Plan Review Stops For Permit 22010950 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
F |
Date |
2022-11-15 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-11-15 |
Time |
12:56 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-11-15 |
Time |
12:53 |
Sent To |
|
|
Notes |
2022-11-15 12:56:17 | 1) THE PLAN VIEW OVER THE AERIAL SHOWS THE POLE TO BE | | LOCATED WITHIN THE PAVEMENT (IN THE CHEVRON SECTION). | | THE POLE NEEDS TO BE LOCATED AT A MINIMUM OF 2' FROM | | THE EDGE OF THE PAVEMENT. | | 2) PLANS WILL BE RE-REVIEWED AFTER ZONING APPROVAL. | | SUZANNE BERGLUND | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2022-08-08 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-08-08 |
Time |
15:35 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-08-08 |
Time |
15:33 |
Sent To |
|
|
Notes |
2022-08-08 15:35:07 | 1) THE CITY WILL NOT APPROVE OF A DIRECTIONAL BORE THAT | | LINES UP DIRECTLY ON TOP OF CITY INFRASTRUCTURE | | INCLUDING A STORM SEWER AND A SANITARY SEWER MANHOLE. | | PLEASE REVISE THE LOCATION OF YOUR PROPOSED ELECTRIC | | ROUTE. | | SUZANNE BERGLUND | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-05-26 |
|
|
Cont ID |
|
Sent By |
|
Date |
2022-05-26 |
Time |
|
Rev Time |
|
Received By |
|
Date |
2022-05-26 |
Time |
|
Sent To |
|
|
Notes |
2022-05-26 14:56:01 | 1) NO PATCH REPAIRS ALLOWED ON SIDEWALKS. FULL FLAG OF | | SIDEWALK MUST BE REMOVED AND REPLACED. | | 2) RELOCATE HANDHOLES OUTSIDE OF SIDEWALK RAMPS. | | 3) PLEASE SUBMIT COPIES OF THE CITY AS-BUILT | | INFORMATION USED TO PREPARE THESE DRAWINGS. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-11-30 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-11-30 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-09-01 |
Time |
08:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-08-24 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-08-24 |
Time |
07:32 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-06-27 |
Time |
13:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-05-26 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-05-26 |
Time |
15:07 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-01-25 |
Time |
14:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2022-11-29 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2022-11-03 |
Time |
10:41 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2022-11-29 |
Time |
16:06 |
Sent To |
|
|
Notes |
2022-11-29 16:14:46 | 1. REPEAT COMMENT: POWER PULLED FROM LOCATION ALONG | | ALLEY FRONTAGE, THE BULB-OUT IS NOT PART OF THE ALLEY | | OR STREET ROW AND POWER SOURCE IS LOCATED ON PRIVATE | | PROPERTY. PLAN SHEETS AND SURVEY ALSO SUGGEST PRIVATE | | PROPERTY, PLEASE PROVIDE PROOF OF WORK BEING DONE | | WITHIN GENERAL UTILITY EASEMENT, IN ORDER TO PULL POWER | | FROM THIS LOCATION. OTHERWISE POWER MUST BE OBTAINED | | FROM ANOTHER SOURCE. | | | | CHRIS KIMMERLY, AICP | | URBAN DESIGN PLANNER | | [email protected] 822-1426 | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-08-23 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2022-08-23 |
Time |
13:46 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2022-08-23 |
Time |
13:45 |
Sent To |
|
|
Notes |
2022-08-23 13:46:17 | 8.23.22 REVIEW | | | | 1. SATISFIED - SURVEY PROVIDED. | | | | 2. POWER PULLED FROM LOCATION ALONG ALLEY FRONTAGE, THE | | BULB-OUT IS NOT PART OF THE ALLEY ROW AND POWER SOURCE | | IS LOCATED ON PRIVATE PROPERTY. PLAN SHEETS AND SURVEY | | ALSO SUGGEST PRIVATE PROPERTY, PLEASE PROVIDE OWNERS | | CONSENT OR PROVIDE PROOF OF NECESSARY EASEMENTS TO PULL | | POWER FROM THIS LOCATION. OTHERWISE POWER MUST BE | | OBTAINED FROM ANOTHER SOURCE. | | | | 3. PARTIALLY SATISFIED - POLE ELEVATION SHEET INCLUDED. | | PLEASE PROVIDE PLAN SHEETS OF THE WCF POLE AS WELL AS | | ELECTRIC ROUTE. | | | | 4. PLEASE PROVIDE AN 8FT. BUFFER BETWEEN THE TRUNK OF | | ANY TREES AND PALMS FROM ANY HANDHOLES, BOREPITS, AND | | EXCAVATION WORK. | | | | 5. PLEASE PROVIDE LETTER OF NO RESPONSE FROM UTILITY | | PROVIDERS, SHOULD THERE BE NO RESPONSE TO PREVIOUS | | COMMUNICATIONS. | | | | CHRIS KIMMERLY, AICP | | URBAN DESIGN PLANNER | | 822.1426 [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-03-02 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2022-03-02 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2022-03-02 |
Time |
14:24 |
Sent To |
|
|
Notes |
2022-03-02 14:25:25 | 1. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | SURVEYOR, WHICH SHOWS THE POLE LOCATION, UNDERGROUND | | ELECTRIC COMPONENTS (BOREPITS, HANDHOLES, & CONDUIT | | ROUTE) AND THE RIGHT-OF-WAY LINE SO THAT STAFF CAN | | VERIFY THAT THE WIRELESS COMMUNICATION FACILITY AND | | COMPONENTS ARE WITHIN THE RIGHT-OF-WAY AND NOT ON | | PRIVATE PROPERTY. | | 2. PLEASE INCLUDE WIRELESS COMMUNICATION FACILITY | | (POLE) ELEVATION AND DETAILS, TO PROVIDE A REFERENCE TO | | THE PROPOSED POLE AND MAINTAIN CONSISTENCY BETWEEN PLAN | | SETS. | | 3. CONDUIT DEPTH AND PATH APPEARS TO AVOID CONFLICTS | | WITH LANDSCAPING/STREET TREES AND EXISTING UTILITIES. | | | | | | CHRIS KIMMERLY @ (561)822-1426 | | [email protected] | | |
|
|