Plan Review Details - Permit 22010128
Plan Review Stops For Permit 22010128
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-03-29 Cont ID  
Sent By rmcdouga Date 2022-03-29 Time 07:50 Rev Time 0.00
Received By rmcdouga Date 2022-03-29 Time 07:50 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-03-10 Cont ID  
Sent By rmcdouga Date 2022-03-10 Time 08:35 Rev Time 0.00
Received By rmcdouga Date 2022-03-10 Time 08:35 Sent To  
Notes
2022-03-10 09:01:40PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT GENERATOR PAD DRAWINGS WITH GENERATOR TO PAD
 ANCHORING DETAILS. IF A PREFABRICATED GENERATOR PAD
 WILL BE USED, SUBMIT SIGNED AND SEALED SITE SPECIFIC
 ENGINEERING FOR IT. FBC AMENDMENTS 107.2.1
  
 2) THE GENERATOR EXHAUST IS REQUIRED TO BE 10 FEET FROM
 OPENINGS INTO A BUILDING. FBC-R303.5 OUTDOOR INTAKE AND
 EXHAUST OPENINGS SHALL BE LOCATED IN ACCORDANCE WITH
 SECTIONS R303.5.1 AND R303.5.2.
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-04-06 Cont ID  
Sent By mpeterso Date 2022-04-06 Time 10:51 Rev Time 0.00
Received By mpeterso Date 2022-04-06 Time 10:51 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-01-27 Cont ID  
Sent By jleahy Date 2022-01-27 Time 16:09 Rev Time 0.00
Received By jleahy Date 2022-01-27 Time 16:06 Sent To  
Notes
2022-01-27 16:14:19ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) SUBMIT CUT SHEETS FOR GENERATOR AND TRANSFER SWITCH.
  
 2) SUBMIT SIGNED SIGNED CUT SHEETS FOR GENERATOR PAD.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-04-06 Cont ID  
Sent By mpeterso Date 2022-04-06 Time 10:51 Rev Time 0.00
Received By mpeterso Date 2022-03-13 Time 08:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-10 Cont ID  
Sent By rmcdouga Date 2022-03-10 Time 09:02 Rev Time 0.00
Received By rmcdouga Date 2022-01-05 Time 06:28 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-03-29 Cont ID  
Sent By rmcdouga Date 2022-03-29 Time 07:51 Rev Time 0.00
Received By rmcdouga Date 2022-03-29 Time 07:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-03-10 Cont ID  
Sent By rmcdouga Date 2022-03-10 Time 09:01 Rev Time 0.00
Received By rmcdouga Date 2022-03-10 Time 09:01 Sent To  
Notes
2022-03-10 09:02:52THE SIGNATURES ON ANY NEW SUBMITTAL DOCUMENTS WILL HAVE
 TO BE REVIEWED.

Review Stop Z ZONING
Rev No 2 Status P Date 2022-03-21 Cont ID  
Sent By asangele Date 2022-03-21 Time 08:48 Rev Time 0.00
Received By asangele Date 2022-03-21 Time 08:48 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-01-24 Cont ID  
Sent By asanglee Date 2022-01-24 Time 15:33 Rev Time 0.00
Received By asangele Date 2022-01-24 Time 15:29 Sent To  
Notes
2022-01-24 15:33:24FAILED: PLEASE PROVED A SURVEY OF LOCATION OF PROPOSED
 GENERATOR. THE GENERATOR MAY NOT PROJECT MORE THAN FOUR
 FEET INTO A SETBACK.
  
 ALEXIS SANGELEER
 ASSOCIATE PLANNER
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved