Plan Review Stops For Permit 22010333 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-16 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-16 |
Time |
12:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2022-02-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-09 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-09 |
Time |
14:33 |
Sent To |
|
|
Notes |
2022-02-09 14:43:01 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) PROVIDE A DETAIL OF THE POOL HEATER EQUIPMENT PAD | | AND SPECIFY HOW THE POOL HEATER WILL BE ANCHORED TO IT | | TO RESIST WINDLOADS. FBC-R301.1 | | | | 2) THE DOCUMENTS REQUIRED IN COMMENT 1 SHALL HAVE THE | | NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE | | DESIGN ON THEM. FBC 107.2.1 - INFORMATION ON | | CONSTRUCTION DOCUMENTS. ALL INFORMATION, DRAWINGS, | | SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE | | NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE | | DESIGN. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-02-16 |
Time |
09:52 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-02-16 |
Time |
09:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2022-01-31 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2022-01-31 |
Time |
23:07 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2022-01-29 |
Time |
23:02 |
Sent To |
|
|
Notes |
2022-01-31 23:07:29 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND | | SEALED BY A LICENSED DESIGN PROFESSIONAL OR SIGNED BY | | THE ELECTRICAL CONTRACTOR QUALIFIER. FS 471.003(2)(H); | | 471.025; WPB FBC 107.2.1, 107.3.5 | | | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | CODES IN EFFECT: | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | UILDING-PERMIT-FORMS | | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE 2020 7TH ED. | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | 7TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | 7TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | V/R, | | | | FRANK GIAQUINTO III | | ELECTRICAL INSPECTOR | | ELECTRICAL PLANS EXAMINER | | CITY OF WEST PALM BEACH | | [email protected] | | CELL: 561-805-6744 | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
P |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-22 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-02-22 |
Time |
14:15 |
Sent To |
|
|
Notes |
2022-02-22 15:03:35 | GAS HOOK UP FOR POOL. THE POOL HEATER FOR THE GAS IS | | UNDER PERMIT #19110543 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2022-04-14 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-04-14 |
Time |
08:34 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-04-14 |
Time |
08:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-02-22 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-22 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-02-16 |
Time |
07:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-02-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-09 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-01-11 |
Time |
06:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2022-02-22 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-02-22 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-02-22 |
Time |
14:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2022-01-12 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-01-12 |
Time |
09:38 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-01-12 |
Time |
09:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2022-02-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-16 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-16 |
Time |
12:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2022-02-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2022-02-09 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2022-02-09 |
Time |
14:33 |
Sent To |
|
|
Notes |
|
|