Plan Review Details - Permit 21100660
Plan Review Stops For Permit 21100660
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-04-11 Cont ID  
Sent By cpuell Date 2022-04-11 Time 08:57 Rev Time 0.00
Received By cpuell Date 2022-04-11 Time 08:57 Sent To  
Notes
2022-04-11 08:57:36ADDRESS APPROPRIATE FOR PROJECT, DATABASES UPDATED.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 4 Status P Date 2022-03-08 Cont ID  
Sent By aoliver Date 2022-03-08 Time 09:47 Rev Time 0.00
Received By aoliver Date 2022-03-08 Time 09:47 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status F Date 2022-02-11 Cont ID  
Sent By rmcphers Date 2022-02-11 Time 08:01 Rev Time 0.00
Received By rmcphers Date 2022-02-11 Time 08:01 Sent To  
Notes
2022-02-11 08:16:00PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2022-01-06 Cont ID  
Sent By rmcphers Date 2022-01-06 Time 08:34 Rev Time 0.00
Received By rmcphers Date 2022-01-06 Time 08:34 Sent To  
Notes
2022-01-06 08:35:41AN ASBESTOS REPORT IS NOT REQUIRED -
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-11-30 Cont ID  
Sent By rmcphers Date 2021-11-30 Time 16:33 Rev Time 0.00
Received By rmcphers Date 2021-11-30 Time 16:15 Sent To  
Notes
2021-11-30 16:34:58PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-02-11 Cont ID  
Sent By rmcphers Date 2022-02-11 Time 08:17 Rev Time 0.00
Received By rmcphers Date 2022-02-11 Time 08:17 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-01-06 Cont ID  
Sent By rmcphers Date 2022-01-06 Time 08:31 Rev Time 0.00
Received By rmcphers Date 2022-01-06 Time 08:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-11-30 Cont ID  
Sent By rmcphers Date 2021-11-30 Time 16:35 Rev Time 0.00
Received By rmcphers Date 2021-11-30 Time 16:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-02-14 Cont ID  
Sent By jleahy Date 2022-02-14 Time 11:57 Rev Time 0.00
Received By jleahy Date 2022-02-14 Time 11:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-12-09 Cont ID  
Sent By jleahy Date 2021-12-09 Time 15:22 Rev Time 0.00
Received By jleahy Date 2021-12-09 Time 15:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2022-01-25 Cont ID  
Sent By pleduc Date 2022-01-25 Time   Rev Time 0.00
Received By pleduc Date 2022-01-24 Time 11:18 Sent To  
Notes
2022-01-24 11:18:38FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ALL FIRE SPRINKLER & FIRE ALARM WORK. INCLUDING DEMO,
 SHALL BE DONE UNDER SEPARATE PERMITS & SHOP DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-12-27 Cont ID  
Sent By pleduc Date 2021-12-27 Time   Rev Time 0.00
Received By pleduc Date 2021-12-27 Time 10:57 Sent To  
Notes
2021-12-27 10:58:06FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ALL FIRE SPRINKLER & FIRE ALARM WORK. INCLUDING DEMO,
 SHALL BE DONE UNDER SEPARATE PERMITS & SHOP DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-26 Cont ID  
Sent By pleduc Date 2021-10-26 Time   Rev Time 0.00
Received By pleduc Date 2021-10-26 Time 16:08 Sent To  
Notes
2021-10-26 16:13:14FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ALL FIRE SPRINKLER & FIRE ALARM WORK. INCLUDING DEMO,
 SHALL BE DONE UNDER SEPARATE PERMITS & SHOP DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2022-04-01 Cont ID  
Sent By medwards Date 2022-04-01 Time 09:47 Rev Time 0.00
Received By medwards Date 2022-03-10 Time 13:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status F Date 2022-03-10 Cont ID  
Sent By medwards Date 2022-03-10 Time 09:28 Rev Time 0.00
Received By medwards Date 2022-03-08 Time 11:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-03-08 Cont ID  
Sent By medwards Date 2022-03-08 Time 09:47 Rev Time 0.00
Received By aoliver Date 2022-02-17 Time 10:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-02-14 Cont ID  
Sent By jleahy Date 2022-02-14 Time 11:57 Rev Time 0.00
Received By jleahy Date 2022-01-21 Time 08:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2022-01-10 Time   Rev Time 0.00
Received By aoliver Date 2021-12-22 Time 09:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-12-09 Cont ID  
Sent By jleahy Date 2021-12-09 Time 15:22 Rev Time 0.00
Received By jleahy Date 2021-10-15 Time 09:11 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2022-04-13 Cont ID  
Sent By lmarchan Date 2022-04-13 Time 13:48 Rev Time 0.00
Received By lmarchan Date 2022-04-05 Time 07:27 Sent To  
Notes
2022-04-13 11:00:52RECEIPT MU-2022-01642 - $6137.69 PAID
2022-04-05 07:28:124/5/22 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-11-30 Cont ID  
Sent By rmcphers Date 2021-11-30 Time 16:35 Rev Time 0.00
Received By rmcphers Date 2021-11-30 Time 16:35 Sent To  
Notes
2021-11-30 16:35:49PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2022-04-01 Cont ID  
Sent By medwards Date 2022-04-01 Time 09:45 Rev Time 0.00
Received By medwards Date 2022-04-01 Time 09:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status F Date 2022-03-10 Cont ID  
Sent By medwards Date 2022-03-10 Time 09:27 Rev Time 0.00
Received By medwards Date 2022-03-10 Time 09:27 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2022-03-07 Cont ID  
Sent By medwards Date 2022-03-07 Time 15:13 Rev Time 0.00
Received By medwards Date 2022-03-07 Time 15:13 Sent To  
Notes
2022-03-07 15:16:56PLEASE SEE PREVIOUS COMMENTS BELOW. THE MECHANICAL
 DRAWINGS WERE SUBMITTED THIS CYCLE BUT THE VENTILATION
 FOR THIS WORK AREA, BEAUTY SALON HAS NOT BEEN
 SUBMITTED. PLEASE PROVIDE THE OUTDOOR AIR CALCULATIONS
 FOR THIS BEAUTY SALON. FBC M 403.3.1.1 AND TABLE
 403.3.1.1. IS THER GOING TO BE ANY NAIL STATIONS IN
 THIS BEAUTY SALON? IF SO PLEASE SHOW THE EXHAUST FOR
 EACH AREA. FBC M TABLE 403.3.1.1
  
 THE DRAWING HAS CHANGED, PLEASE PROVIDE A CODE
 COMPLIANT MECHANICAL DRAWING SHOWING THIS BEAUTY SALON
 AND THE MECHANICAL SYSTEMS ASSOCIATED WITH A BEAUTY
 SALON ALONG WITH ADDRESSING THE COMMENTS FROM THE FIRST
 CYCLE MECHANICAL PLAN REVIEW LISTED BELOW.
  
  
 PLEASE PROVIDE A MECHANICAL DRAWING SHOWING THE
 MECHANICAL WORK COVERED UNDER THIS PROJECT. I.E. MOVING
 OF SUPPLY OR RETURN REGISTERS, THE DRYER EXHAUST DUCT
 AND TERMINATION LOCATION, THE BATHROOM EXHAUST FANS.
 AND THE TERMINATION LOCATIONS. IS THERE GOING TO BE A
 HOOD ABOVE THE RANGE? IF SO WILL IT BE DUCTED TO THE
 EXTERIOR? WHAT ARE THE EXHAUST CFM'S? DOES IT REQUIRE
 MAKE UP AIR? FBC 107.2.1
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2022-02-10 Cont ID  
Sent By medwards Date 2022-02-10 Time 13:54 Rev Time 0.00
Received By medwards Date 2022-02-10 Time 13:40 Sent To  
Notes
2022-02-10 13:57:43THE DRAWING HAS CHANGED, PLEASE PROVIDE A CODE
 COMPLIANT MECHANICAL DRAWING SHOWING THIS BEAUTY SALON
 AND THE MECHANICAL SYSTEMS ASSOCIATED WITH A BEAUTY
 SALON ALONG WITH ADDRESSING THE COMMENTS FROM THE FIRST
 CYCLE MECHANICAL PLAN REVIEW LISTED BELOW.
  
 PLEASE RESPOND TO FIRST CYCLE MECHANICAL REVIEW
 COMMENTS BELOW:
  
 PLEASE PROVIDE A MECHANICAL DRAWING SHOWING THE
 MECHANICAL WORK COVERED UNDER THIS PROJECT. I.E. MOVING
 OF SUPPLY OR RETURN REGISTERS, THE DRYER EXHAUST DUCT
 AND TERMINATION LOCATION, THE BATHROOM EXHAUST FANS.
 AND THE TERMINATION LOCATIONS. IS THERE GOING TO BE A
 HOOD ABOVE THE RANGE? IF SO WILL IT BE DUCTED TO THE
 EXTERIOR? WHAT ARE THE EXHAUST CFM'S? DOES IT REQUIRE
 MAKE UP AIR? FBC 107.2.1
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2021-12-30 Cont ID  
Sent By medwards Date 2021-12-30 Time 13:53 Rev Time 0.00
Received By medwards Date 2021-12-30 Time 13:53 Sent To  
Notes
2021-12-30 13:54:40PLEASE RESPOND TO FIRST CYCLE MECHANICAL REVIEW
 COMMENTS BELOW:
  
 PLEASE PROVIDE A MECHANICAL DRAWING SHOWING THE
 MECHANICAL WORK COVERED UNDER THIS PROJECT. I.E. MOVING
 OF SUPPLY OR RETURN REGISTERS, THE DRYER EXHAUST DUCT
 AND TERMINATION LOCATION, THE BATHROOM EXHAUST FANS.
 AND THE TERMINATION LOCATIONS. IS THERE GOING TO BE A
 HOOD ABOVE THE RANGE? IF SO WILL IT BE DUCTED TO THE
 EXTERIOR? WHAT ARE THE EXHAUST CFM'S? DOES IT REQUIRE
 MAKE UP AIR? FBC 107.2.1
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-11-08 Cont ID  
Sent By medwards Date 2021-11-08 Time 16:54 Rev Time 0.00
Received By medwards Date 2021-11-08 Time 16:54 Sent To  
Notes
2021-11-08 16:59:35PLEASE PROVIDE A MECHANICAL DRAWING SHOWING THE
 MECHANICAL WORK COVERED UNDER THIS PROJECT. I.E. MOVING
 OF SUPPLY OR RETURN REGISTERS, THE DRYER EXHAUST DUCT
 AND TERMINATION LOCATION, THE BATHROOM EXHAUST FANS.
 AND THE TERMINATION LOCATIONS. IS THERE GOING TO BE A
 HOOD ABOVE THE RANGE? IF SO WILL IT BE DUCTED TO THE
 EXTERIOR? WHAT ARE THE EXHAUST CFM'S? DOES IT REQUIRE
 MAKE UP AIR? FBC 107.2.1
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2022-02-25 Cont ID  
Sent By ccole Date 2022-02-25 Time 08:44 Rev Time 0.00
Received By ccole Date 2022-02-25 Time 08:44 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2022-02-04 Cont ID  
Sent By ccole Date 2022-02-04 Time 10:46 Rev Time 0.00
Received By ccole Date 2022-02-04 Time 09:33 Sent To  
Notes
2022-02-04 10:46:253RD REVIEW FBC-2020 PLUMBING
 PERMIT- 21100660
 2/4/2022
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
 FAIR HOUSING DESIGN ACT MANUAL
  
 PLAN REVIEW RESULTS: DENIED. COMMENTS FROM THE 1ST AND
 2ND REVIEW STILL EXIST. I AM REQUESTING THAT THE
 CONTRACTOR/DESIGNER FOR THE PROJECT CONTACT ME TO GO
 OVER THE PLANS EITHER BY TELPHONE OR ZOOM CALL. PLEASE
 NOTE THE PLUMBING PLANS SHALL BE SIGNED BY A FL.
 LICENSED ENGINEER OR PLUMBING CONTRACTOR. PLUMBING
 CONTRACTOR PLANS SHALL BEAR THE PRINTED NAME, LICENSE
 NUMBER AND SIGNATURE OF THE CONTRACTOR- SEC. 107.2.1
 WPB.
  
 1) SHEET P1: THE SANITARY ISOMETRIC DRAWING DOES NOT
 APPEAR TO REFLECT THE ACTUAL BUILDING DRAIN LAYOUT AS
 SHOWN ON THE FLOOR PLAN. A) BASED ON THE FLOOR PLAN THE
 KITCHEN SINK DRAIN SHALL CONNECT DOWNSTREAM OF THE
 WASHING MACHINE DRAIN CONNECTION AND BE INDIVIDUALLY
 VENTED- SECS. 910 & 911 FBC P. B) THE HAIR SINK DRAINS
 SHALL CONNECT DOWNSTREAM OF THE WC AND LAV AND SHALL BE
 INDIVIDUALLY VENTED IN ACCORDANCE WITH SECS. 910 &
 912.1 FBC P.
  
 2) P1: THE NOTES INDICATE A STACKABLE WD, HOWEVER THE
 PLANS SHOW THE UNITS SIDE BY SIDE. PLEASE CORRECT- SEC.
 107.2.1 WPB.
  
 3) P2: THE 1ST REVIEW COMMENT #2 STILL PARTIALLY
 EXISTS. A) PLEASE SHOW LAVATORY KNEE AND TOE
 CLEARANCES- PAGES 7.47- 7.52 FHDA. B) PLEASE SHOW THE
 DEPTH MEASUREMENT OF THE NEW SHOWER TO BE NO LESS THAN
 36-INCHES PER PAGE 7.58 FHDA.
  
 4) P2: THE 1ST REVIEW COMMENT #3 REQUESTING GRAB BAR
 REINFORCEMENT LOCATIONS STILL EXISTS. PLEASE PROVIDE
 ELEVATION DRAWINGS IN ACCORDANCE WITH-
 PAGES 6.3- 6.8- WATER CLOSETS.
 PAGES 6.12- 6.13- SHOWERS
 PAGES 6.14- 6.16 REINFORCEMENT METHODS
 FOR ADDITIONAL DRAWINGS PLEASE SEE FIGURES 3 & 5 OF THE
 FAIR HOUSING ACCESSIBILITY GUIDELINES CONTAINED IN THE
 FBC ACC.
  
 5) P2: THE HEIGHT MEASUREMENT FOR THE SHOWER SEAT IS
 NOT LEGIBLE. PLEASE REFER TO PAGE 6.13 FHDA. THE HEIGHT
 SHALL BE 17-19 INCHES FROM THE FINISHED SHOWER FLOOR.
  
 6) THE REQUESTED WATER DISTRIBUTION RISER WAS NOT
 PROVIDED. PLEASE PROVIDE THE DRAWING WHICH SHALL
 INCLUDE THE LOCATION OF THE WATER HEATER AND HOT WATER
 PIPING PLAN- SEC. 607.1 FBC P.
  
 7) P2: PLEASE SHOW THE CENTERLINE OF THE WATER CLOSET
 DRAIN WILL BE 18 INCHES MEASURED FROM THE ADJACENT
 FINISHED WALL- PAGE 7.43 FHDA.
  
 8) P3: SHOW THE SHOWER PAN LINER WILL BE PITCHED ONE
 FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (1/4 INCH
 PER FT. OR 2% SLOPE)- SEC. 417.5.2 FBC P.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2022-01-10 Cont ID  
Sent By ccole Date 2022-01-10 Time 09:54 Rev Time 0.00
Received By ccole Date 2022-01-10 Time 08:05 Sent To  
Notes
2022-01-10 09:55:322ND REVIEW FBC-2020 PLUMBING
 PERMIT- 21100660
 1/10/2022
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
 FAIR HOUSING DESIGN ACT MANUAL
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET P1: THE SANITARY ISOMETRIC DRAWING DOES NOT
 APPEAR TO REFLECT THE ACTUAL BUILDING DRAIN LAYOUT AS
 SHOWN ON THE FLOOR PLAN. A) BASED ON THE FLOOR PLAN THE
 KITCHEN SINK DRAIN SHALL CONNECT DOWNSTREAM OF THE
 WASHING MACHINE DRAIN CONNECTION AND BE INDIVIDUALLY
 VENTED- SECS. 910 & 911 FBC P. B) THE HAIR SINK DRAINS
 SHALL CONNECT DOWNSTREAM OF THE WC AND LAV AND SHALL BE
 INDIVIDUALLY VENTED IN ACCORDANCE WITH SEC. 912.1 WET
 VENTING FBC P.
  
 2) P1: THE NOTES INDICATE A STACKABLE WD, HOWEVER THE
 PLANS SHOW THE UNITS SIDE BY SIDE. PLEASE CORRECT- SEC.
 107.2.1 WPB.
  
 3) P2: THE 1ST REVIEW COMMENT #2 STILL PARTIALLY
 EXISTS. A) PLEASE SHOW LAVATORY KNEE AND TOE
 CLEARANCES- PAGES 7.47- 7.52 FHDA. B) PLEASE SHOW THE
 DEPTH MEASUREMENT OF THE NEW SHOWER TO BE NO LESS THAN
 36-INCHES PER PAGE 7.58 FHDA.
  
 4) P2: THE 1ST REVIEW COMMENT #3 REQUESTING GRAB BAR
 REINFORCEMENT LOCATIONS STILL EXISTS. PLEASE PROVIDE
 ELEVATION DRAWINGS IN ACCORDANCE WITH-
 PAGES 6.3- 6.8- WATER CLOSETS.
 PAGES 6.12- 6.13- SHOWERS
 PAGES 6.14- 6.16 REINFORCEMENT METHODS
 FOR ADDITIONAL DRAWINGS PLEASE SEE FIGURES 3 & 5 OF THE
 FAIR HOUSING ACCESSIBILITY GUIDELINES CONTAINED IN THE
 FBC ACC.
  
 5) P2: THE HEIGHT MEASUREMENT FOR THE SHOWER SEAT IS
 NOT LEGIBLE. PLEASE REFER TO PAGE 6.13 FHDA. THE HEIGHT
 SHALL BE 17-19 INCHES FROM THE FINISHED SHOWER FLOOR.
  
 6) THE REQUESTED WATER DISTRIBUTION RISER WAS NOT
 PROVIDED. PLEASE PROVIDE THE DRAWING WHICH SHALL
 INCLUDE THE LOCATION OF THE WATER HEATER AND HOT WATER
 PIPING PLAN- SEC. 607.1 FBC P.
  
 7) P2: PLEASE SHOW THE CENTERLINE OF THE WATER CLOSET
 DRAIN WILL BE 18 INCHES MEASURED FROM THE ADJACENT
 FINISHED WALL- PAGE 7.43 FHDA.
  
 8) P3: SHOW THE SHOWER PAN LINER WILL BE PITCHED ONE
 FOURTH UNIT VERTICAL IN 12 UNITS HORIZONTAL (1/4 INCH
 PER FT. OR 2% SLOPE)- SEC. 417.5.2 FBC P.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-11-15 Cont ID  
Sent By ccole Date 2021-11-15 Time 15:10 Rev Time 0.00
Received By ccole Date 2021-11-15 Time 12:37 Sent To  
Notes
2021-11-15 15:13:141ST REVIEW FBC-2020 PLUMBING
 PERMIT- 21100660
 11/15/2021
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
 FAIR HOUSING DESIGN ACT MANUAL
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET A-1: PROVIDE DESIGN CRITERIA FOR THE PROJECT
 INCLUDING A LIST OF CURRENT CODES AND STANDARDS-
 SECTION 107.2.1 WPB.
  
 2) A-1 & P-1: FAIR HOUSING ACT COMPLIANCE: TWO CITY
 PLAZA IS A MULTI-STORY CONDOMINIUM BUILDING THAT WERE
 DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE FAIR
 HOUSING ACT DESIGN GUIDELINES. REFER TO PAGE 7 OF THE
 MANUAL WHICH REQUIRES THE GROUND FLOOR LEVEL OF UNIT
 101 TO IN COMPLIANCE WITH THE GUIDELINES.
 A) THE DESIGN PROFESSIONAL OF RECORD SHALL INDICATE ON
 THE PLANS WHICH OF THE TWO BATHROOM TYPES IS THE BASIS
 OF DESIGN- SPECIFICATION TYPE A OR B ON THE PLANS.
 PLEASE REFER TO PAGES 7.34- 7.39 OF THE DESIGN MANUAL
 FOR EXPLANATORY INFORMATION ON SPECIFICATION A & B AND
 SHOW COMPLIANCE.
 2) REFER TO CHAPTER 7 (REQUIREMENT 7 USABLE KITCHENS &
 USABLE BATHROOMS) AND PROVIDE ENLARGED, DIMENSIONED
 KITCHEN AND BATHROOM DRAWINGS AND DETAILS. THE PLANS
 SHALL BE IN COMPLIANCE WITH THE SECTIONS LISTED BELOW-
 PAGES 7.1- 7.6 CLEAR FLOOR SPACES FOR SINKS AND
 APPLIANCES
 PAGES 7.7- 7.11 CLEARANCES BETWEEN KITCHEN COUNTERS AND
 ALL OPPOSING ELEMENTS.
 PAGES 7.12- 7.16 REMOVABLE SINK AND APPLIANCE CABINET
 DOORS INCLUDING KNEE SPACES.
 PAGES 7.40-7.46 WATER CLOSET CLEAR FLOOR SPACES.
 PAGES 7.47- 7.52: LAVATORY AND VANITY CLEAR FLOOR AND
 KNEE AND TOE CLEARANCES.
 PAGES 7.56- 7.59: SHOWER CLEAR FLOOR SPACE AND CONTROL
 LOCATIONS INCLUDING SHOWER DIMENSIONS.
  
 3) REFER TO CHAPTER 6 (REINFORCED WALLS FOR GRAB BARS).
 BASED ON CHAPTER 7 COMPLIANCES LISTED ABOVE, PLEASE
 PROVIDE DRAWINGS AND DETAILS SHOWING GRAB BAR
 REINFORCEMENT LOCATIONS AND INSTALLATION DETAILS.
 PAGES 6.3- 6.8- WATER CLOSETS.
 PAGES 6.12- 6.13- SHOWERS
 PAGES 6.14- 6.16 REINFORCEMENT METHODS
  
 4) P-1: THE ISOMETRIC DRAWING DOES NOT SHOW THE
 REQUIRED VENTS FOR THE PLUMBING FIXTURES- SECTION
 901.2.1 FBC P.
  
 5) P-1: THE 2-INCH VERTICAL DRAIN STACK AND HORIZONTAL
 BRANCH ARE UNDERSIZED- MINIMUM 3-INCH DRAINS ARE
 REQUIRED- SECTION 406.2 FBC P.
  
 6) P-1: PLEASE OUTLINE THE NEW DRAIN LOCATIONS ON THE
 FLOOR PLAN AND PROVIDE A SLAB REPAIR DETAIL- SECTION
 107.2.1 WPB.
  
 7) P-1: PROVIDE A WATER DISTRIBUTION RISER DRAWING-
 SECTION 107.3.5.1.3 WPB. PROVIDE SYMBOLS ON THE DRAWING
 TO INDICATE LOCATIONS OF REQUIRED WATER HAMMER
 ARRESTORS AND BACKFLOW PREVENTERS- SECTION 604.9 &
 608.3 FBC P.
  
 8) P-1 & P-2: PROVIDE A PLUMBING FIXTURE SCHEDULE
 LISTING THE MAKES AND MODELS OF THE WATER CLOSETS,
 LAVATORIES, SHOWER VALVES AND FAUCETS, KITCHEN SINK,
 DISHWASHING MACHINE, WASHING MACHINE- SECTIONS 405- 425
 FBC P.
  
 9) P-1 & P-2: INDICATE THE TYPE OF FINISH MATERIALS FOR
 THE FLOORS AND WALLS OF THE SHOWERS- 421.5.1 AND
 PROVIDE A SHOWER PAN DETAIL- 421.5.2 FBC P.
  
 10) P-1: INDICATE THE TYPE OF 2X4 WOOD BACKING TO BE
 INSTALLED FOR THE GRAB BAR REINFORCEMENTS AND PROVIDE
 INSTALLATION DETAILS- SECTIONS 603.1 AND 1607.8.2 FBC
 B.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status N Date 2021-12-22 Cont ID  
Sent By ccole Date 2021-12-22 Time 09:57 Rev Time 0.00
Received By ccole Date 2021-12-22 Time 09:57 Sent To  
Notes
2021-12-22 09:58:26CONTRACTOR DRAWINGS- DIG/SIG REVIEW NOT REQUIRED.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-10-15 Cont ID  
Sent By mpeterso Date 2021-10-15 Time 10:01 Rev Time 0.00
Received By mpeterso Date 2021-10-15 Time 10:00 Sent To  
Notes
2021-10-15 10:01:48CONTRACTOR DRAWINGS NOT REQUIRED TO HAVE SIGNATURE
 REVEIW

Review Stop Z ZONING
Rev No 1 Status N Date 2021-10-27 Cont ID  
Sent By aaponte Date 2021-10-27 Time 10:50 Rev Time 0.00
Received By ckimmerl Date 2021-10-27 Time 10:50 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved