Plan Review Details - Permit 21090969
Plan Review Stops For Permit 21090969
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-12-18 Cont ID  
Sent By cthroop Date 2021-12-18 Time 09:26 Rev Time 0.00
Received By cthroop Date 2021-12-17 Time 15:26 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-10-23 Cont ID  
Sent By cthroop Date 2021-10-23 Time 10:34 Rev Time 0.00
Received By cthroop Date 2021-10-23 Time 08:40 Sent To  
Notes
2021-10-23 10:46:21BUILDING PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE A COPY OF THE MOST RECENT BOUNDRY LINE
 SURVEY.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 2. PROVIDE A SITE DRAINAGE PLAN. FBC R401,3.
 IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND
 INCLUDED BOUNDARY LINE SURVEY. FBC R401.3. SITE
 DRAINAGE
 SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER
 CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT
 DOES NOT CREATE A HAZARD.
 LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM
 FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6
 INCHES WITHIN THE FIRST 10 FEET.
  
 3. PROVIDE A ROOF SHEATHING FASTENER SCHEDULE FOR
 ENHANCED UPLIFT ARAS 2 AND 3.
 TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING
 SCHEDULE FOR WOOD STRUCTURAL PANELS.
  
 4. SPECIFY EXT. WALL INSULATION ON PLANS.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 5. PROVIDE THE ICC-ES REPORT FOR THE ICYNENE SPRAY FOAM
 INSULATION.
 REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF
 RECORD.
  
 6. PROVIDE PRODUCT APPROVALS FOR WINDOWS AND EXT.
 DOORS.
 FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
  
 7. PROVIDE A WINDOW AND DOOR SCHEDULE. INCLUDE ROUGH
 OPENINGS AND DESIGN PRESSURES.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 8. PROVIDE AN ENERGY SUBMITTAL.
 FBCE-101.5.1.1.2 SIMULATED PERFORMANCE ALTERNATIVE.
 AN ACCURATELY COMPLETED RESIDENTIAL BUILDING FORM R405
 (GENERATED BY COMMISSION APPROVED SOFTWARE) SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL TO DEMONSTRATE CODE
 COMPLIANCE BY SECTION 405.
  
 9. PROVIDE SHOP DRAWINGS AND MANUFACTURERS INSTALLATION
 INSTRUCTIONS FOR OUTDOOR KITCHEN.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-10-06 Cont ID  
Sent By jleahy Date 2021-10-06 Time 16:13 Rev Time 0.00
Received By jleahy Date 2021-10-06 Time 16:12 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 13:21 Rev Time 0.00
Received By lcrespo Date 2021-10-06 Time 13:21 Sent To  
Notes
2021-10-06 13:22:22GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-12-18 Cont ID  
Sent By cthroop Date 2021-12-18 Time 09:26 Rev Time 0.00
Received By cthroop Date 2021-11-18 Time 06:45 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-23 Cont ID  
Sent By cthroop Date 2021-10-23 Time 10:46 Rev Time 0.00
Received By cthroop Date 2021-09-30 Time 15:31 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status N Date 2022-01-03 Cont ID  
Sent By cpuell Date 2022-01-03 Time 10:08 Rev Time 0.00
Received By cpuell Date 2021-12-20 Time 10:18 Sent To  
Notes
2022-01-03 08:24:42RECEIPT MU-2021-059080 - $22.46 PAID
2021-12-20 10:19:0812/20/21 EMAILED IMPACT OFFICE TO REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-10-23 Cont ID  
Sent By cthroop Date 2021-10-23 Time 10:33 Rev Time 0.00
Received By cthroop Date 2021-10-23 Time 10:33 Sent To  
Notes
2021-10-23 10:34:01IMPACT FEE QUESTIONNAIRE
  
 PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT
 LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO
 THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF.
 THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ
 B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
 UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE
 RECEIPT TO PROJECT DOX OR EMAIL IT TO
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-11-19 Cont ID  
Sent By medwards Date 2021-11-19 Time 08:52 Rev Time 0.00
Received By medwards Date 2021-11-19 Time 08:52 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-10-02 Cont ID  
Sent By medwards Date 2021-10-02 Time 09:03 Rev Time 0.00
Received By medwards Date 2021-10-02 Time 09:03 Sent To  
Notes
2021-10-02 09:03:301ST REVIEW FBC-2020 MECHANICAL
 PERMIT-21090969
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE
 FBC M- FLORIDA MECHANICAL CODE
 FBC EC- FLORIDA ENERGY CONSERVATION
 FBC FG- FLORIDA FUEL GAS
 FBC EX- FLORIDA EXISTING BUILDING CODE
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE PROVIDE THE ENERGY CALCULATIONS AS THIS
 PROJECT IS ADDING CONDITIONED SPACE.
  
 2) PLEASE PROVIDE THE MECHANICAL EQUIPMENT SIZING
 CALCULATIONS.
  
 3) SHEET A-04: DETAIL 4 INDICATES AN OPTIONAL EXHAUST
 HOOD ABOVE BBQ, 1200 CFM. PLEASE REMOVE THE WORD
 OPTIONAL AS THE BBQ GRILL INSTALLATION INSTRUCTIONS
 WILL REQUIRE A HOOD IF THE CEILING OF THIS AREA IS
 COMBUSTIBLE MATERIAL. FBC RES M1306.1
  
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 11:05 Rev Time 0.00
Received By lcrespo Date 2021-10-06 Time 10:36 Sent To  
Notes
2021-10-06 11:05:5310/06/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2021-10-23 Cont ID  
Sent By cthroop Date 2021-10-23 Time 10:32 Rev Time 0.00
Received By cthroop Date 2021-10-23 Time 08:40 Sent To  
Notes
2021-10-23 10:33:18PROVISO ON PG. A-03: A SEPERATE ROOFING PERMIT IS
 REQUIRED. CT

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-12-18 Cont ID  
Sent By cthroop Date 2021-12-18 Time 09:26 Rev Time 0.00
Received By cthroop Date 2021-12-17 Time 15:26 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-10-02 Cont ID  
Sent By medwards Date 2021-10-02 Time 09:03 Rev Time 0.00
Received By medwards Date 2021-10-02 Time 09:03 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-12-13 Cont ID  
Sent By ajones Date 2021-12-13 Time 16:58 Rev Time 0.00
Received By ajones Date 2021-12-13 Time 16:58 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-10-19 Cont ID  
Sent By rthermid Date 2021-10-19 Time   Rev Time  
Received By rthermid Date 2021-10-19 Time   Sent To I
Notes
2021-10-19 08:23:44A SEPERATE PERMIT IS REQUIRED FOR ALL THE WORK
 PROPOSED.
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved