Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-10-26 Cont ID  
Sent By cwalker Date 2021-10-26 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-06 Cont ID  
Sent By cwalker Date 2021-10-06 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-10-28 Cont ID  
Sent By ccole Date 2021-10-28 Time 16:06 Rev Time 0.00
Received By ccole Date 2021-10-28 Time 16:06 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-10-04 Cont ID  
Sent By ccole Date 2021-10-04 Time 18:02 Rev Time 0.00
Received By ccole Date 2021-10-04 Time 13:33 Sent To  
Notes
2021-10-04 18:10:121ST REVIEW FBC-2017 FUEL GAS
 PERMIT- 21090831
 10/4/21
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED. THE GAS PLANS FOR THE
 MASTER PERMIT- 21020294 WERE APPROVED WITH A PROVISO
 REQUIRING SEPARATE PERMITS AND PLANS FOR INSTALLATION
 OF THE COFFEE ROASTERS, GAS CONNECTIONS, AND EXHAUST
 VENTILATION SYSTEM. THE COMMENTS BELOW ARE ADDRESSING
 THE PLANS AND SUBMITTALS UNDER THIS SEPARATE PERMIT.
  
 1) GAS PIPING AND PRESSURES: ACCORDING TO THE SUBMITTED
 COFFEE ROASTER SPECS, THE GAS INPUT PRESSURE IS 19.68
 INCHES WATER COLUMN FOR THE G90, AND 4.0 IN. W.C. FOR
 THE L12. THE GAS RISER DRAWING UNDER PERMIT 21020294
 SHOWS ONE REGULATOR CONTROLLING THE GAS FLOW TO BOTH
 ROASTERS, HOWEVER BASED ON THE DIFFERING INPUT
 PRESSURES, A REGULATOR IS REQUIRED FOR EACH ROASTER.
 PLEASE SUBMIT A REVISED RISER DRAWING SHOWING THE
 LOCATIONS OF THE REGULATORS. SUBMIT SPECS FOR THE
 REGULATORS MARKED UP OR HIGHLIGHTED TO SHOW THE
 SELECTED MODELS AND INPUT AND OUTPUT PIPE SIZES AND
 PRESSURES- SECTION 410.2 FBC FG. A) THE SUBMITTED LABEL
 PHOTO FOR THE IR-1 ROASTER DOES NOT PROVIDE LP GAS
 INPUT PRESSURE. PLEASE PROVIDE THE PRESSURE AND SUBMIT
 SPECS FOR THE REGULATOR.
  
 2) COMBUSTION AIR: THE SUBMITTED LETTER FROM BMC
 CONSULTING DOES NOT ADDRESS COMBUSTION AIR FOR THE
 ROASTERS. ON SHEET P2.0 OF THE MASTER PLAN, REFERENCE
 IS MADE TO SHEET M3.1 FOR THE COMBUSTION AIR
 CALCULATIONS USING MECHANICAL THE AIR SYSTEMS IN THE
 SPACE HOWEVER THE CALCULATION IS NOT SHOWN ON THE PLAN.
 PLEASE PROVIDE THE CALCULATION AND REFER TO SECTION
 304.9.2 FBC FG: EACH OF THE ROASTERS SHALL BE
 INTERLOCKED WITH THE MECHANICAL AIR SUPPLY SYSTEM TO
 PREVENT MAIN BURNER OPERATION WHEN THE MECHANICAL AIR
 SYSTEM IS NOT IN OPERATION. PLEASE NOTE THAT SECTION
 304.5 ALLOWS THE USE OF INDOOR AIR FOR COMBUSTION AS AN
 ALTERNATIVE TO USING MECHANICALLY SUPPLIED AIR.
  
 3) MAKEUP AIR: THE SUBMITTED LETTER FROM BMC CONSULTING
 DOES NOT ADDRESS MAKEUP AIR FOR THE ROASTERS. MASTER
 PLAN SHEET P2.0 LIST AIR CONSUMPTION VALUES FOR THE
 ROASTERS. REFER TO SECTION 304.9.1 FBC FG AND INDICATE
 HOW THE MAKEUP AIR IS BEING PROVIDED FOR THE EXHAUST
 FANS. PLEASE NOTE THAT MAKEUP AIR IS DEFINED AS ANY
 COMBINATION OF OUTDOOR AIR AND TRANSFER AIR- SECTION
 202. PLEASE NOTE THERE IS A DISCREPANCY BETWEEN THE
 PLAN AND THE L12 SPECS WHICH INDICATES AIR CONSUMPTION
 VALUES OF 410 CFMS COLD AND 402 CFMS HOT- SHEET P2.0
 INDICATES 486 CFMS.
  
 4) EXHAUST VENTILATION SYSTEM:
 A) THERE APPEARS TO BE A CONFLICT BETWEEN THE L12
 SPECIFICATIONS AND THE NEW M3.2 PLAN SHEET. THE L12
 SUBMITTAL INDICATES ON PAGE 10 THAT THE "ANY
 NEAR-HORIZONTAL DUCTING SHOULD HAVE AN UPWARD
 INCLINATION OF AT LEAST 45 DEGREES." THE NEW SUBMITTED
 PLAN SHEET M3.2 SHOWS THE MAIN 18 INCH EXHAUST DUCT
 SLOPING DOWNWARD, AND THE LETTER FROM BMC CONSULTING
 STATES " THE 18" EXHAUST DUCTWORK IS SLOPED TOWARD THE
 EXTERIOR AT A MINIMUM OF 1/8 " PER FOOT, WHICH IS NOT
 REQUIRED BUT WAS DESIGNED TO FURTHER ENHANCE THE FLOW
 OF THE EXHAUST." PLEASE PROVIDE FURTHER EXPLANATORY
 INFORMATION IN THE LETTER TO CLARIFY THIS CONFLICT.
 B) PLEASE REMOVE THE CUT SHEET FOR THE STAINLESS STEEL
 DUCTWORK FROM THE NEW PLAN SHEET M3.2. THE LETTER FROM
 BMC CONSULTING SPECIFIES G90 DUCTWORK.
 C) THE LETTER FROM BMC CONSULTING APPEARS TO INDICATE
 THAT THE EXHAUST SYSTEM IS AN ENGINEERED DESIGN
 PROVIDED BY THE EOR. ENGINEERED DESIGNS ARE ALLOWED FOR
 SINGLE WALL METAL PIPE GAS VENTING PER SECTION 503.7.9
 (3) FBC FG, HOWEVER IN ORDER TO VERIFY THE SYSTEM WILL
 BE CONSTRUCTED PROPERLY PER THE ENGINEER'S DESIGN, AND
 FOR FIELD INSPECTION PURPOSES, PLEASE PROVIDE THE DUCT
 LENGTH MEASUREMENTS ON THE PLAN SHEET M3.2- SECTION
 107.2.1 WPB.
 D) THE LETTER FROM BMC CONSULTING INCLUDES AN EXCERPT
 FROM NORDFAB?S DESIGN REVIEW. PLEASE SUBMIT A COPY OF
 THE NORDFAB DESIGN REVIEW.
 E) PLEASE EXPAND ON THIS STATEMENT IN THE LETTER- "BMC
 CONSULTING IS CONFIDENT, PENDING THE PROPER
 INSTALLATION BY THE NORDFAB CERTIFIED INSTALLING
 CONTRACT & VENTILATION SPECIALIST (HIGH TECH DUCT
 WERKS, LLC), THE NORFAB (MISSPELLED) DUCTWORK WILL
 OPERATE AS REQUIRED TO MEET THE CODE
 REQUIREMENTS/INTENT OF THE FBC 2017, MECHANICAL EDITION
 FOR THE TRANSPORT OF HOT EXHAUST AIR." PLEASE INDICATE
 SPECIFICALLY WHICH CODE SECTIONS AND CLARIFY HOW PROPER
 INSTALLATION WILL BE CONFIRMED. FOR EXAMPLE- WILL BMC
 CONSULTING PERFORM FIELD INSPECTIONS, AND WILL
 "STARTUP" TESTING BE PERFORMED?
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCOLE@WPB
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-11-17 Cont ID  
Sent By mpeterso Date 2021-11-17 Time 10:22 Rev Time 0.00
Received By mpeterso Date 2021-11-17 Time 10:22 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2021-11-15 Time   Rev Time 0.00
Received By lmarchan Date 2021-11-04 Time 08:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-11-01 Cont ID  
Sent By medwards Date 2021-11-01 Time 07:41 Rev Time 0.00
Received By medwards Date 2021-10-25 Time 11:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-06 Cont ID  
Sent By jleahy Date 2021-10-06 Time 14:20 Rev Time 0.00
Received By medwards Date 2021-10-01 Time 18:43 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-11-01 Cont ID  
Sent By medwards Date 2021-11-01 Time 07:41 Rev Time 0.00
Received By medwards Date 2021-11-01 Time 07:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-10-06 Cont ID  
Sent By medwards Date 2021-10-06 Time 14:19 Rev Time 0.00
Received By medwards Date 2021-10-06 Time 14:18 Sent To  
Notes
2021-10-06 14:19:50PLEASE SEE THE FUEL GAS REVIEWERS COMMENTS BELOW:
  
  
 1ST REVIEW FBC-2017 FUEL GAS
 PERMIT- 21090831
 10/4/21
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED. THE GAS PLANS FOR THE
 MASTER PERMIT- 21020294 WERE APPROVED WITH A PROVISO
 REQUIRING SEPARATE PERMITS AND PLANS FOR INSTALLATION
 OF THE COFFEE ROASTERS, GAS CONNECTIONS, AND EXHAUST
 VENTILATION SYSTEM. THE COMMENTS BELOW ARE ADDRESSING
 THE PLANS AND SUBMITTALS UNDER THIS SEPARATE PERMIT.
  
 1) GAS PIPING AND PRESSURES: ACCORDING TO THE SUBMITTED
 COFFEE ROASTER SPECS, THE GAS INPUT PRESSURE IS 19.68
 INCHES WATER COLUMN FOR THE G90, AND 4.0 IN. W.C. FOR
 THE L12. THE GAS RISER DRAWING UNDER PERMIT 21020294
 SHOWS ONE REGULATOR CONTROLLING THE GAS FLOW TO BOTH
 ROASTERS, HOWEVER BASED ON THE DIFFERING INPUT
 PRESSURES, A REGULATOR IS REQUIRED FOR EACH ROASTER.
 PLEASE SUBMIT A REVISED RISER DRAWING SHOWING THE
 LOCATIONS OF THE REGULATORS. SUBMIT SPECS FOR THE
 REGULATORS MARKED UP OR HIGHLIGHTED TO SHOW THE
 SELECTED MODELS AND INPUT AND OUTPUT PIPE SIZES AND
 PRESSURES- SECTION 410.2 FBC FG. A) THE SUBMITTED LABEL
 PHOTO FOR THE IR-1 ROASTER DOES NOT PROVIDE LP GAS
 INPUT PRESSURE. PLEASE PROVIDE THE PRESSURE AND SUBMIT
 SPECS FOR THE REGULATOR.
  
 2) COMBUSTION AIR: THE SUBMITTED LETTER FROM BMC
 CONSULTING DOES NOT ADDRESS COMBUSTION AIR FOR THE
 ROASTERS. ON SHEET P2.0 OF THE MASTER PLAN, REFERENCE
 IS MADE TO SHEET M3.1 FOR THE COMBUSTION AIR
 CALCULATIONS USING MECHANICAL THE AIR SYSTEMS IN THE
 SPACE HOWEVER THE CALCULATION IS NOT SHOWN ON THE PLAN.
 PLEASE PROVIDE THE CALCULATION AND REFER TO SECTION
 304.9.2 FBC FG: EACH OF THE ROASTERS SHALL BE
 INTERLOCKED WITH THE MECHANICAL AIR SUPPLY SYSTEM TO
 PREVENT MAIN BURNER OPERATION WHEN THE MECHANICAL AIR
 SYSTEM IS NOT IN OPERATION. PLEASE NOTE THAT SECTION
 304.5 ALLOWS THE USE OF INDOOR AIR FOR COMBUSTION AS AN
 ALTERNATIVE TO USING MECHANICALLY SUPPLIED AIR.
  
 3) MAKEUP AIR: THE SUBMITTED LETTER FROM BMC CONSULTING
 DOES NOT ADDRESS MAKEUP AIR FOR THE ROASTERS. MASTER
 PLAN SHEET P2.0 LIST AIR CONSUMPTION VALUES FOR THE
 ROASTERS. REFER TO SECTION 304.9.1 FBC FG AND INDICATE
 HOW THE MAKEUP AIR IS BEING PROVIDED FOR THE EXHAUST
 FANS. PLEASE NOTE THAT MAKEUP AIR IS DEFINED AS ANY
 COMBINATION OF OUTDOOR AIR AND TRANSFER AIR- SECTION
 202. PLEASE NOTE THERE IS A DISCREPANCY BETWEEN THE
 PLAN AND THE L12 SPECS WHICH INDICATES AIR CONSUMPTION
 VALUES OF 410 CFMS COLD AND 402 CFMS HOT- SHEET P2.0
 INDICATES 486 CFMS.
  
 4) EXHAUST VENTILATION SYSTEM:
 A) THERE APPEARS TO BE A CONFLICT BETWEEN THE L12
 SPECIFICATIONS AND THE NEW M3.2 PLAN SHEET. THE L12
 SUBMITTAL INDICATES ON PAGE 10 THAT THE "ANY
 NEAR-HORIZONTAL DUCTING SHOULD HAVE AN UPWARD
 INCLINATION OF AT LEAST 45 DEGREES." THE NEW SUBMITTED
 PLAN SHEET M3.2 SHOWS THE MAIN 18 INCH EXHAUST DUCT
 SLOPING DOWNWARD, AND THE LETTER FROM BMC CONSULTING
 STATES " THE 18" EXHAUST DUCTWORK IS SLOPED TOWARD THE
 EXTERIOR AT A MINIMUM OF 1/8 " PER FOOT, WHICH IS NOT
 REQUIRED BUT WAS DESIGNED TO FURTHER ENHANCE THE FLOW
 OF THE EXHAUST." PLEASE PROVIDE FURTHER EXPLANATORY
 INFORMATION IN THE LETTER TO CLARIFY THIS CONFLICT.
 B) PLEASE REMOVE THE CUT SHEET FOR THE STAINLESS STEEL
 DUCTWORK FROM THE NEW PLAN SHEET M3.2. THE LETTER FROM
 BMC CONSULTING SPECIFIES G90 DUCTWORK.
 C) THE LETTER FROM BMC CONSULTING APPEARS TO INDICATE
 THAT THE EXHAUST SYSTEM IS AN ENGINEERED DESIGN
 PROVIDED BY THE EOR. ENGINEERED DESIGNS ARE ALLOWED FOR
 SINGLE WALL METAL PIPE GAS VENTING PER SECTION 503.7.9
 (3) FBC FG, HOWEVER IN ORDER TO VERIFY THE SYSTEM WILL
 BE CONSTRUCTED PROPERLY PER THE ENGINEER'S DESIGN, AND
 FOR FIELD INSPECTION PURPOSES, PLEASE PROVIDE THE DUCT
 LENGTH MEASUREMENTS ON THE PLAN SHEET M3.2- SECTION
 107.2.1 WPB.
 D) THE LETTER FROM BMC CONSULTING INCLUDES AN EXCERPT
 FROM NORDFAB?S DESIGN REVIEW. PLEASE SUBMIT A COPY OF
 THE NORDFAB DESIGN REVIEW.
 E) PLEASE EXPAND ON THIS STATEMENT IN THE LETTER- "BMC
 CONSULTING IS CONFIDENT, PENDING THE PROPER
 INSTALLATION BY THE NORDFAB CERTIFIED INSTALLING
 CONTRACT & VENTILATION SPECIALIST (HIGH TECH DUCT
 WERKS, LLC), THE NORFAB (MISSPELLED) DUCTWORK WILL
 OPERATE AS REQUIRED TO MEET THE CODE
 REQUIREMENTS/INTENT OF THE FBC 2017, MECHANICAL EDITION
 FOR THE TRANSPORT OF HOT EXHAUST AIR." PLEASE INDICATE
 SPECIFICALLY WHICH CODE SECTIONS AND CLARIFY HOW PROPER
 INSTALLATION WILL BE CONFIRMED. FOR EXAMPLE- WILL BMC
 CONSULTING PERFORM FIELD INSPECTIONS, AND WILL
 "STARTUP" TESTING BE PERFORMED?
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCOLE@WPB
  

Review Stop P PLUMBING
Rev No 2 Status N Date 2021-10-28 Cont ID  
Sent By ccole Date 2021-10-28 Time 16:04 Rev Time 0.00
Received By ccole Date 2021-10-28 Time 16:04 Sent To  
Notes
2021-10-28 16:05:43PLUMBING FOR THE PROJECT APPROVED UNDER THE MASTER
 PERMIT- 21020294.

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-10-04 Cont ID  
Sent By ccole Date 2021-10-04 Time 18:12 Rev Time 0.00
Received By ccole Date 2021-10-04 Time 13:33 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2021-11-17 Cont ID  
Sent By mpeterso Date 2021-11-17 Time 10:17 Rev Time 0.00
Received By mpeterso Date 2021-11-17 Time 10:17 Sent To  
Notes
2021-11-17 10:21:42DIGITALLY SEALED AND SIGNED, HOWEVER, THE SIGNATURE
 FROM THE ENGINEER OF RECORD APPEARS TO BE A SELF
 AUTHORIZED SIGNATURE. PROFESSIONAL ENGINEERS ARE
 REQUIRE TO HAVE THEIR IDENTITY AUTHENTICATED BY A
 CERTIFICATION AUTHORITY . F.A.C. 61G15023.004(2) (2)

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2021-11-15 Cont ID  
Sent By ccole Date 2021-11-15 Time 07:32 Rev Time 0.00
Received By ccole Date 2021-11-04 Time 17:49 Sent To  
Notes
2021-11-08 07:28:49THE CURRENT LETTER AND SIGNATURE AND SEAL ARE VOIDED
 BECAUSE AN UPDATED DIGITALLY SIGNED AND SEALED LETTER
 IS BEING SUBMITTED FOR REVIEW.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-10-28 Cont ID  
Sent By ccole Date 2021-10-28 Time 16:39 Rev Time 0.00
Received By ccole Date 2021-10-28 Time 16:39 Sent To  
Notes
2021-10-28 16:40:172ND SIGNATURE REVIEW
 PERMIT- 21090831
 10/28/21
  
 1) THE LETTER FROM BMC CONSULTING REQUIRES THE DIGITAL
 SIGNATURE AND SEAL OF THE ENGINEER OF RECORD. PLANS AND
 DOCUMENTS PREPARED BY A FL. LICENSED ENGINEER THAT ARE
 TRANSMITTED ELECTRONICALLY SHALL BEAR THE DIGITAL SEAL
 SIGNATURE OF THE ENGINEER- FL. STATUTE 471.025, AND
 SECTION 61G15-23.005 FAC.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-10-05 Cont ID  
Sent By jleahy Date 2021-10-05 Time 12:38 Rev Time 0.00
Received By jleahy Date 2021-10-05 Time 12:38 Sent To  
Notes
2021-10-05 12:40:46FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED
 NFPA 70 2011 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NOTHING IN PACKET IS SIGNED PLEASE SIGN AND DATE THE
 SUBMITTAL FOR REVIEW,
  
 PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN
 PROFESSIONAL OR THE CONTRACTOR QUALIFIER. FS
 471.003(2)(H); 471.025; FBC 107.2.1