Plan Review Stops For Permit 21120300 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2021-12-07 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-12-07 |
Time |
16:35 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-12-07 |
Time |
16:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2023-04-18 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2023-04-18 |
Time |
11:02 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2023-04-18 |
Time |
11:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2023-01-24 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2023-01-24 |
Time |
13:19 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2023-01-24 |
Time |
13:17 |
Sent To |
|
|
Notes |
2023-01-24 13:19:35 | 1) REPEAT COMMENT FROM ZONING: POLE APPEARS TO BE | | LOCATED ON TOP OF AN EXISTING GAS MAIN. PLEASE PROVIDE | | A LETTER GRANTING APPROVAL FROM THE GAS MAIN OWNER OR | | COORDINATE THE RELOCATION OF THE GAS MAIN WITH THEM. | | 2) OTHER COMMENTS REGARDING CITY UTILITES HAVE BEEN | | ADDRESSED. | | SUZANNE BERGLUND | | [email protected] | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-06-23 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2022-06-23 |
Time |
17:00 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2022-06-23 |
Time |
16:58 |
Sent To |
|
|
Notes |
2022-06-23 16:59:57 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT | | JANICE TARBILL, [email protected] FOR AS-BUILT | | INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR | | RESUBMITTAL. | | 2) BORE PIT LOCATION IS ON TOP OF A CITY STORM SEWER | | PIPE BASED ON CITY UTILITY GIS INFORMATION. | | 2) PROVIDE PROFILE FOR PROPOSED UNDERGROUND ELECTRIC | | SHOWING ALL CROSSING DATA FOR OTHER UTILITIES. | | 3) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | REQUIRED PER CITY STANDARD. | | | | SUZANNE BERGLUND | | [email protected] | | 561-494-1075 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2023-06-02 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-06-02 |
Time |
08:17 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-04-21 |
Time |
09:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-04-19 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-04-19 |
Time |
07:11 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2023-02-17 |
Time |
15:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2023-02-03 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-02-03 |
Time |
08:52 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-12-27 |
Time |
09:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2022-06-24 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-06-24 |
Time |
07:40 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2021-12-07 |
Time |
13:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2023-02-03 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-02-03 |
Time |
08:52 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-12-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-12-17 |
Time |
15:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-12-17 |
Time |
15:45 |
Sent To |
|
|
Notes |
2021-12-17 15:45:57 | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | COMMUNICATIONS APPLICATIONS - NEW PROCESS EFFECTIVE | | 12/6/2021 | | | | 1. FOR ALL FUTURE SUBMITTALS, PRIOR TO SUBMISSION, | | CONTACT [email protected] TO OBTAIN THE CORRECT ADDRESS | | FOR YOUR APPLICATION. SHE WILL ASSIGN AN ADDRESS VIA | | EMAIL. WHEN YOU SUBMIT THE APPLICATION, INCLUDE THE | | EMAIL AS AN ATTACHMENT. | | | | 2. FOR ALL FUTURE SUBMITTALS, TO SUBMIT THE | | COMMUNICATIONS APPLICATION, EMAIL THE COMPLETED | | APPLICATION TO [email protected]. THEY WILL | | GENERATE YOUR APPLICATION AND SEND YOU INSTRUCTIONS TO | | UPLOAD YOUR PLANS. | | | | 3. FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | SIGNED, SEALED, DATED ORIGINALS. IT APPEARS THAT THE | | DOCUMENTS SUBMITTED PAPER TO THE BUILDING DIVISION WERE | | DIGITALLY SIGNED PLANS THAT WERE PRINTED. | | | | IF THIS APPLICATION FAILS REVIEW - WHEN RESUBMITTING, | | UPLOAD INDIVIDUALLY SIGNED AND SEALED DRAWINGS IF | | POSSIBLE. IF YOU CANNOT OBTAIN PLANS IN THAT FORMAT, | | UPLOAD THE SINGLE MULTIPAGE DIGITALY SIGNED PDF TO THE | | SIGNATURE FOLDER. | | | | IF THIS APPLICATION PASSES REVIEW - UPLOAD THE | | DIGITALLY SIGNED DOCUMENTS (SHOULD BE IDENTICAL TO THE | | DOCUMENTS REVIEWED) TO THE SIGNATURE FOLDER. | | | | IF THE ENGINEER DOES NOT HAVE A DIGITAL SIGNATURE, | | PLEASE CONTACT ME DIRECTLY TO DISCUSS OPTIONS. | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2023-06-01 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2023-06-01 |
Time |
11:48 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2023-06-01 |
Time |
11:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-04-18 |
|
|
Cont ID |
|
Sent By |
sberglun |
Date |
2023-04-18 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
sberglun |
Date |
2023-04-18 |
Time |
11:02 |
Sent To |
|
|
Notes |
2023-04-18 11:03:53 | 1. REPEAT COMMENT: THIS LOCATION IS WITHIN A HISTORIC | | DISTRICT. PLEASE PROVIDE A COPY OF THE STATE HISTORIC | | PRESERVATION OFFICE APPROVAL OF THIS LOCATION. | | | | 2. POLE SIZE, COLOR, AND DESIGN MEETS CITY ZONING | | STANDARDS. | | | | CHRIS KIMMERLY, AICP | | URBAN DESIGN PLANNER | | 822-1426 [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2023-02-02 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2023-02-02 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2023-02-02 |
Time |
10:48 |
Sent To |
|
|
Notes |
2023-02-02 10:58:58 | 1. THIS LOCATION IS WITHIN A HISTORIC DISTRICT. PLEASE | | PROVIDE A COPY OF THE STATE HISTORIC PRESERVATION | | OFFICE APPROVAL OF THIS LOCATION. | | | | 2. [REPEAT COMMENT] CONCRETE CAISSON, POLE, & | | UNDERGROUND ELECTRIC SHOWN ON DRAWINGS TO CONFLICT WITH | | EXISTING GAS LINES, PLEASE PROVIDE A LETTER FROM THE | | GAS MAIN OWNER GRANTING APPROVAL OF THE PROPOSED BORE | | PITS, UNDERGROUND ELECTRIC, AND POLE LOCATIONS. | | | | 3. POLE SIZE, COLOR, AND DESIGN MEETS CITY ZONING | | STANDARDS. | | | | CHRIS KIMMERLY, AICP | | URBAN DESIGN PLANNER | | 822-1426 [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2022-01-04 |
|
|
Cont ID |
|
Sent By |
ckimmerl |
Date |
2022-01-04 |
Time |
09:59 |
Rev Time |
0.00 |
Received By |
ckimmerl |
Date |
2022-01-04 |
Time |
09:58 |
Sent To |
|
|
Notes |
2022-01-04 09:59:14 | 1. SITE SURVEY (B-1) IS MISSING AN ADDITIONAL OVERHEAD | | WOODEN DISTRIBUTION POLE, DIRECTLY ADJACENT TO THE POLE | | WHERE THE PROPOSED ELECTRICAL HOOKUP TAKES PLACE. | | PLEASE ADJUST SITE SURVEY AND DRAWINGS TO ACCURATELY | | REFLECT CURRENT SITE CONDITIONS. | | | | 2. CONCRETE CAISSON IS SHOWN ON SURVEY TO CONFLICT WITH | | EXISTING GAS LINE, PLEASE PROVIDE THE NECESSARY PUBLIC | | UTILITY LETTER GRANTING APPROVAL OF THIS PROPOSED POLE | | LOCATION AND DEPTH. | | | | 3. POLE & UNDERGROUND ELECTRIC SHOWN ON DRAWINGS TO | | CONFLICT WITH EXISTING GAS LINES, PLEASE PROVIDE THE | | NECESSARY PUBLIC UTILITY LETTERS GRANTING APPROVAL OF | | THIS PROPOSED BORE PITS, UNDERGROUND ELECTRIC, AND POLE | | LOCATIONS. | | | | 4. PLEASE PROVIDE A TYPICAL CROSS-SECTION SHOWING THE | | DEPTH OF THE UNDERGROUND ELECTRICAL COMPONENTS. | | | | 5. THE POLE STEALTH DESIGN MEETS CITY STANDARDS. | | | | CHRIS KIMMERLY @ (561)822-1426 | | [email protected] | | |
|
|