Plan Review Details - Permit 22010688
Plan Review Stops For Permit 22010688
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-02-25 Cont ID  
Sent By rmcdouga Date 2022-02-25 Time 08:09 Rev Time 0.00
Received By rmcdouga Date 2022-02-25 Time 08:09 Sent To  
Notes
2022-02-25 08:09:36SEE MASTER #22010445.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 15:19 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 15:19 Sent To  
Notes
2022-02-23 15:22:52PROVIDEA A VALUATION FOR THIS PROJECT. FBC 109

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-02-02 Cont ID  
Sent By rmcdouga Date 2022-02-02 Time 10:52 Rev Time 0.00
Received By rmcdouga Date 2022-02-02 Time 10:52 Sent To  
Notes
2022-02-02 10:53:39PENDING APPROVAL OF THE MASTER PERMIT.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-01-27 Cont ID  
Sent By ldeloren Date 2022-01-27 Time   Rev Time 0.00
Received By ldeloren Date 2022-01-27 Time   Sent To  
Notes
2022-01-27 13:00:28PASSED WITH PROVISOS:
  
 1) CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
 2) IF PROPOSED WORK (CONSTRUCTION, TEMPORARY PARKING OF
 CONSTRUCTION VEHICLES, ETC.) ENCROACHES INTO VEHICLE
 TRAVEL LANES AN MOT PLAN MAY BE REQUIRED. APPLICANT
 SHALL COORDINATE DIRECTLY WITH CITY OF WPB
 TRANSPORTATION ENGINEER AT [email protected] .
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-01-27 Cont ID  
Sent By pleduc Date 2022-01-27 Time   Rev Time 0.00
Received By pleduc Date 2022-01-27 Time 15:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 15:19 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 06:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-02 Cont ID  
Sent By rmcdouga Date 2022-02-02 Time 10:52 Rev Time 0.00
Received By rmcdouga Date 2022-01-21 Time 15:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 15:19 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 15:19 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-01-26 Cont ID  
Sent By shill Date 2022-01-26 Time 15:51 Rev Time 0.00
Received By shill Date 2022-01-26 Time 15:51 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-02-23 Cont ID  
Sent By ahansen Date 2022-02-23 Time 16:47 Rev Time 0.00
Received By ahansen Date 2022-02-14 Time 16:08 Sent To  
Notes
2022-02-14 16:11:18PASSED WITH PROVISO. THIS STATION WILL REQUIRE THE
 CONSTRUCTION OF A CONCRETE SLAB TO ANCHOR THE STATION.
 A SEPARATE PERMIT IS REQUIRED FOR THE CONSTRUCTION OF
 THE SLAB.

Review Stop Z ZONING
Rev No 1 Status F Date   Cont ID  
Sent By ckimmerl Date   Time   Rev Time 0.00
Received By ahansen Date 2022-02-01 Time 10:52 Sent To  
Notes
2022-02-01 10:57:48A CONCRETE SLAB IS INDICATED ON THE DRAWINGS IN ORDER
 TO INSTALL A STATION AT THIS LOCATION; HOWEVER, THE
 APPLICATION DOES NOT INCLUDE ANY INFORMATION (OR
 APPLICATION) ON THE INSTALLATION OF THE SLAB. A
 CONCURRENT PERMIT FOR THE CONSTRUCTION OF THE CONCRETE
 SLAB IS REQUIRED.