Plan Review Details - Permit 22010686
Plan Review Stops For Permit 22010686
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-02-25 Cont ID  
Sent By rmcdouga Date 2022-02-25 Time 08:02 Rev Time 0.00
Received By rmcdouga Date 2022-02-25 Time 08:02 Sent To  
Notes
2022-02-25 08:16:10SEE MASTER #22010445.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 14:44 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 14:44 Sent To  
Notes
2022-02-23 14:46:06PROVIDE A VALUE FOR THIS PROJECT. FBC 109

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-02-02 Cont ID  
Sent By rmcdouga Date 2022-02-02 Time 10:40 Rev Time 0.00
Received By rmcdouga Date 2022-02-02 Time 10:40 Sent To  
Notes
2022-02-02 10:41:50PENDING APPROVAL OF THE MASTER PERMIT.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-01-27 Cont ID  
Sent By ldeloren Date 2022-01-27 Time   Rev Time 0.00
Received By ldeloren Date 2022-01-27 Time   Sent To  
Notes
2022-01-27 12:49:12PASSED WITH PROVISOS:
  
 1) CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
 2) IF PROPOSED WORK (CONSTRUCTION, TEMPORARY PARKING OF
 CONSTRUCTION VEHICLES, ETC.) ENCROACHES INTO VEHICLE
 TRAVEL LANES AN MOT PLAN MAY BE REQUIRED. APPLICANT
 SHALL COORDINATE DIRECTLY WITH CITY OF WPB
 TRANSPORTATION ENGINEER AT [email protected] .
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-01-27 Cont ID  
Sent By pleduc Date 2022-01-27 Time   Rev Time 0.00
Received By pleduc Date 2022-01-27 Time 14:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 14:44 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 07:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-02 Cont ID  
Sent By rmcdouga Date 2022-02-02 Time 10:43 Rev Time 0.00
Received By rmcdouga Date 2022-01-21 Time 15:49 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-02-23 Cont ID  
Sent By rmcdouga Date 2022-02-23 Time 14:43 Rev Time 0.00
Received By rmcdouga Date 2022-02-23 Time 14:43 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-01-26 Cont ID  
Sent By shill Date 2022-01-26 Time 15:49 Rev Time 0.00
Received By shill Date 2022-01-26 Time 15:49 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-02-23 Cont ID  
Sent By ahansen Date 2022-02-23 Time 16:42 Rev Time 0.00
Received By ahansen Date 2022-02-14 Time 16:06 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date   Cont ID  
Sent By ckimmerl Date   Time   Rev Time 0.00
Received By ahansen Date 2022-02-01 Time 16:10 Sent To  
Notes
2022-02-01 16:10:471. THE AREA WHERE THE STATION IS BEING PROPOSED IS
 CONTROLLED BY RELATED THROUGH A MAINTENANCE AGREEMENT
 WITH THE CITY. AS A RESULT, WRITTEN PERMISSION FROM
 RELATED IS NEEDED TO INSTALL THE STATION AT THIS
 LOCATION. 2. THE DRAWING AND THE IMAGE PROVIDED APPEAR
 TO BE IN CONFLICT AS TO WHETHER THE BIKES WILL BE
 PULLED OUT TOWARDS THE NORTH (SIDEWALK) OR TOWARDS THE
 SOUTH (STREET). BIKES SHOULD PULL OUT TOWARDS THE NORTH
 (SIDEWALK). PLEASE CLARIFY.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved