Plan Review Details - Permit 21091214
Plan Review Stops For Permit 21091214
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-07-18 Cont ID  
Sent By shill Date 2022-07-18 Time 16:10 Rev Time 0.00
Received By shill Date 2022-07-18 Time 16:10 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-01-28 Cont ID  
Sent By rmcdouga Date 2022-01-28 Time 14:09 Rev Time 0.00
Received By rmcdouga Date 2022-01-28 Time 14:09 Sent To  
Notes
2022-01-28 14:18:48PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE DESCRIPTION OF WORK ON THE APPLICATION IS TO
 REPLACE AN EXISTING GENERATOR. THE SCOPE OF WORK ON THE
 PLANS INCLUDES REPLACING ANTENNAS AND OTHER EQUIPMENT.
 PLEASE CLARIFY. FBC AMENDMENTS 107.2.1
  
 2) BASED ON THE SCOPE OF WORK, THE VALUATION ON THE
 APPLICATION IS LOW. BUILDING PERMIT VALUATION. FOR
 PERMITTING PURPOSES, VALUATION OF FBC 109.3 BUILDINGS
 AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR
 FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN
 FEES, MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION COST
 ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS
 PUBLISHED BY INTERNATIONAL CODE CONGRESS. FINAL
 BUILDING PERMIT VALUATION SHALL BE SET BY THE BUILDING
 OFFICIAL.
  
 3) PROVIDE WINDLOAD ANCHORING DETAILS FOR THE GENERATOR
 TO STAND ATTACHMENT. IF THE OTHER EQUIPMENT IS PART OF
 THIS PERMIT PROVIDE ANCHORING DETAILS FOR THEM AS WELL.
 FBC 1609
  
 4) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH
 OF THE REVIEW COMMENTS HAS BEEN ADDRESSED.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-06-26 Cont ID  
Sent By jleahy Date 2022-06-26 Time 12:08 Rev Time 0.00
Received By jleahy Date 2022-06-26 Time 11:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-01-21 Cont ID  
Sent By jleahy Date 2022-01-21 Time 13:36 Rev Time 0.00
Received By jleahy Date 2022-01-21 Time 13:33 Sent To  
Notes
2022-01-21 13:39:53ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 PLEASE SUBMIT A COST BRAKE DOWN FOR THE REPLACEMENT OF
 THE GENERATOR. LABOR, MATERIALS. GENERATOR TO BE
 INCLUDED, TRANSFER SWITCH REPLACEMENT?
  
 SUBMIT A RISER DIAGRAM SHOWING WIRE SIZES AND LOCATION
 OF TRANSFER EQUIPMENT. 215.5

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-06-03 Cont ID  
Sent By pleduc Date 2022-06-03 Time   Rev Time 0.00
Received By pleduc Date 2022-06-03 Time 10:41 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-12-22 Cont ID  
Sent By pleduc Date 2021-12-22 Time   Rev Time 0.00
Received By pleduc Date 2021-12-22 Time 14:41 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-06-06 Cont ID  
Sent By rwbrown Date 2022-06-06 Time 08:44 Rev Time 0.00
Received By rwbrown Date 2022-06-06 Time 08:37 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-12-27 Cont ID  
Sent By lcrespo Date 2021-12-27 Time 13:00 Rev Time 0.00
Received By lcrespo Date 2021-12-27 Time 13:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-07-18 Cont ID  
Sent By shill Date 2022-07-18 Time 16:11 Rev Time 0.00
Received By shill Date 2022-06-02 Time 13:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-28 Cont ID  
Sent By lcrespo Date 2022-01-28 Time 14:10 Rev Time  
Received By rmcdouga Date 2021-12-21 Time 06:02 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2022-06-06 Cont ID  
Sent By rwbrown Date 2022-06-06 Time 08:44 Rev Time 0.00
Received By rwbrown Date 2022-06-06 Time 08:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-12-27 Cont ID  
Sent By lcrespo Date 2021-12-27 Time 13:00 Rev Time 0.00
Received By lcrespo Date 2021-12-27 Time 13:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-07-18 Cont ID  
Sent By shill Date 2022-07-18 Time 16:11 Rev Time 0.00
Received By shill Date 2022-07-18 Time 16:11 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-01-28 Cont ID  
Sent By rmcdouga Date 2022-01-28 Time 14:09 Rev Time 0.00
Received By rmcdouga Date 2022-01-28 Time 14:09 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-07-08 Cont ID  
Sent By llouie Date 2022-07-08 Time   Rev Time 0.00
Received By llouie Date 2022-07-08 Time   Sent To  
Notes
2022-07-08 08:39:58REFERENCE: WCF 22-05.

Review Stop Z ZONING
Rev No 1 Status P Date 2021-12-28 Cont ID  
Sent By vbroglia Date 2021-12-28 Time 10:06 Rev Time 0.00
Received By vbroglia Date 2021-12-28 Time 10:06 Sent To  
Notes
***NONE***