11:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
10:17 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-22 |
Time |
10:17 |
Sent To |
|
|
Notes |
2022-07-22 10:18:29 | NEW SFR | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) NEED TO SHOW THE FLOW OF STORM WATER AWAY FROM THE | | BUILDING - AWAY FROM THE NEIGHBORING PROPERTY - PLEASE | | PROVIDE A SITE PLAN SHOWING THE FOLLOWING - FBC WPB | | 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED | | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY | | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF | | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE, | | DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES | | AND THE PROPOSED FINISHED GRADES, DEPICTING THE | | PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD | | AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT | | SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND | | INCLUDED ON A BOUNDARY LINE SURVEY. (PLEASE PROVIDE CUT | | SECTIONS FOR ANY PROPOSED WATER RETAINING SWALES) | | | | 2) SURVEY PROVIDED NEEDS TO BE ELECTRONICALLY SIGNED BY | | THE SURVEYOR - TO BE USED IN PROJECTDOX. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-12 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-12 |
Time |
10:26 |
Sent To |
|
|
Notes |
2022-07-12 11:28:03 | NEW SFR | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) PLEASE PROVIDE A SURVEY/SITE PLAN SHOWING THE | | FOLLOWING INFORMATION 107.2.5 SITE PLAN. THE | | CONSTRUCTION DOCUMENTS SUBMITTED WITH THE APPLICATION | | FOR PERMIT SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING | | TO SCALE THE SIZE AND LOCATION OF NEW CONSTRUCTION AND | | EXISTING STRUCTURES ON THE SITE, DISTANCES FROM LOT | | LINES, THE ESTABLISHED STREET GRADES AND THE PROPOSED | | FINISHED GRADES, DEPICTING THE PROPOSED LOT DRAINAGE | | AND, AS APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND | | DESIGN FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN | | ACCORDANCE WITH AN ACCURATE AND INCLUDED ON A BOUNDARY | | LINE SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY | | PROPOSED WATER RETAINING SWALES) | | | | 2) PLEASE PROVIDE A SURVEY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2022-06-22 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-06-22 |
Time |
10:20 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-06-22 |
Time |
10:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
N |
Date |
2022-08-29 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-08-29 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-08-29 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-08-12 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-08-12 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-08-12 |
Time |
|
Sent To |
|
|
Notes |
2022-08-12 12:55:49 | A SEPARATE DRIVEWAY PERMIT IS REQUIRED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-08-30 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-08-30 |
Time |
08:37 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-08-25 |
Time |
07:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-08-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-08-19 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-08-10 |
Time |
06:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-07-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-14 |
Time |
15:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-12 |
Time |
11:30 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-05-31 |
Time |
08:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2022-08-29 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-08-29 |
Time |
08:56 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-08-24 |
Time |
06:52 |
Sent To |
|
|
Notes |
2022-08-26 16:51:21 | RECEIPT MU-2022-039275 - $2291.74 PAID | 2022-08-24 06:53:11 | 8/24/22 EMAILED IMPACT FOR REVIEW-AO |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-12 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-12 |
Time |
11:28 |
Sent To |
|
|
Notes |
2022-07-12 11:28:50 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2022-06-10 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-06-10 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-06-10 |
Time |
16:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-06-06 |
|
|
Cont ID |
|
Sent By |
rwbrown |
Date |
2022-06-06 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
rwbrown |
Date |
2022-06-06 |
Time |
12:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2022-07-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-12 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-12 |
Time |
11:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2022-08-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-08-19 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-08-19 |
Time |
11:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
10:18 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-07-22 |
Time |
10:18 |
Sent To |
|
|
Notes |
2022-07-22 10:19:32 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) SURVEY DOES NOT SHOW AS DIGITALLY SIGNED IN ADOBE | | READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2022-06-22 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-06-22 |
Time |
10:20 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-06-22 |
Time |
10:20 |
Sent To |
|
|
Notes |
2022-06-22 10:20:50 | ALL PLANS PASSED SIGNATURE REVIEW. MP | 2022-06-10 16:09:52 | DIGITAL SIGNATURE FOR MECHANICAL APPROVED ME |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2022-08-12 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-08-12 |
Time |
13:11 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-08-12 |
Time |
13:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-07-15 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-07-15 |
Time |
11:08 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-07-15 |
Time |
11:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-06-06 |
|
|
Cont ID |
|
Sent By |
afowlkes |
Date |
2022-06-06 |
Time |
10:57 |
Rev Time |
0.00 |
Received By |
afowlkes |
Date |
2022-06-06 |
Time |
10:57 |
Sent To |
|
|
Notes |
2022-06-06 11:01:01 | 06/06/22 FAILED - NEED TO PROVIDE A SURVEY TO DETERMINE | | IF THIS PROJECT MEETS SETBACK REQUIREMENTS. | | | | NOTE THAT SEPERATE PERMITS ARE REQUIRED FOR | | IRRIGIATION, LANDSCAPING, FENCES, AND DRIVEWAYS | | | | ALEXANDER FOWLKES | | [email protected] | | 5618221431 |
|
|