Plan Review Stops For Permit 22010659 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-05-25 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2022-05-25 |
Time |
13:38 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2022-02-01 |
Time |
08:50 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2022-02-01 |
Time |
08:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2022-01-21 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2022-01-21 |
Time |
|
Rev Time |
0.00 |
Received By |
bdolan |
Date |
2022-01-21 |
Time |
10:08 |
Sent To |
|
|
Notes |
2022-01-21 10:12:37 | FIRE DEPARTMENT HAS NO OBJECTIONS TO THE PROPOSED | | PROJECT. | | | | ALL WORK SHALL BE INSPECTED AND VERIFIED BY FIREL | | INSPECTIONS. | | | | LT. BRIAN DOLAN | | DIVISION OF FIRE PREVENTION | | 561-804-4752 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-05-25 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-05-09 |
Time |
14:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-02-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-02-25 |
Time |
15:40 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-02-10 |
Time |
08:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2022-02-01 |
Time |
08:51 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2022-01-19 |
Time |
16:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
P |
Date |
2022-06-15 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-06-15 |
Time |
11:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-06-15 |
Time |
11:45 |
Sent To |
|
|
Notes |
2022-06-15 11:46:30 | PROVISO - PROVIDE DIGITALLY SIGNED DOCUMENTS PRIOR TO | | CO | | STRUCTURAL SENT BY EMAIL, REQUESTED THAT ALL BE SENT AT | | SAME TIME | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2022-05-24 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-05-24 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-05-24 |
Time |
15:23 |
Sent To |
|
|
Notes |
2022-05-24 15:34:02 | SIGNATURE REVIEW: | | 1- ONLY DRAWING A001 UPLOADED TO PROJECTDOX ON 05/09/22 | | HAVE THE ARCHITECT'S ORIGINAL DIGITAL SIGNATURE. ALL | | OTHER DRAWINGS SUBMITTED HAVE A COPY OF THE ARCHITECT | | AND ENGINEER SEAL AND SIGNATURE. ALL DRAWINGS NEED TO | | HAVE ARCHITECT AND ENGINEER ORIGINAL SEAL AND SIGNATURE | | AS REQUIRED BY CHAPTER 481 AND 471 F.S. WHEN SUBMITTING | | DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS. | | | | | | NOTE: SUBMIT DRAWINGS ELECTRONICALLY WITH DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ORIGINAL SEAL AND | | SIGNATURE. | | | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | | | | | | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2022-05-06 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-05-06 |
Time |
15:59 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-05-06 |
Time |
15:59 |
Sent To |
|
|
Notes |
2022-05-06 15:59:39 | 1) SIGNATURE REVIEW FAILED | | IT APPEARS ALL DRAWINGS ARE COPIES/SCANS OF AN | | ARCHITECT DESIGNED DRAWINGS | | | | FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND | | SIGNED. | | | | EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF | | APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX, | | OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER | | ORIGINAL WITH A WET SIGNATURE TO THE BUILDING DIVISION. | | SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO | | BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED | | DOCUMENTS ARE PREFERRED. | | | | PLEASE EMAIL [email protected] AND CC TO | | [email protected] | | | | MICHAEL PETERSON | | ELECTRICAL PLANS EXAMINER | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-02-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2022-02-25 |
Time |
15:36 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2022-02-25 |
Time |
15:41 |
Sent To |
|
|
Notes |
2022-02-25 15:47:40 | 1) SIGNATURE REVIEW FAILED | | IT APPEARS ALL DRAWINGS ARE COPIES/SCANS OF AN | | ARCHITECT DESIGNED DRAWINGS | | | | FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND | | SIGNED. | | | | EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF | | APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX, | | OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER | | ORIGINAL WITH A WET SIGNATURE TO THE BUILDING DIVISION. | | SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO | | BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED | | DOCUMENTS ARE PREFERRED. | | | | PLEASE EMAIL [email protected] AND CC TO | | [email protected] | | | | MICHAEL PETERSON | | ELECTRICAL PLANS EXAMINER | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2022-02-01 |
Time |
08:50 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2022-02-01 |
Time |
08:47 |
Sent To |
|
|
Notes |
2022-02-01 08:50:30 | FLORIDA ADMINISTRATIVE CODE 61G15-23.005 (3)(C) A | | DOCUMENT IN THE FILE FOLDER, SCANNED, FACSIMILE, | | DIGITALLY CREATED OR COPIED IMAGE OF THE LICENSEE?S | | SIGNATURE SHALL NOT BE USED ON ELECTRONIC/DIGITALLY | | SIGNED AND SEALED ENGINEERING PLANS, SPECIFICATIONS, | | REPORTS OR OTHER DOCUMENTS. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
P |
Date |
2022-05-25 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2022-05-25 |
Time |
13:38 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2022-05-18 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2022-05-18 |
Time |
|
Sent To |
|
|
Notes |
2022-05-18 15:48:20 | ZONING APPROVED WITH THE FOLLOWING PROVISO(S): | | | | 1.) SUBJECT TO THE CONDITIONS IN CONDITIONAL APPROVAL | | LETTERS FOR ISPR 20-09 AND ISPR 20-09A. | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2022-05-06 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2022-05-06 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2022-05-06 |
Time |
|
Sent To |
|
|
Notes |
2022-05-06 15:53:32 | ADVISED BY RGATHRIGHT TO FAIL ON 5/6/2022, AS APPLICANT | | IS READY TO RESUBMIT REVISED PLANS. | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2022-02-24 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2022-02-24 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2022-02-24 |
Time |
|
Sent To |
|
|
Notes |
2022-02-24 10:54:50 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) ZONING SIGN-OFF FOR THIS PERMIT IS CONTINGENT ON | | THE APPROVAL OF INFORMAL SITE PLAN REVIEW (ISPR) CASE | | NO. 20-09A - PIG BEACH BBQ MINOR SITE PLAN AMENDMENT. | | THE APPROVED PLANS FROM ISPR 16-09A SHALL MATCH ALL | | PLANS IN THIS PERMIT SUBMITTAL. CURRENTLY, ISPR CASE | | NO. 20-09A IS IN REVIEW WITH STAFF AND IS PENDING | | APPROVAL. | | | | | | NOTES: | | | | * IT IS NOTED IN THE APPLICATION FOR ISPR CASE NO. | | 20-09A THAT THE PROPOSED STEEL BOLLARDS LOCATED ALONG | | THE WEST BUILDING FRONTAGE ARE PROVIDED TOCREATE | | OUTDOOR SEATING FOR THE RESTAURANT. IT MUST BE | | CLEARIFIED THAT APPROVED INDOOR SEATING CAN ONLY BE | | SHIFTED OUTDOORS AND THEPROPOSED OUTDOOR SEATING AREA | | IS NOT NEW SEATING, AS ADDITIONAL/NEW SEATING WILL | | TRIGGER THE REQUIREMENT ADDITIONAL PARKING. | | | | * SEPARATE PERMITS AND REVIEWS REQUIRED FOR ALL | | EXTERIOR SITE WORK | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: GC | | | | * REFERENCE: #20120003 (INTERIOR RENOVATION ONLY) | | | | * REFERENCE: ISPR 20-09A (PIG BEACH BBQ - MINOR SITE | | PLAN AMENDMENT) RESUBMITTAL RECEIVED BY STAFF ON | | 2/23/22; PLANS CURRENTLY IN REVIEW BY STAFF. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-01-26 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2022-01-26 |
Time |
|
Rev Time |
|
Received By |
llouie |
Date |
2022-01-26 |
Time |
|
Sent To |
|
|
Notes |
2022-01-26 13:55:24 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) CHANGES DETECTED IN THE BUILDING PERMIT SITE PLAN | | (AND IMPROVEMENTS DETECTED FROM A SITE VISIT) THAT DO | | NOT MATCH THE APPROVED SITE PLAN ON FILE WITH THE | | DEVELOPMENT SERVICES DEPARTMENT - PLANNING DIVISION | | (REFERENCE: ISPR CASE NO. 20-09). A MINOR SITE PLAN | | AMENDMENT APPLICATION MUST BE SUBMITTED, REVIEWED AND | | APPROVED BY THE PLANNING DIVISION PRIOR TO ZONING | | SIGN-OFF OF THIS PERMIT. PLEASE CONTACT PLANNING AND | | ZONING STAFF FOR MORE INFORMATION AND THE 2022 | | DEVELOPMENT APPLICATION. | | | | 2.) ANY SITE WORK PERMIT FOR THIS PROJECT MUST BE | | CONSISTENT WITH THE APPROVED SITE PLAN ON FILE WITH | | PLANNING DIVISION. IF CHANGES ARE MADE, A MINOR SITE | | PLAN AMENDMENT APPROVAL IS REQUIRED WITH THE PLANNING | | DIVISION PRIOR TO PERMIT SIGN-OFF. | | | | 3.) WHAT IS THE PURPOSE OF THE CONCRETE FILLED STEEL | | BOLLARDS ALONG SOUTH DIXIE HIGHWAY? PLEASE NOTE THAT | | THE BOLLARDS MUST BE SETBACK A MINIMUM OF 5 FT. FROM | | THE PROPERTY LINE AND THE DIMENSIONS SHALL BE PROVIDED | | IN THE SITE PLAN FOR CONSISTENCY WITH THE CITY'S ZONING | | AND LAND DEVELOPMENT REGULATIONS (ZLDRS). [ZLDR | | S.94-145.2.] | | | | 4.) EACH ROW OF PARKING SHALL BE TERMINATED BY A | | LANDSCAPE ISLAND NOT LESS THAN 8 FT. IN WIDTH AND NOT | | LESS THAN THE LENGTH OF THE ADJACENT PARKING STALL. | | EACH LANDSCAPED ISLAND SHALL HAVE A MINIMUM RADIUS OF | | 2.5 FT. AT ITS END SO AS TO ALLOW CAR MANEUVERING. THE | | TERMINAL LANDSCAPE ISLAND SHOWN WEST OF THE DUMPSTER | | AREA IN THE APPROVED SITE PLAN ON FILE WITH THE | | PLANNING DIVISION HAS BEEN REMOVED FROM THE BUILDING | | PERMIT SITE PLAN AND IS NO LONGER CONSISTENT WITH THE | | STANDARDS OF THE ZLDRS.I [ZLDR S.94-443.C.] | | | | 5.) A LANDSCAPE HEDGE SHALL BE PROVIDED AROUND THE | | PERIMETER OF THE DUMPSTER ENCLOSURE. THE AREA FOR THE | | LANDSCAPE HEDGE PROVIDED AROUND THE DUMPSTER ENCLOSURE | | OF THE APPROVED SITE PLAN ON FILE WITH THE PLANNING | | DIVISION HAS BEEN REMOVED IN THE BUILDING PERMIT SITE | | PLAN AND IS NO LONGER CONSISTENT WITH THE STANDARDS OF | | THE ZLDRS. [ZLDR S.94-315] | | | | | | NOTES: | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: GC | | | | * REFERENCE: ISPR CASE NO. 20-09 (CONDITIONALLY | | APPROVED 5/19/2021) | | | | * SPOKE TO STEVEN BUTLER ON 1/25/2022 - A MINOR SITE | | PLAN AMENDMENT MUST BE SUBMITTED, REVIEWED AND APPROVED | | PRIOR TO ZONING SIGN-OFF OF PERMIT. | | |
|
|