Plan Review Stops For Permit 22010677 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-02-25 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-25 |
Time |
07:20 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-25 |
Time |
07:20 |
Sent To |
|
|
Notes |
2022-02-25 07:21:01 | SEE MASTER #22010445. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2022-02-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-23 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-23 |
Time |
13:31 |
Sent To |
|
|
Notes |
2022-02-23 13:32:39 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SEVENTH EDITION (2020) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SUBMIT THE WIND LOAD CALCULATIONS FOR THE BIKE DOCK | | INSTALLATION TO STEEL PLATES ON PAVERS. FBC 107.2.1 | | | | 2) SPECIFY THE VALUE OF THIS PROJECT. FBC 109 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-02-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-02 |
Time |
11:12 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-02 |
Time |
11:12 |
Sent To |
|
|
Notes |
2022-02-02 11:13:01 | PENDING APPROVAL OF THE MASTER PERMIT. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2022-01-27 |
|
|
Cont ID |
|
Sent By |
ldeloren |
Date |
2022-01-27 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2022-01-27 |
Time |
|
Sent To |
|
|
Notes |
2022-01-27 12:30:22 | PASSED WITH PROVISOS: | | | | 1) CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE | | INFO ON "CALL BEFORE YOU DIG", GO TO | | HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY | | DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE, | | CHAPTER 556.) | | 2) IF PROPOSED WORK (CONSTRUCTION, TEMPORARY PARKING OF | | CONSTRUCTION VEHICLES, ETC.) ENCROACHES INTO VEHICLE | | TRAVEL LANES AN MOT PLAN MAY BE REQUIRED. APPLICANT | | SHALL COORDINATE DIRECTLY WITH CITY OF WPB | | TRANSPORTATION ENGINEER AT [email protected] . | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-02-10 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-02-10 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-02-10 |
Time |
09:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2022-01-27 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-01-27 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2022-01-27 |
Time |
12:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-02-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-23 |
Time |
13:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-09 |
Time |
09:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-02-02 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-02 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-01-21 |
Time |
15:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-02-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-23 |
Time |
13:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-23 |
Time |
13:33 |
Sent To |
|
|
Notes |
2022-02-23 13:34:05 | THE ENGINEER'S DIGITAL SIGNATURE IS REQUIRED ON THE | | WINDLOAD CALCS. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2022-01-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-01-26 |
Time |
15:39 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-01-26 |
Time |
15:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
Sent By |
ahansen |
Date |
2022-02-23 |
Time |
16:36 |
Rev Time |
0.00 |
Received By |
ahansen |
Date |
2022-02-10 |
Time |
10:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
ahansen |
Date |
2022-02-01 |
Time |
15:31 |
Sent To |
|
|
Notes |
2022-02-01 15:31:19 | THERE APPEARS TO BE A CONFLICT BETWEEN THE PROPOSED | | STATION AND A POLE LOCATED IMMEDIATELY TO THE SOUTH | | THAT MAY PREVENT BICYCLES FROM BEING INSTALLED OR | | REMOVED FROM THE STATION. INCLUDE ADDITIONAL DETAILS ON | | THE APPLICATION ON HOW THIS CONFLICT WILL BE AVOIDED | | WHILE STILL HAVING SUFFICIENT CLEARANCE BETWEEN THE | | PROPOSED STATION AND THE EXISTING BIKE PARKING AND | | PLANTERS TO THE EAST AND WEST. |
|
|