Plan Review Details - Permit 21110356
Plan Review Stops For Permit 21110356
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2021-12-08 Cont ID  
Sent By pvalenti Date 2021-12-08 Time 08:42 Rev Time 0.00
Received By pvalenti Date 2021-12-08 Time 08:39 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-02-10 Cont ID  
Sent By pvalenti Date 2022-02-10 Time 08:45 Rev Time 0.00
Received By pvalenti Date 2022-02-10 Time 07:51 Sent To  
Notes
2022-02-10 08:59:41BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 (IN LIEU OF FPL RELEASE, PROVIDE AN ELECTRIC SUB-PERMIT
 TO ENSURE AREA OF WORK IS SAFE)
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 (IN-LIEU OF FPU RELEASE, PROVIDE A GAS/PLUMBING
 SUB-PERMIT TO ENSURE AREA OF WORK IS SAFE)
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 (THE PUBLIC UTILITIES DEMO FORM STILL NEEDS TO BE
 COMPLETED BY THE PUBLIC UTILITIES DEPT., RETURNED TO
 APPLICANT, THEN UPLOADED INTO PROJECT DOX)
  
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 (THE WATERDOWN METHOD IS STILL REQUIRED AS PER ABOVE
 NOTED OPTIONS)
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-08 Cont ID  
Sent By pvalenti Date 2021-12-08 Time 08:43 Rev Time 0.00
Received By pvalenti Date 2021-12-08 Time 08:39 Sent To  
Notes
2021-12-08 08:45:07PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED,
 FBC 107.
 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-02-14 Cont ID  
Sent By rrossano Date 2022-02-14 Time   Rev Time 0.00
Received By rrossano Date 2022-02-14 Time   Sent To  
Notes
2022-02-14 08:30:37PLEASE PROVIDE ALL UTILITY SIGN OFFS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-11-29 Cont ID  
Sent By rrossano Date 2021-11-29 Time   Rev Time  
Received By rrossano Date 2021-11-29 Time   Sent To  
Notes
2021-11-29 13:59:58PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT YOUR FAILED PLAN REVIEW AND HOW TO
 RESUBMIT, EMAIL [email protected] AND A BUILDING DIVISION TEAM
 MEMBER WILL HELP YOU.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-11-16 Cont ID  
Sent By amhamilt Date 2021-11-16 Time 12:02 Rev Time 0.00
Received By amhamilt Date 2021-11-16 Time 12:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-03-22 Cont ID  
Sent By aoliver Date 2022-03-22 Time 08:04 Rev Time 0.00
Received By aoliver Date 2022-02-08 Time 07:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-12-08 Cont ID  
Sent By pvalenti Date 2021-12-08 Time 08:46 Rev Time 0.00
Received By pvalenti Date 2021-11-09 Time 07:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-02-10 Cont ID  
Sent By pvalenti Date 2022-02-10 Time 09:15 Rev Time 0.00
Received By pvalenti Date 2022-02-10 Time 07:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-12-08 Cont ID  
Sent By pvalenti Date 2021-12-08 Time 08:42 Rev Time 0.00
Received By pvalenti Date 2021-12-08 Time 08:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-03-21 Cont ID  
Sent By amhamilt Date 2022-03-21 Time 09:37 Rev Time 0.00
Received By amhamilt Date 2022-03-21 Time 09:37 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-11-16 Cont ID  
Sent By amhamilt Date 2021-11-16 Time 12:03 Rev Time 0.00
Received By amhamilt Date 2021-11-16 Time 12:03 Sent To  
Notes
***NONE***